Sev.en GI Mo i Rana steel plant
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Sev.en GI Mo i Rana steel plant, also known as Celsa Nordic Mo i Rana steel plant, Celsa Armeringsstål, is a steel plant in Verkstedløypa, Mo i Rana, Norway that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Verkstedløypa, Mo i Rana, Norway:
- Location: Mo Industrial Park, Verkstedløypa, 8626 Mo i Rana, Norway
- Coordinates (WGS 84): 66.311519, 14.167557 (exact)
Plant Details
Table 1: General Plant Details
Start date | Workforce size | Power source |
---|---|---|
1946[1] | 344[2] | Primarily hydropower[3] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Engiana Establishment | 5085507969 | E100001016427 | Sev.en Global Investments AS[4] | 5083296255 | E100001010410 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment |
---|---|---|---|---|---|
semi-finished, finished rolled[5] | billet, wire rod[6][5] | building and infrastructure, energy, transport[7] | yes[8] | no[9] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 770[1] | 770[1] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production | Total (all routes) |
---|---|---|---|
2019 | unknown | unknown | – |
2020 | unknown | unknown | – |
2021 | 538[10] | –[10] | 538[10] |
2022 | 700[1][11] | –[1][11] | 700[1][11] |
2023 | 683[12] | –[12] | 683[12] |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|---|
unknown EAF (1) | operating[3] | 2007[13] | Tenova Consteel[14][14] | 770[1] | 125.0[8][14] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % other iron |
---|---|---|---|
unknown EAF (1) | yes[9] | 97.00[8][15] | 3.00[15] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://celsanordic.com/facts-figures/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20231202081923/http://www.statkraft.com/newsroom/news-and-stories/2022/green-steel/. Archived from the original on 2023-12-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20220119175222/https://celsanordic.com/. Archived from the original on 2022-01-19. Retrieved 2024-05-22.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.celsagroup.com/en/news-posts/celsa-group-approves-a-capital-increase-to-drive-efficiency-and-strategic-growth/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20230609113434/https://celsanordic.com/products/. Archived from the original on 2023-06-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220205095840/https://celsa-steelservice.no/. Archived from the original on 2022-02-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230320092141/https://celsanordic.com/sectors/. Archived from the original on 2023-03-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 (PDF) https://web.archive.org/web/20231208134500/https://celsanordic.com/wp-content/uploads/2023/10/celsa-nordic-sustainability-report-2022.pdf. Archived from the original (PDF) on 2023-12-08.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 (PDF). 2021-12-31 https://web.archive.org/web/20240119094459/https://www.celsagroup.com/wp-content/uploads/2023/07/sustainability-report-2021.pdf. Archived from the original (PDF) on 2024-01-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 "CELSA Group recovers pre-pandemic production with more than 6.5 Mt of steel produced in its European steel mills". CELSA Group. 2022-02-25. Archived from the original on 2022-07-07.
- ↑ 11.0 11.1 11.2 (PDF) https://www.celsagroup.com/wp-content/uploads/2023/11/celsa-group-nordic-executive-summary-last-version.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 https://eurometal.net/celsa-sells-uk-nordic-steel-subsidiaries-to-czech-investor-sev-en/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://abmproceedings.com.br/ptbr/article/download-pdf/celsa-nordic-in-mo-i-rana-norway-results-of-the-eaf-consteel-start-up.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 https://web.archive.org/web/20240905160420/https://abmproceedings.com.br/en/article/download-pdf/os-recentes-projetos-consteel-e-as-perspectivas-de-carregamento-contnuo-de-sucata-e-gusa-lquido-no-fea-para-a-siderurgia-brasileira. Archived from the original on 2024-09-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 https://web.archive.org/web/20240809200559/https://api.environdec.com/api/v1/EPDLibrary/Files/3dfeefb1-9eee-4322-8187-08dbb657dbae/Data. Archived from the original on 2024-08-09.
{{cite web}}
: Missing or empty|title=
(help)
Resources