Rungta Mines Karakhendra Steel Plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Rungta Mines Karakhendra Steel Plant, also known as Karakhendra Steel Plant, is a steel plant in Karakhendra, Barbil, Keonjhar, Odisha, India that operates blast furnace (BF), direct reduced iron (DRI), steelmaking, and electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Karakhendra, Barbil, Keonjhar, Odisha, India:
- Location: Karakhendra, Main Road, Barbil, Kendujhar- 758035, Odisha, India
- Coordinates (WGS 84): 22.140174, 85.414616 (exact)
Background
Rungta Mines Limited is setting up a steel plant at Karakhendra village. The proposal received environment clearance in August 2019. The company also announced to further expanding the capacity from 126 ttpa to 681 ttpa.[1] The project is estimated to be completed in 45 months.[2] The plant is expected to be built on a combination of forest and non-forest land.[3] The expansion is expected to be completed by 2025.[4]
Plant Details
Table 1: General Plant Details
Announced date | Construction date | Start date | Workforce size | Power source | Iron ore source | Coal source |
---|---|---|---|---|---|---|
2016[5] | 2018[6] | 2025[7] | 1260[8] | 90 MW Captive power plant ([9] | unknown | unknown |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Rungta Mines Ltd | 4298502619 | E100000130898 | Rungta Mines Ltd[10] | 4298502619 | E100000130898 |
Table 3: Process and Products
Steel product category | Steel products | Main production equipment |
---|---|---|
semi-finished, finished rolled[9] | flat, round bar, rolled wire rod, billet, bloom, slab[9] | BF; DRI; EAF; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
announced | 554[9] | – | 554[9] |
construction | – | 126[9] | 126[9] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
announced | 372[9] | 273[9] | 645[9] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter | Coke | Pellets |
---|---|---|
554[9] | 280[9] | 1474[9] |
Unit Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology |
---|---|---|---|---|---|---|
unknown BF (1) | announced[9] | 2017[5] | 2025[7] | 380.0[9] | 372[9] | unknown |
Table 8: Direct Reduced Iron Furnace Details
Unit name | Status | Announced date | Start date | Furnace type | Current capacity (ttpa) | Reductant |
---|---|---|---|---|---|---|
unknown DRI (1) | announced[9] | 2017[5] | 2025[7] | not found | 273[9] | coal[9] |
Table 9: Electric Arc Furnace Details
Unit name | Status | Announced date | Start date | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|---|
unknown EAF (1) | announced[9] | 2017[5] | 2025[7] | 554[9] | 70.0[9] |
Table 10: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated | % other iron |
---|---|---|---|---|---|---|---|---|---|
unknown EAF (1) | None | unknown | unknown | unknown | unknown | unknown | unknown | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs named:0
- ↑ "Expansion of Karakhendra Steel Plant in Odisha". 23 February, 2021. Retrieved 10 January 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Justification for locating the project in forest area". Forests Clearance. Retrieved 10 Janaury 2024.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ ProjectX (2021-02-22). "Expansion of Karakhendra Steel Plant in Odisha". ProjectX India. Retrieved 2025-01-23.
- ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20240115055457/https://odisha.industry-focus.net/2017/11/24/impo-192/. Archived from the original on 2024-01-15.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://environmentclearance.nic.in/writereaddata/online/EC/29032019PY5OD5MIAddendumEMP.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 https://web.archive.org/web/20241007160208/https://projectxindia.com/2021/02/23/expansion-of-karakhendra-steel-plant-in-odisha/. Archived from the original on 2024-10-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240115062012/https://forestsclearance.nic.in/DownloadPdfFile.aspx?FileName=611812201219FYW2XKarakhendraJustificationsigned.pdf&FilePath=..%252Fwritereaddata%252FFormA%252FJustification%252F. Archived from the original on 2024-01-15.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 9.12 9.13 9.14 9.15 9.16 9.17 9.18 9.19 9.20 9.21 (PDF) https://web.archive.org/web/20240115051302/https://environmentclearance.nic.in/writereaddata/Online/TOR/14_Nov_2019_125501913B7P6P4P3Annexure-Coveringletter.pdf. Archived from the original (PDF) on 2024-01-15.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220111145838/https://www.therungtagroup.com/. Archived from the original on 2022-01-11.
{{cite web}}
: Missing or empty|title=
(help)