Rosa Thermal Power Plant is an operating power station of at least 1200-megawatts (MW) in Rosa, Shahjahanpur, Uttar Pradesh, India with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Rosa Thermal Power Plant Rosa, Shahjahanpur, Shahjahanpur, Uttar Pradesh, India 27.8194455, 79.9371618 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4, Unit 5, Unit 6: 27.8194455, 79.9371618

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 operating coal: bituminous 300 subcritical 2009
Unit 2 operating coal: bituminous 300 subcritical 2010
Unit 3 operating coal: bituminous 300 subcritical 2011
Unit 4 operating coal: bituminous 300 subcritical 2012
Unit 5 cancelled coal: bituminous 660 unknown
Unit 6 cancelled coal: bituminous 660 unknown

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Reliance Power Ltd [100%] Reliance Power Ltd [100.0%]
Unit 2 Reliance Power Ltd [100%] Reliance Power Ltd [100.0%]
Unit 3 Reliance Power Ltd [100%] Reliance Power Ltd [100.0%]
Unit 4 Reliance Power Ltd [100%] Reliance Power Ltd [100.0%]
Unit 5 Reliance Power Ltd [100%] Reliance Power Ltd [100.0%]
Unit 6 Reliance Power Ltd [100%] Reliance Power Ltd [100.0%]

Financing

Source of financing:

Background

Phase I, Units 1-2

Construction of the project commenced in June 2007.[1] Phase I was completed in December 2009 and entered commercial operation in March 2010.[2][1]

Owner Reliance Power states that "the entire power generated will be sold" to Uttar Pradesh Power Corporation Limited (UPPCL) and that "coal for the project would be supplied from the Ashoka Coal mines of Central Coalfields Limited (CCL) a subsidiary of Coal India Limited (CIL). The coal mines are located in Jharkhand and the coal will be transported by Railways over a distance of 870 kms." Water for the plant "is sourced from Garrah river located a kilometer from the project."[1]

Phase II, Units 3-4

Rosa Phase II Unit 3 (300 MW) was commissioned in December 2011.[3] Unit 4 (300 MW) of the plant was commissioned on March 28, 2012.[4][5][6][7]

The company states that half the output of Rosa Stage II will be sold to Uttar Pradesh Power Corporation Limited (UPPCL) at a cost plus tariff with the balance to be sold through Reliance Energy Trading Limited. Reliance Power states that the project is scheduled to be completed in 2012.[8]

Coal will be supplied from the Ashoka Coal mines of Central Coalfields Limited (CCL), a subsidiary of Coal India Limited (CIL). The coal mines are located in Jharkhand and the coal will be transported by Railways over a distance of 870 kms. Water for the power station "will be sourced from Garrah river located a kilometer from the project."[8][9]

Phase III, Units 5-6

The company submitted an application for a units 5 and 6 in December 2013.[10]

As of May 2016 the proposed units have yet to receive any necessary permits, and plans appear to be deferred or abandoned. It is not mentioned on the company website or in the Ministry of Power's Broad Status Report.[11]

Articles and Resources

References

  1. 1.0 1.1 1.2 Reliance Power, "Rosa Phase I", Reliance Power website, accessed May 2011.
  2. "Phase I of Rosa plant goes onstream" The Economic Times, December 29, 2011.
  3. "Monthly Report on Broad Status of Thermal Power Projects in the Country" Government of India Ministry of Power, February 2012.
  4. "Monthly Report on Broad Status of Thermal Power Projects in the Country" Government of India Ministry of Power, February 2012.
  5. "Phase II of Rosa power plant switched on" The Times of India, June 18, 2010.
  6. Reliance Power, "Coal Based Projects", Reliance Power website, accessed December 2011.
  7. ALL INDIA REGIONWISE GENERATING INSTALLED CAPACITY (MW) OF POWER UTILITIES INCLUDING ALLOCATED SHARES IN JOINT AND CENTRAL SECTOR UTILITIES, Central Electricity Authority, May 31, 2012
  8. 8.0 8.1 Reliance Power, "Rosa Phase II", Reliance Power website, accessed May 2011.
  9. "Monthly Report on Broad Status of Thermal Power Projects in the Country" Government of India Ministry of Power, February 2012.
  10. Terms of Reference application for units 5 & 6, India MoEF, December 2, 2013
  11. "Monthly Report on Broad Status of Thermal Power Projects in the Country," Government of India Ministry of Power, July 2016