Shyam Steel Mejia Steel Plant
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Shyam Steel Mejia Steel Plant is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant operating in Meija, West Bengal, India.
Location
The map below shows the exact location of the plant in Meija, West Bengal, India:
- Location: J.L.No. 11, Jemua Mouza, Mejia Block, Bankura District, West Bengal-722143, India
- Coordinates (WGS 84): 23.564157, 87.089552 (exact)
Background
The Meija plant received environmental clearance in August 2008. The plant is undergoing expansion from 396 ttpa to 894 ttpa at an investment of around INR 1,410 crore.[1]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Power source |
---|---|---|---|
Main plant | Operating[2] | 2008[2] | 10 MW WHRB; 7 MW FBC[2] |
Expansion | Announced[2] | 2019[2] | 36 MW WHRB; 18 MW FBC[2] |
Table 2: Ownership and Parent Company Information
Phase | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|
Main plant | Shyam Steel Industries Ltd[2] | 4298177772 | E100000130859 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Main production equipment | Detailed production equipment |
---|---|---|---|---|
Main plant | semi-finished[2] | bars; rods[2] | DRI, other[2] | DRI, IF[2] |
Expansion | semi-finished[2] | bars; rods[2] | DRI, EAF, other[2] | 4 DRI (425 tpd each); 13 IF (3x15 ton; 5x17 ton; 5x15 ton); 1 EAF (30 ton)[2] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | 234 TTPA |
Expansion | announced | 198 TTPA[2] | 659 TTPA[2] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 225 TTPA[2] | 225 TTPA[2] |
Expansion | announced | 561 TTPA[2][2][2][2] | 561 TTPA[2][2][2][2] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Pellets |
---|---|
Main plant | – |
Expansion | 800 TTPA[2] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs named:0
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 (PDF) https://web.archive.org/web/20240111011204/https://environmentclearance.nic.in/writereaddata/Online/TOR/30_May_2021_20145266026391624PFR.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help)