Rashmi Green Hydrogen Steel Kharagpur steel plant is a steel plant in Kharagpur, Khatranga, West Medinipur, West Bengal, India that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.
Location
The map below shows the exact location of the plant in Kharagpur, Khatranga, West Medinipur, West Bengal, India:
- Location:
- Coordinates (WGS 84): 22.331489, 87.398085 (exact)
Background
Rashmi Green Hydrogen & Steel Private Limited, a Private Limited company, announced its plan to set up a green field Project for Integrated Steel Plant -3.1 million tonnes per annum (mtpa) along with 230 MW ( 80 MW WHRB/ TRT based + 150 MW Coal based) Captive Power Plant at Kharagpur, West Bengal, India. The proposed plant comprises of blast furnaces, basic oxygen furnaces, sinter plants, pellet plant and non-recovery type coke oven plant.[1] The project is in the construction phase and the seamless tube/pipe plant and coal gasifier plant are in operation.[2] Complete project implementation of the project is expected to be completed by 2030.[1]
Plant Details
Table 1: General Plant Details
Announced date | Construction date | Workforce size | Power source | Iron ore source | Coal source |
---|---|---|---|---|---|
2022[3] | 2023[4] | 3000[3] | 230 MW CPP (80 MW WHRB; 150 MW CFBC); 49 MW from grid (WBSEDCL)[3] | Barbil-Joda, Odisha[3] | BCCL, Dhanbad[3] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Rashmi Green Hydrogen Steel Pvt Ltd | 5086734197 | E100002005355 | Rashmi Green Hydrogen Steel Pvt Ltd[3] | 5086734197 | E100002005355 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | Main production equipment |
---|---|---|---|
finished rolled[3] | ferro alloys, tube, pipe, strip, di pipe[3] | building and infrastructure[3] | BF; BOF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
announced | 2600[3] | 2600[3] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
announced | 2000[3] | 2000[3] |
construction | 1000[3] | 1000[3] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter | Coke | Pellets |
---|---|---|
4000[3] | 1000[3] | 1200[3] |
Unit Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Start date | Current size | Current capacity (ttpa) |
---|---|---|---|---|---|
BF 1 | construction[4] | 2022[3] | – | 686.0[3] | 1000[3] |
BF 2 | announced[3] | 2022[3] | – | 686.0[3] | 1000[3] |
BF 3 | announced[3] | 2022[3] | 2030[3] | 686.0[3] | 1000[3] |
Table 8: Basic Oxygen Furnace Details
Unit name | Status | Announced date | Start date | Current capacity (ttpa) | Current size |
---|---|---|---|---|---|
unknown BOF (1) | announced[3] | 2022[3] | – | 1444[3] | 125.0 tonnes[3] |
unknown BOF (2) | announced[3] | 2022[3] | 2030[3] | 1156[3] | 100.0 tonnes[3] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "Pre-feasibility report" (PDF). environmentclearance.nic.in. 2022-03. Retrieved 2025-01-22.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link) - ↑ "Six monthly status compliance report" (PDF). www.rashmiseamless.com. 2024-05-24. Retrieved 2025-01-22.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 3.28 3.29 3.30 3.31 3.32 3.33 3.34 3.35 3.36 3.37 3.38 (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/02_Apr_2022_10592301787414524PFRFinal.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 (PDF) https://www.rashmiseamless.com/wp-content/uploads/2024/05/EC_compliance-RGHSPL-_JUNE-2024_organized.pdf.
{{cite web}}
: Missing or empty|title=
(help)