Prakash Industries Janjgir steel plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Prakash Industries Janjgir steel plant, also known as PIL, is a steel plant in Janjgir, Chhattisgarh, India that operates direct reduced iron (DRI) and steelmaking technology.
Location
The map below shows the exact location of the plant in Janjgir, Chhattisgarh, India:
- Location: Village – Champa, Distt. Janjgir, Chhattisgarh – 495671
- Coordinates (WGS 84): 22.004694, 82.671666 (exact)
Background
Prakash Industries Ltd was founded in the year 1980.[1] The plant comprises of direct reduced iron kilns and induction furnaces. The company enhanced its steel production capacity to 1250 ttpa in the FY21.[2]
In May 2024, the proposed the expansion of the steel plant with the establishment of new Iron Ore Beneficiation (1.0 MTPA), new Iron Ore Pelletisation Unit (1.5 MTPA), new Coal Gasifier for Pellet Plant (5 x 8000 Nm3/hr), new Coal Washery (2 x 1.0 MTPA), new Wire Rod /TMT Mill (4 x 0.25 MTPA), new Coal Gasifier for Wire Rod / TMT Mill (5 x 8000 Nm3/hr.) and the expansion of FBC-based Power Plant (162.5 MW to 165 MW) and oxygen plant (8.0 TPD to 16 TPD).[3] In November 2024, Prakash Industries Limited received the mining lease for Bhaskarpara commercial coal mine located in Chhattisgarh’s Surajpur district, production at which is expected to begin operations in 2025.[4]
Plant Details
Table 1: General Plant Details
Announced date | Start date | Workforce size | Power source |
---|---|---|---|
1991-11[5] | 1993[6] | 2404[7] | Captive power plant[7] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Prakash Industries Ltd | 4295873868 | E100000121137 | Prakash Industries Ltd[8] | 4295873868 | E100000121137 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment |
---|---|---|---|---|
crude, semi-finished[9] | bloom, billet, DRI[9] | yes[7] | yes[7] | DRI; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 1190[10][11][12] | 1190[10][11][12] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|
operating | 1200[12][13][14][15][16] | 1200[12][13][14][15][16] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel | Sinter |
---|---|
>0[12] | 1650[17] |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | Other/unknown steel production |
---|---|
2020 | unknown |
2021 | unknown |
2022 | unknown |
2023 | unknown |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | DRI production | Total (all routes) |
---|---|---|
2019 | 816[14] | 816[14] |
2020 | 906[14] | 906[14] |
2021 | unknown | – |
2022 | unknown | – |
2023 | unknown | – |
Unit Details
Table 9: Direct Reduced Iron Furnace Details
Unit name | Status | Start date | Furnace manufacturer and model | Furnace type | Current capacity (ttpa) | Reductant |
---|---|---|---|---|---|---|
DRI 1 | operating[18][19] | 1993[20][10] | Lurgi HmbH, Germany SL/RN Technology[21][22][8][22] | rotary kiln | 200[15][12][14][16] | coal[23] |
DRI 2 | operating[18][19] | 1996[20][10] | Lurgi HmbH, Germany SL/RN Technology[21][22][8][22] | rotary kiln | 200[15][12][14][16] | coal[23] |
DRI 3 | operating[18][19] | 2009[20][10] | Lurgi HmbH, Germany SL/RN Technology[8][8] | rotary kiln[8] | 200[15][12][14][16] | coal[23] |
DRI 4 | operating[18][19] | 2012[20][10] | Lurgi HmbH, Germany SL/RN Technology[8][8] | rotary kiln[8] | 200[15][12][14][16] | coal[23] |
DRI 5 | operating[18][19] | 2017[20][10] | Lurgi HmbH, Germany SL/RN Technology[8][8] | rotary kiln[8] | 200[15][12][14][16] | coal[23] |
DRI 6 | operating[13] | 2019[24][10] | Lurgi HmbH, Germany SL/RN Technology[8][8] | rotary kiln[13] | 200[13] | coal[23] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Home". Prakash Industries Ltd. Retrieved 05 January, 2024.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "Investor Presentation" (PDF). Prakash Industries. July 2021. Retrieved 05 January, 2024.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "Proposed expansion of steel plant" (PDF). www.prakash.com. 2024-05-08. Retrieved 2025-01-22.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Editor (2024-11-24). "Prakash Industries to start production in Chhattisgarh coal mine from new year". News Riveting. Retrieved 2025-01-22.
{{cite web}}
:|last=
has generic name (help) - ↑ https://web.archive.org/web/20240111015715/https://www.indiainfoline.com/company/prakash-industries-ltd/summary/444. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.prakash.com/pdfs/Environment_Statement_2021-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 (PDF) https://web.archive.org/web/20220926135521/https://prakash.com/pdfs/Annual_Report_2021-22.pdf. Archived from the original (PDF) on 2022-09-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 https://web.archive.org/web/20240125055010/https://prakash.com/prakash-at-a-glance/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20220120103747/https://prakash.com/steel-blooms-billets/. Archived from the original on 2022-01-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 (PDF) https://www.prakash.com/pdfs/Six_Monthly_Compliance_Report_Champa.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://web.archive.org/web/20240125030932/https://energie.gov.ro/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 12.9 (PDF) https://web.archive.org/web/20220125154901/https://prakash.com/pdfs/Annual_Report_2020-21.pdf. Archived from the original (PDF) on 2022-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 13.4 (PDF) https://web.archive.org/web/20240627014113/https://www.bseindia.com/xml-data/corpfiling/CorpAttachment/2019/1/85d5ae22-b4e1-4d73-becf-39d5fb9a952c.pdf. Archived from the original (PDF) on 2024-06-27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.00 14.01 14.02 14.03 14.04 14.05 14.06 14.07 14.08 14.09 14.10 (PDF) https://web.archive.org/web/20240111052756/https://prakash.com/pdfs/Corporate_Presentation_FY21.pdf. Archived from the original (PDF) on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 15.3 15.4 15.5 15.6 "2021 World Direct Reduction Statistics" (PDF). Midrex. 2022-09-01. Archived from the original (PDF) on 2022-10-08.
- ↑ 16.0 16.1 16.2 16.3 16.4 16.5 16.6 "2019 World Direct Reduction Statistics" (PDF). Midrex. 2020-09-04. Archived from the original (PDF) on 2021-10-23.
- ↑ (PDF) https://web.archive.org/web/20240111025445/https://environmentclearance.nic.in/writereaddata/Online/TOR/23_Feb_2018_175153967MGYKUFC8Briefnote.pdf. Archived from the original (PDF) on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 18.3 18.4 (PDF) https://web.archive.org/web/20240130192900/https://prakash.com/pdfs/PIL_Annual_Report_2022-23.pdf. Archived from the original (PDF) on 2024-01-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 "2022 World Direct Reduction Statistics" (PDF). Midrex. 2023-09-12. Archived from the original (PDF) on 2023-11-03.
- ↑ 20.0 20.1 20.2 20.3 20.4 (PDF) https://web.archive.org/web/20240111091031/https://www.prakash.com/pdfs/Environment_Statement_2021-2022.pdf. Archived from the original (PDF) on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 https://web.archive.org/web/20240111091151/https://in.investing.com/analysis/prakash-industries--a-fully-integrated-steel-plant-of-india-200196456. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 22.0 22.1 22.2 22.3 https://web.archive.org/web/20240111091340/https://www.scribd.com/document/5517996/Prakash-Industries-Ltd. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 23.0 23.1 23.2 23.3 23.4 23.5 https://web.archive.org/web/20240905162757/https://prakash.com/portfolio/sponge-iron/. Archived from the original on 2024-09-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://prakash.com/pdfs/INVESTOR_PRESENTATION_MAY_2019.pdf.
{{cite web}}
: Missing or empty|title=
(help)