Porto de Sergipe power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Porto de Sergipe power station (Usina Termelétrica Porto de Sergipe) is an operating power station of at least 1593-megawatts (MW) in Barra dos Coqueiros, Sergipe, Brazil with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Porto de Sergipe power station Barra dos Coqueiros, Sergipe, Brazil -10.815646, -36.937062 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • I, III, IV, V: -10.815646, -36.937062

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
I Operating[2][3] fossil gas: LNG[4] 1593[5][6] combined cycle[3][7][8] not found 2020[3][1]
III Announced[9][10] fossil gas: LNG[10][11] 400[12][13] unknown not found
IV Announced[9][10] fossil gas: LNG[10][11] 617[12][13] unknown not found
V Announced[9][10] fossil gas: LNG[10][11] 299[12][13] unknown not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
I Centrais Elétricas de Sergipe[10][1] Eneva SA [100%][9][14] Eneva SA [100.0%]
III Centrais Elétricas de Sergipe[10][1] Eneva SA [100%][9][14] Eneva SA [100.0%]
IV Centrais Elétricas de Sergipe[10][1] Eneva SA [100%][9][14] Eneva SA [100.0%]
V Centrais Elétricas de Sergipe[10][1] Eneva SA [100%][9][14] Eneva SA [100.0%]

Background

The Porto de Sergipe I power station, which began commercial operations in March 2020[15], was originally owned by a consortium headed by New Fortress Energy[16]; in October 2022 Eneva SA acquired 100% ownership of the plant.[17] The project is fueled with liquefied natural gas imported through the Sergipe FSRU LNG terminal.[18]

As of October 2022, Eneva SA was contemplating future development of three additional units (Porto Sergipe III, IV and V) depending on market conditions.[19]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240125152719/https://dadosabertos.aneel.gov.br/dataset/siga-sistema-de-informacoes-de-geracao-da-aneel/resource/11ec447d-698d-4ab8-977f-b424d5deee6a. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240125100409/https://dadosabertos.aneel.gov.br/dataset/siga-sistema-de-informacoes-de-geracao-da-aneel. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20240125105121/https://eneva.com.br/nossos-negocios/geracao-de-energia/ute-porto-de-sergipe-i/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240125090805/https://eneva.com.br/nossos-negocios/geracao-de-energia/ute-porto-de-sergipe-i/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240125090149/https://dadosabertos.aneel.gov.br/dataset/siga-sistema-de-informacoes-de-geracao-da-aneel/resource/76310626-e2e0-4880-b199-d63fe287f279. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) http://energiaeambiente.org.br/wp-content/uploads/2022/12/termeletricas_IEMA_2021.pdf https://eneva.com.br/nossos-negocios/geracao-de-energia/ute-porto-de-sergipe-i/. http://energiaeambiente.org.br/wp-content/uploads/2022/12/termeletricas_IEMA_2021.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  7. (PDF) https://web.archive.org/web/20240125090130/https://energiaeambiente.org.br/wp-content/uploads/2022/12/termeletricas_IEMA_2021.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. (PDF) https://web.archive.org/web/20240125112148/https://www.idbinvest.org/sites/default/files/2018-03/anexo_ii._atm_1.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 https://web.archive.org/web/20240510202015/https://api.mziq.com/mzfilemanager/v2/d/6c663f3b-ae5a-4692-81d3-ab23ee84c1de/0acbed9e-9199-8bda-f128-27cf9ecb9b9b?origin=1. Archived from the original on 10 May 2024. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 10.9 https://web.archive.org/web/20240125082715/https://api.mziq.com/mzfilemanager/v2/d/6c663f3b-ae5a-4692-81d3-ab23ee84c1de/229c7257-3e2d-a00f-6a84-7a6991a69a88?origin=1. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 https://web.archive.org/web/20240125090814/https://www.in.gov.br/web/dou/-/portaria-n-708-de-8-de-junho-de-2021-324789440. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 https://web.archive.org/web/20240125100609/https://www.canalenergia.com.br/noticias/53213819/eneva-quer-inscrever-pipeline-da-celse-nos-leiloes-de-2022-e-2023. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 https://web.archive.org/web/20240125132513/https://api.mziq.com/mzfilemanager/v2/d/6c663f3b-ae5a-4692-81d3-ab23ee84c1de/d54e809b-6c1e-1413-3edb-dc608fbccf3e?origin=1. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 https://web.archive.org/web/20240514025519/https://ri.eneva.com.br/en/financial-information/subsidiary-information/spe-centrais-eletricas-de-sergipe/. Archived from the original on 14 May 2024. {{cite web}}: Missing or empty |title= (help)
  15. "UTE Porto de Sergipe I". Celse - Centrais Elétricas de Sergipe S.A. Archived from the original on May 3, 2021. Retrieved May 4, 2021.
  16. "Q4 2020 Investor Presentation (pp 11, 36, 40)". New Fortress Energy. March 2021.{{cite web}}: CS1 maint: url-status (link)
  17. "Eneva conclui compra da Celse por R$ 6,7 bilhões, maior aquisição da história da companhia". Eneva SA. October 3, 2022.{{cite web}}: CS1 maint: url-status (link)
  18. "UTE Porto de Sergipe I". Eneva. Retrieved 2022-11-21.{{cite web}}: CS1 maint: url-status (link)
  19. "Apresentação Corporativa (p 23)". Eneva. October 2022.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.