Rungta Mines Chaliyama steel plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Rungta Mines Chaliyama steel plant is a steel plant in Chaliyama, Saraikela – Kharsawan, Jharkhand, India that operates blast furnace (BF), direct reduced iron (DRI), and steelmaking technology.
Location
The map below shows the exact location of the plant in Chaliyama, Saraikela – Kharsawan, Jharkhand, India:
- Location:
- Coordinates (WGS 84): 22.588359, 85.905724 (exact)
Background
Rungta Mines Chaliyama steel plant has direct reduced iron units and induction furnaces.[1] In 2021, the company received environmental clearance for expansion of the plant to an annual operating capacity of 7 mtpa.[2] Many facilities at the plant are under construction. After expansion the Chaliyama steel plant will be able to produce hot rolled coil, cold rolled coil, annealed & pickled products, sheet, galvanasied coil, colour coated sheets, pipes, tubes, wires and others.[2]
Plant Details
Table 1: General Plant Details
Announced date | Workforce size | Power source | Iron ore source | Coal source |
---|---|---|---|---|
2008[3] | 1830[4] | 1252 MW CPP (proposed)[5][4] | Captive mines in Odisha and Jharkhand[4] | Imported from South Africa[4][6] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Rungta Mines Ltd | 4298502619 | E100000130898 | Rungta Mines Ltd[4] | 4298502619 | E100000130898 |
Table 3: Process and Products
Steel product category | Steel products | Main production equipment |
---|---|---|
semi-finished, finished rolled[4] | flat, round bar, rolled wire rod, billet, slab, bloom[4] | BF; DRI; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
announced | 6327[5] | 6327[5] |
operating | 696[4] | 696[4] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
announced | 4593[5] | 1728[5] | 6321[5] |
operating | – | 618[4] | 618[4] |
Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | Other/unknown steel production |
---|---|
2019 | unknown |
2020 | unknown |
2021 | unknown |
2022 | unknown |
2023 | unknown |
Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | DRI production | Other/unknown iron production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
2023 | unknown | unknown |
Unit Details
Table 8: Blast Furnace Details
Unit name | Status | Announced date | Current size | Current capacity (ttpa) |
---|---|---|---|---|
BF 1 | announced[5] | 2021[5] | 524.0[5] | 697[5] |
BF 2 | announced[5] | 2021[5] | 650.0[5] | 853[5] |
BF 3 | announced[5] | 2021[5] | 650.0[5] | 865[5] |
BF 4 | announced[5] | 2021[5] | 650.0[5] | 865[5] |
unknown BF (1) | announced[5] | 2021[5] | 1250.0[5] | 1313[5] |
Table 9: Direct Reduced Iron Furnace Details
Unit name | Status | Announced date | Furnace type | Current capacity (ttpa) | Reductant |
---|---|---|---|---|---|
DRI 1 | operating[4] | 2008[6] | rotary kiln[4] | 41[4] | coal[4] |
DRI 2 | operating[4] | 2008[6] | rotary kiln[4] | 41[4] | coal[4] |
DRI 3 | operating[4] | 2008[6] | rotary kiln[4] | 41[4] | coal[4] |
DRI 4 | operating[4] | 2008[6] | rotary kiln[4] | 41[4] | coal[4] |
DRI 5 | operating[4] | 2008[6] | rotary kiln[4] | 41[4] | coal[4] |
DRI 6 | operating[4] | 2008[6] | rotary kiln[4] | 41[4] | coal[4] |
DRI 7 | operating[4] | 2008[6] | rotary kiln[4] | 41[4] | coal[4] |
DRI 8 | operating[4] | 2008[6] | rotary kiln[4] | 41[4] | coal[4] |
unknown DRI (1) | operating[4] | 2014[3] | rotary kiln[4] | 145[4] | coal[4] |
unknown DRI (2) | operating[4] | 2014[3] | rotary kiln[4] | 145[4] | coal[4] |
unknown DRI (3) | announced[5] | 2021[5] | rotary kiln[5] | 432[5] | coal[5] |
unknown DRI (4) | announced[5] | 2021[5] | rotary kiln[5] | 432[5] | coal[5] |
unknown DRI (5) | announced[5] | 2021[5] | rotary kiln[5] | 432[5] | coal[5] |
unknown DRI (6) | announced[5] | 2021[5] | rotary kiln[5] | 432[5] | coal[5] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Pre-feasibility report". environmentclearance.nic.in. 2018-09. Retrieved 2025-01-22.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link) - ↑ 2.0 2.1 "Environmental clearance for expansion". environmentclearance.nic.in. 2021-07-13. Retrieved 2025-01-22.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 (PDF) https://environmentclearance.nic.in/writereaddata/Public%20Hearing/Folder7/5111212812121305-2012.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 4.26 4.27 4.28 4.29 4.30 4.31 4.32 4.33 4.34 4.35 4.36 4.37 4.38 4.39 4.40 4.41 4.42 4.43 4.44 4.45 4.46 4.47 4.48 4.49 4.50 https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=Ob3A4mCrGRPOgxDkaT3fuHd1r+HdT0FUMIKIsKmiI1zYLWjkGlRjvnA976RUPUCqOgKPrcSC9WeOqxg+CZDuFLa7w+37xQn18mzZo4aWcEE=&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzWF1OLE6RXe5MiAhSH8vdQ1.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 5.22 5.23 5.24 5.25 5.26 5.27 5.28 5.29 5.30 5.31 5.32 5.33 5.34 5.35 5.36 5.37 5.38 5.39 5.40 5.41 5.42 5.43 5.44 5.45 https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=dr2XVktGHxuhAXJwNOiiFVDWLrf4OMH9Wrg0jtbM2bc0SaF6vJBqdWn69NNO/j9PpI4GRvjogAEBeJxeEP5hNj6nEPNgQ5RugjbjXv4kuZx9T6J57CfRbcaDKqJDmOGH&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016_1536098579OTYH2ZDAnnexure-Briefsummaryofproject.pdf.
{{cite web}}
: Missing or empty|title=
(help)