Prakash Industries steel plant
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Prakash Industries steel plant, also known as PIL, is a direct reduced iron (DRI) steel plant operating in Janjgir, Chhattisgarh, India.
Location
The map below shows the exact location of the plant in Janjgir, Chhattisgarh, India:
- Location: Village – Champa, Distt. Janjgir, Chhattisgarh – 495671
- Coordinates (WGS 84): 22.004694, 82.671666 (exact)
Background
Prakash Industries Ltd was founded in the year 1980.[1] The company enhanced its steel production capacity to 1250 ttpa in the FY21.[2]
Plant Details
Table 1: General Plant Details
Plant status | Announced date | Start date | Workforce size | Power source |
---|---|---|---|---|
Operating[3] | 1991-11[4] | 1993[5] | 2404[6] | Captive power plant[6] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Prakash Industries Ltd [100%] | 4295873868 [100%] | E100000121137 | Prakash Industries Ltd[7] | 4295873868 | E100000121137 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
crude; semi-finished[8] | DRI; blooms; billets; ferro alloys[8] | yes[6] | yes[6] | DRI, other[3] | 6 DRI; IF[3][9][10] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Nominal crude steel capacity (total) |
---|---|
operating | 1250 TTPA |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|
operating | 1200 TTPA[3][9][11][12][3][9][11][12][3][9][11][12][3][9][11][12][3][9][11][12][10] | 1200 TTPA[3][9][11][12][3][9][11][12][3][9][11][12][3][9][11][12][3][9][11][12][10] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel | Sinter |
---|---|
>0 TTPA[3] | 1650 TTPA[13] |
Table 7: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | DRI Production | Total (all routes) |
---|---|---|
2020 | 906 TTPA[12] | 906 TTPA |
2021 | – | – |
2022 | – | – |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "Home". Prakash Industries Ltd. Retrieved 05 January, 2024.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "Investor Presentation" (PDF). Prakash Industries. July 2021. Retrieved 05 January, 2024.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 (PDF) https://web.archive.org/web/20220125154901/https://prakash.com/pdfs/Annual_Report_2020-21.pdf. Archived from the original (PDF) on 25 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240111015715/https://www.indiainfoline.com/company/prakash-industries-ltd/summary/444. Archived from the original on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.prakash.com/pdfs/Environment_Statement_2021-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 (PDF) https://web.archive.org/web/20220926135521/https://prakash.com/pdfs/Annual_Report_2021-22.pdf. Archived from the original (PDF) on 26 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125055010/https://prakash.com/prakash-at-a-glance/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20220120103747/https://prakash.com/steel-blooms-billets/. Archived from the original on 20 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 (PDF) https://web.archive.org/web/20211023101450/https://www.midrex.com/wp-content/uploads/Midrex-STATSbook2019Final.pdf. Archived from the original (PDF) on 23 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 (PDF) https://www.bseindia.com/xml-data/corpfiling/CorpAttachment/2019/1/85d5ae22-b4e1-4d73-becf-39d5fb9a952c.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9 (PDF) https://web.archive.org/web/20221008040524/https://www.midrex.com/wp-content/uploads/MidrexSTATSBook2021.pdf. Archived from the original (PDF) on 08 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 (PDF) https://web.archive.org/web/20240111052756/https://prakash.com/pdfs/Corporate_Presentation_FY21.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240111025445/https://environmentclearance.nic.in/writereaddata/Online/TOR/23_Feb_2018_175153967MGYKUFC8Briefnote.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help)