Shri Bajrang Power & Ispat Tilda Steel Plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Shri Bajrang Power & Ispat Tilda Steel Plant, also known as SBPIL, is a blast furnace (BF) steel plant operating in Tilda, Chhattisgarh, India.

Location

The map below shows the exact location of the plant in Tilda, Chhattisgarh, India:

Loading map...
  • Location: Shri Bajrang Power and Ispat Ltd. Kh. No. 521/44, Village- Tandwa, Dharsiwa-Tilda Road, Tehsil- Tilda, Raipur (C.G.), 493116
  • Coordinates (WGS 84): 21.486190, 81.771697 (exact)

Background

SBPIL obtained environmental Clearance for setting up an Integrated Steel Plant at Tilda, in October 6th, 2010.[1] The plant began operation in 2013 with a capacity of 500 ttpa.[2] The company later announced their plans to expand the capacity by another 500 ttpa.[1]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Start date Power source
Main plant Operating[3] 2010[4] 2013[5] 100 MW Captive Power Plant[4]
Expansion Announced[4] 2021[6] 25 MW Captive Power Plant[4]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant Banka Finance & Securities Pvt Ltd [15.9%]; Atlanta Securities Pvt Ltd [15.6%]; Pawan Goel [6.3%]; Sukanya Merchandise Pvt Ltd [5.5%]; Bonus Dealcom Pvt Ltd [5.5%] E100001012215 [15.9%]; E100001012216 [15.6%]; E100001012217 [6.3%]; E100001012218 [5.5%]; E100001012219 [5.5%] Shri Bajrang Power & Ispat Limited[3] 4298361778 E100001012214

Table 3: Process and Products

Phase Main production equipment Detailed production equipment
Main plant DRI, unknown[4] 4 DRI[4]
Expansion BF, unknown[4] BF[4]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Nominal crude steel capacity (total)
Main plant operating 500 TTPA[4]
Expansion announced 500 TTPA[4]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
Main plant operating 600 TTPA[4][4][4][4] 600 TTPA[4][4][4][4]
Expansion announced 550 TTPA[4] 550 TTPA[4]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Phase Sinter Coke Pellets
Main plant [4]
Expansion 700 TTPA[4] 500 TTPA[4] 800 TTPA[4]

Blast Furnace Details

Table 7: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current capacity (ttpa) Decarbonization technology Most recent relining
unknown announced[4] 2010[4] unknown unknown 550[4] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "Executive Summary for Expansion of Iron Beneficiation & Pelletization Plant" (PDF). enviscecb. Retrieved 01 March 2024. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. "Shri Bajrang Power & Ispat Limited" (PDF). BSE India. 2018. Retrieved 01 March 2024. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  3. 3.0 3.1 https://web.archive.org/web/20240115050946/https://sbpil.co.in/steel. Archived from the original on 15 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 4.26 (PDF) https://web.archive.org/web/20240115055025/https://enviscecb.org/154/Executive%20Summary_English.pdf. Archived from the original (PDF) on 15 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://www.bseindia.com/downloads/ipo/2018917104439DRHP_Shri%20Bajrang%20Power%20and%20Ispat%20Limited.pdf. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) https://web.archive.org/web/20240309063201/https://www.enviscecb.org/441/English.pdf. Archived from the original (PDF) on 09 March 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Resources