Perfect Channel Gurun steel plant, also known as KKSSC Gurun steel plant; Perfect Channel Sdn Bhd (PCSB) plant, is an electric arc furnace (EAF) steel plant under construction in Gurun, Kedah, Malaysia.

Location

The map below shows the exact location of the plant in Gurun, Kedah, Malaysia:

Loading map...
  • Location: Lot 8068 Jalan Bedong Kawasan Perindustrian Gurun, 08100 Bedong, Kedah, Malaysia
  • Coordinates (WGS 84): 5.778871, 100.499070 (exact)

Background

Perfect Channel Sdn Bhd was founded in 2005 as a downstream production facility.[1] Kinsteel acquired 51% stake in the plant through Perfect Channel Sdn Bhd in 2006.[2] The plant had suspended operations since May 2019 due to a fire.[3][4]

In April 2020, Kinsteel reached an agreement to enter into a joint venture with China's Tianjin Qiangbang Industrial Co. Ltd to run the steel mill. The JV scheduled to build an electric arc furnace of capacity 500 ttpa in March 2021.[5]

According to a OECD 2022 report, the Gurun plant is planning to install crude steel capacities of 500 ttpa each using induction furnace and electric arc furnace methods.[6] As of November 2023, there has been no updates regarding either of the projects.

In June 2023, Konsortia Etiqa Sdn Bhd, a subsidiary of Ann Joo resources Bhd, acquired Perfect Channel Sdn Bhd for RM 10 million.[7]

Plant Details

Table 1: General Plant Details

Phase Plant status
Main plant Construction[8][9]
Expansion Announced[8][9]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant Kinsteel Bhd [45.0%]; Tianjiin Qiangbang Industrial Co Ltd [40.0%]; other [15.0%] 4295884048 [45%]; unknown [40%]; unknown [15%] E100000130725 [45%]; E100000131165 [40%]; E100000001753 [15%] Perfect Channel Sdn Bhd[10] 4296221913 E100000130773

Table 3: Process and Products

Phase Steel product category Steel products Main production equipment Detailed production equipment
Main plant semi-finished; finished rolled[11] billet; wire rod; spring steel flat bar; laminated leaf spring[11] other[12][9] IF (# unknown)[12][9]
Expansion semi-finished; finished rolled[11] billet; wire rod; spring steel flat bar; laminated leaf spring[11] EAF[12][9] EAF (# unknown)[12][9]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant announced 500 TTPA
Expansion announced 500 TTPA[12][9][13] 500 TTPA[12][9][13]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status*
Main plant announced
Expansion announced

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "Market Review of Building Materials in the Construction Industry under Competition Act 2010" (PDF). MyCC. 27 December, 2017. Retrieved 28 November, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  2. "Kinsteel expects to turn around Perwaja by year-end". TMSnet. 13 August, 2006. Retrieved 28 November, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  3. "Ann Joo acquires controlling stake in loss-making wire maker for RM10.1 mil | SEAISI". www.seaisi.org. Retrieved 2023-11-28.
  4. "Ann Joo buys shares in Perfect Channel from Kinsteel". The Star. Retrieved 2023-11-28.
  5. Corp, Yieh. "Yieh Corp Steel News". yieh.com. Retrieved 2023-11-29.
  6. "Latest developments in steelmaking capacity". OECD. 16 December, 2022. Retrieved 28 November, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  7. "Ann Joo buys shares in Perfect Channel from Kinsteel". The Star. Retrieved 2023-11-28.
  8. 8.0 8.1 (PDF) https://web.archive.org/web/20220111173338/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf. Archived from the original (PDF) on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 https://web.archive.org/web/20220112201614/https://www.thestar.com.my/business/business-news/2020/04/03/kinsteel-proposes-jv-to-operate-gurun-steel-plant. Archived from the original on 12 January 2022. {{cite web}}: Missing or empty |title= (help)
  10. https://www.thestar.com.my/business/business-news/2023/06/22/ann-joo-buys-shares-in-perfect-channel-from-kinsteel. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 https://web.archive.org/web/20240125055733/https://www.scrapmonster.com/news/kinsteel-announces-chinese-jv-to-operate-kedah-steel-plant/1/74923. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 12.4 12.5 (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 (PDF) https://web.archive.org/web/20220713032450/https://pubs.usgs.gov/myb/vol3/2017-18/myb3-2017-18-malaysia.pdf. Archived from the original (PDF) on 13 July 2022. {{cite web}}: Missing or empty |title= (help)

Resources