Raigarh TRN Power Project is an operating power station of at least 600-megawatts (MW) in Nawapara, Raigarh, Chhattisgarh, India. It is also known as Nawapara.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Raigarh TRN Power Project | Nawapara, Raigarh, Raigarh, Chhattisgarh, India | 21.906738, 83.128556 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 21.906738, 83.128556
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | operating | coal: unknown | 300 | subcritical | 2016 |
Unit 2 | operating | coal: unknown | 300 | subcritical | 2017 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | TRN Energy Pvt Ltd [100%] | ACB (India) Ltd [74.0%] |
Unit 2 | TRN Energy Pvt Ltd [100%] | ACB (India) Ltd [74.0%] |
Project-level coal details
- Coal source(s): South Eastern Coalfields Ltd
Background
The project is sponsored by ACB (India) Ltd. On its website, in 2011, the company stated that the first 300MW unit would be commissioned is September 2013 and the second unit in December 2013. The proposed power station would be located at Nawapara Village in the Raigarh district, Chhattisgarh in India.[1]
The project has received environmental clearance and has made an agreement with South Eastern Coalfields Ltd for coal. In November 2011, the engineering, procurement, and construction (EPC) contract was awarded to BGR Energy Systems.[2]
A 2013 ACB (India) report lists the plant as under construction and planned for commissioning in FY 2014-5. The report states 390 MW will be sold to PTC India through a long term PPA. About 5% of the power will be sold to Chhattisgarh state power utility.[3]
The company's website states that the proposed commissioning date of the first unit is March 2015 and the second unit September 2015,[4] later moved to December 2015 and June 2016,[5] then February 2016 and September 2016,[6] then July 2016 and January 2017.[7]
Unit 1 was commissioned in August 2016[8] and unit 2 in April 2017.[9]
Financing
In March 2014, a re-financing agreement for the project was closed. US$377.65 million in loans was provided by Axis Bank, Bank of Baroda, Bank of Maharashtra, Central Bank of India, Indian Overseas Bank, and Rural Electrification Corporation. US$94.57 million in equity was provided by ACB (India) Ltd and Jain Group.[10] The details of the previous financing are not known.
Articles and Resources
References
- ↑ ACB India, "600 MW Power Plant, Raigarh, Chhattisgarh", ACB (India) website, accessed November 2011.
- ↑ "BGR to construct Nawapara plant," Project Monitor, November 11, 2011
- ↑ Investment report, ACB (India) Limited, Jan 30, 2013
- ↑ ACB India, "600 MW Power Plant, Raigarh, Chhattisgarh", ACB (India) website, accessed March 2015
- ↑ ACB India, "600 MW Power Plant, Raigarh, Chhattisgarh", ACB (India) website, accessed Sep 2016
- ↑ "Monthly Report on Broad Status of Thermal Power Projects in the Country," Government of India Ministry of Power, November 2015
- ↑ "Monthly Report on Broad Status of Thermal Power Projects in the Country," Government of India Ministry of Power, March 2016
- ↑ "Monthly Report on Broad Status of Thermal Power Projects in the Country," Government of India Ministry of Power, July 2016
- ↑ "Monthly Report on Broad Status of Thermal Power Projects in the Country," Government of India Ministry of Power, November 2016
- ↑ "Preview of Nawapara Thermal Power Plant Refinancing 2014 (600MW) | Transaction | IJGlobal". ijglobal.com. Retrieved 2020-10-23.
Additional data