Rashmi Metaliks Kharagpur steel plant
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Rashmi Metaliks Kharagpur steel plant, also known as RML Kharagpur, is a blast furnace (BF) and direct reduced iron (DRI) steel plant operating in Kharagpur, West Bengal, India.
Location
The map below shows the exact location of the plant in Kharagpur, West Bengal, India:
- Location: Village Gokulpur, P.O. Shyamraipur, P.S. Kharagpur (Local), District West Medinipur, West Bengal, India
- Coordinates (WGS 84): 22.360664, 87.295932 (exact)
Background
The Rashmi Group decided to build the new capacity in Jamuria, Burdwan (West Bengal) and was anticipated to be completed in 2021.[1] However, no recent updates on the progress of construction have been published.
Plant Details
Table 1: General Plant Details
Plant status | Start date | Power source |
---|---|---|
Operating[2] | 2004[2] | One captive power plant (25 MW)[3] |
Table 2: Ownership and Parent Company Information
Owner | Owner company PermID | Owner company GEM ID |
---|---|---|
Rashmi Metaliks Ltd[2] | 4298375168 | E100000130890 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|
crude; semi-finished; finished rolled[2] | DRI; pig iron; billets; TMT bars; DI pipes; wire rod[2] | yes[2] | BF, DRI, other[2] | BF (215 m3); 7 IF (2x8ton; 2x20ton; 3x20ton)[2][4] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Nominal crude steel capacity (total) |
---|---|
operating | 500 TTPA |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
operating | 200 TTPA[2][5] | 200 TTPA[2][5] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel | Sinter | Pellets |
---|---|---|
>0 TTPA[2] | 600 TTPA[4] | 2100 TTPA[2] |
Blast Furnace Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|
unknown | operating[2][5] | unknown | unknown | 2007[3] | 215 m³[6] | 200[2][5] | unknown | unknown[7] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "About Us". Rashmi Group. Retrieved 2022-03-04.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 https://web.archive.org/web/20240125061050/https://www.rashmigroup.com/rashmi-metaliks-ltd/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20220112195421/http://rml.careersitemanager.com/about-us/. Archived from the original on 12 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 (PDF) https://web.archive.org/web/20240111025221/https://environmentclearance.nic.in/writereaddata/modification/Amendment/Attach_file/22122016EO1FVWY5PFR.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 http://rml.careersitemanager.com/about-us/#:~:text=Rashmi%20Metaliks%20Ltd.%2C%20the%20flagshipat%20Kharagpur%20in%20West%20Bengal.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) http://environmentclearance.nic.in/writereaddata/modification/Amendment/Attach_file/22122016EO1FVWY5PFR.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.wbpcb.gov.in/writereaddata/files/Executive%20Summary_RML.pdf.
{{cite web}}
: Missing or empty|title=
(help)