Se.ven GI Cardiff plant
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Se.ven GI Cardiff plant, also known as Celsa Steel UK melt-shop, Celsa Steel UK Cardiff plant, Celsa Steel Castle Works, is a steel plant in Cardiff, Wales, United Kingdom that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Cardiff, Wales, United Kingdom:
- Location: Building 58, Castle Works, East Moors Road, Cardiff, CF24 5NN, United Kingdom
- Coordinates (WGS 84): 51.479757, -3.137056 (exact)
Background
The melt shop of Celsa Steel UK began in 2006. Other parts of the facility including the hot rolling mill started earlier.[1]
Plant Details
Table 1: General Plant Details
Start date | Workforce size |
---|---|
2006[2] | 800[3] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Engiana Establishment | 5085507969 | E100001016427 | Sev.en Global Investments AS[4] | 5083296255 | E100001010410 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment |
---|---|---|---|---|
semi-finished, finished rolled[2] | wire rod, rebar, sections, bar, billet[2] | building and infrastructure, tools and machinery, transport[5] | 2023[6] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 1200[7] | 1200[7] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production | Total (all routes) |
---|---|---|---|
2019 | unknown | unknown | – |
2020 | unknown | unknown | – |
2021 | 1000[8] | –[8] | 1000[8] |
2022 | unknown | unknown | – |
2023 | unknown | unknown | – |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Current capacity (ttpa) |
---|---|---|
unknown EAF (1) | operating[3] | 1200[7] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | yes[9] | 100.00[10][6] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ About Us, Celsa Steel UK, Retrieved on: Jul. 31, 2020
- ↑ 2.0 2.1 2.2 https://web.archive.org/web/20220106064644/http://celsauk.com/Company.mvc/CelsaSteelUK. Archived from the original on 2022-01-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20240110022208/https://www.celsauk.com/wp-content/uploads/2023/07/9432-CELSA-Steel-Sustainability-Report-2023_AW_Print.pdf. Archived from the original (PDF) on 2024-01-10.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.celsagroup.com/en/news-posts/celsa-group-approves-a-capital-increase-to-drive-efficiency-and-strategic-growth/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220318115551/http://www.celsauk.com/Pdf/Celsa%20UK-Local%20Focus-GlobalCommitment.pdf. Archived from the original (PDF) on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20240110022451/https://www.celsauk.com/resources/. Archived from the original on 2024-01-10.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 https://web.archive.org/web/20220709194630/https://www.celsauk.com/. Archived from the original on 2022-07-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 "CELSA Group recovers pre-pandemic production with more than 6.5 Mt of steel produced in its European steel mills". CELSA Group. 2022-02-25. Archived from the original on 2022-07-07.
- ↑ (PDF). 2021-12-31 https://web.archive.org/web/20240119094459/https://www.celsagroup.com/wp-content/uploads/2023/07/sustainability-report-2021.pdf. Archived from the original (PDF) on 2024-01-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240809200559/https://api.environdec.com/api/v1/EPDLibrary/Files/3dfeefb1-9eee-4322-8187-08dbb657dbae/Data. Archived from the original on 2024-08-09.
{{cite web}}
: Missing or empty|title=
(help)