Shyam Steel Mejia Steel Plant is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant operating in Meija, West Bengal, India.
Location
The map below shows the exact location of the plant in Meija, West Bengal, India:
- Location: J.L.No. 11, Jemua Mouza, Mejia Block, Bankura District, West Bengal-722143, India
- Coordinates (WGS 84): 23.564157, 87.089552 (exact)
Background
The Meija plant received environmental clearance in August 2008. The plant is undergoing expansion from396 ttpa to 894 ttpa at an investment of around INR 1,410 crore.[1]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Power source |
---|---|---|---|
Main plant | Operating[2] | 2008[2] | 10 MW WHRB; 7 MW FBC[2] |
Expansion | Announced[2] | 2019[2] | 36 MW WHRB; 18 MW FBC[2] |
Table 2: Ownership and Parent Company Information
Phase | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|
Main plant | Shyam Steel Industries Ltd[2] | 4298177772 | E100000130859 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Main production equipment | Detailed production equipment |
---|---|---|---|---|
Main plant | semi-finished[2] | bars; rods[2] | DRI, other[2] | DRI, IF[2] |
Expansion | semi-finished[2] | bars; rods[2] | DRI, EAF, other[2] | 4 DRI (425 tpd each); 13 IF (3x15 ton; 5x17 ton; 5x15 ton); 1 EAF (30 ton)[2] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | 234 TTPA |
Expansion | announced | 198 TTPA[2] | 659 TTPA[2] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 225 TTPA[2] | 225 TTPA[2] |
Expansion | announced | 561 TTPA[2][2][2][2] | 561 TTPA[2][2][2][2] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Pellets |
---|---|
Main plant | – |
Expansion | 800 TTPA[2] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs named:0
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 (PDF) https://web.archive.org/web/20240111011204/https://environmentclearance.nic.in/writereaddata/Online/TOR/30_May_2021_20145266026391624PFR.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help)