Prakash Industries Janjgir steel plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Prakash Industries steel plant, also known as PIL, is a direct reduced iron (DRI) steel plant operating in Janjgir, Chhattisgarh, India.

Location

The map below shows the exact location of the plant in Janjgir, Chhattisgarh, India:

Loading map...
  • Location: Village – Champa, Distt. Janjgir, Chhattisgarh – 495671
  • Coordinates (WGS 84): 22.004694, 82.671666 (exact)

Background

Prakash Industries Ltd was founded in the year 1980.[1] The plant comprises of direct reduced iron kilns and induction furnaces. The company enhanced its steel production capacity to 1250 ttpa in the FY21.[2]

In May 2024, the proposed the expansion of the steel plant with the establishment of new Iron Ore Beneficiation (1.0 MTPA), new Iron Ore Pelletisation Unit (1.5 MTPA), new Coal Gasifier for Pellet Plant (5 x 8000 Nm3/hr), new Coal Washery (2 x 1.0 MTPA), new Wire Rod /TMT Mill (4 x 0.25 MTPA), new Coal Gasifier for Wire Rod / TMT Mill (5 x 8000 Nm3/hr.) and the expansion of FBC-based Power Plant (162.5 MW to 165 MW) and oxygen plant (8.0 TPD to 16 TPD).[3] In November 2024, Prakash Industries Limited received the mining lease for Bhaskarpara commercial coal mine located in Chhattisgarh’s Surajpur district, production at which is expected to begin operations in 2025.[4]

Plant Details

Table 1: General Plant Details

Plant status Announced date Start date Workforce size Power source
Operating[5] 1991-11[6] 1993[7] 2404[8] Captive power plant[8]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Prakash Industries Ltd [100%] 4295873868 [100%] E100000121137 Prakash Industries Ltd[9] 4295873868 E100000121137

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Main production equipment Detailed production equipment
crude; semi-finished[10] DRI; blooms; billets; ferro alloys[10] yes[8] yes[8] DRI, other[5] 6 DRI; IF[5][11][12]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Nominal crude steel capacity (total)
operating 1250 TTPA

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Sponge iron/DRI capacity Nominal iron capacity (total)
operating 1200 TTPA[5][11][13][14][5][11][13][14][5][11][13][14][5][11][13][14][5][11][13][14][12] 1200 TTPA[5][11][13][14][5][11][13][14][5][11][13][14][5][11][13][14][5][11][13][14][12]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter
>0 TTPA[5] 1650 TTPA[15]

Table 7: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year DRI Production Total (all routes)
2020 906 TTPA[14] 906 TTPA
2021
2022

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "Home". Prakash Industries Ltd. Retrieved 05 January, 2024. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. "Investor Presentation" (PDF). Prakash Industries. July 2021. Retrieved 05 January, 2024. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  3. "Proposed expansion of steel plant" (PDF). www.prakash.com. 2024-05-08. Retrieved 2025-01-22.{{cite web}}: CS1 maint: url-status (link)
  4. Editor (2024-11-24). "Prakash Industries to start production in Chhattisgarh coal mine from new year". News Riveting. Retrieved 2025-01-22. {{cite web}}: |last= has generic name (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 (PDF) https://web.archive.org/web/20220125154901/https://prakash.com/pdfs/Annual_Report_2020-21.pdf. Archived from the original (PDF) on 25 January 2022. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20240111015715/https://www.indiainfoline.com/company/prakash-industries-ltd/summary/444. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. https://www.prakash.com/pdfs/Environment_Statement_2021-20. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 (PDF) https://web.archive.org/web/20220926135521/https://prakash.com/pdfs/Annual_Report_2021-22.pdf. Archived from the original (PDF) on 26 September 2022. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20240125055010/https://prakash.com/prakash-at-a-glance/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://web.archive.org/web/20220120103747/https://prakash.com/steel-blooms-billets/. Archived from the original on 20 January 2022. {{cite web}}: Missing or empty |title= (help)
  11. 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 (PDF) https://web.archive.org/web/20211023101450/https://www.midrex.com/wp-content/uploads/Midrex-STATSbook2019Final.pdf. Archived from the original (PDF) on 23 October 2021. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 (PDF) https://www.bseindia.com/xml-data/corpfiling/CorpAttachment/2019/1/85d5ae22-b4e1-4d73-becf-39d5fb9a952c.pdf. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8 13.9 (PDF) https://web.archive.org/web/20221008040524/https://www.midrex.com/wp-content/uploads/MidrexSTATSBook2021.pdf. Archived from the original (PDF) on 08 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  14. 14.00 14.01 14.02 14.03 14.04 14.05 14.06 14.07 14.08 14.09 14.10 (PDF) https://web.archive.org/web/20240111052756/https://prakash.com/pdfs/Corporate_Presentation_FY21.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  15. (PDF) https://web.archive.org/web/20240111025445/https://environmentclearance.nic.in/writereaddata/Online/TOR/23_Feb_2018_175153967MGYKUFC8Briefnote.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)

Resources