Shyam Steel Raghunathpur Steel Plant is a blast furnace (BF), direct reduced iron (DRI) and electric arc furnace (EAF) steel plant operating in Raghunathpur, West Bengal, India.

Location

The map below shows the exact location of the plant in Raghunathpur, West Bengal, India:

Loading map...
  • Location: Raghunathpur Steel & Allied Industrial Park-II, Mouza - Lachhmanpur, Jarukhamar, Siulibari, Digardhi, Shikratyar, Senera Block – Raghunathpur-I, District- Purulia, West Bengal, India
  • Coordinates (WGS 84): 23.590212, 86.724603 (exact)

Background

Shyam Steel Limited proposed to constructed an integrated steel plant in Raghunathpur, Purulia, West Bengal at an investment of around INR 3,445 crore.[1] An Integrated steel plant with a capacity of 1.1 mtpa was proposed at the site which obtained environmental clearance in 2010.[2] The project was abandoned in 2013[3], however, it was later modified with a new proposal in 2021.[4] The project was modified further in 2022.[5] The project is expected to be developed in three phases. Phase-I involves setting up of two DRI units of total capacity 420 ttpa and six induction furnaces of 420 ttpa total capacity. Phase-II involves the installation of four more DRI units of capacity 840 ttpa and six more induction furnaces of capacity 420 ttpa. Phase-III involves addition of an electric arc furnace of capacity 175 ttpa, a 750 m3 blast furnace, a basic oxygen furnace of 525 ttpa and other auxiliary facilities.[6] Phase- I began operation in February 2024.[7]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Start date Workforce size Power source
Main plant Operating[8] 2021[9] 2024[8] 8000[10] 57.5 MW WHRB from DRI and Coke Oven; 15 MW CFBC Boiler[11]
Expansion Announced[12] 2021[9] 57.5 MW WHRB from DRI and Coke Oven; 15 MW CFBC Boiler[11]
Expansion Announced[13] 2021[11] 58 MW WHRB from DRI and BF[11]

Table 2: Ownership and Parent Company Information

Phase Owner Owner company PermID Owner company GEM ID
Main plant Shyam Steel Industries Ltd[12] 4298177772 E100000130859

Table 3: Process and Products

Phase Steel product category Steel products Main production equipment Detailed production equipment
Main plant semi-finished[10] bars; angles[10] DRI, other[14][11] 2 DRI (2 600 tpd); 6 IF (6 20 ton)[14][11]
Expansion semi-finished[10] bars; angles[10] BF, DRI, other[14][11] 4 DRI (4 600 tpd); 6 IF (6 20 ton)[14][11]
Expansion semi-finished[10] bars; angles[10] BF, DRI, EAF, other[14][11] 1 BF (750 m3); 2 DRI (2 600 tpd); 6 IF (6 20 ton); 1 EAF (50 tonne); 1 BOF (50 tonne)[14][11]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Basic oxygen furnace steelmaking capacity Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 420 TTPA
Expansion announced 420 TTPA
Expansion announced 525 TTPA[11] 175 TTPA[13] 1120 TTPA[11][13]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
Main plant operating 420 TTPA[10][10] 420 TTPA[10][10]
Expansion announced 787 TTPA[11] 840 TTPA[10][10][10][10] 1627 TTPA[11][10][10][10][10]
Expansion announced 420 TTPA[10][10] 420 TTPA[10][10]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Phase Sinter Coke Pellets
Main plant 1000 TTPA[15]
Expansion 525 TTPA[10] 245 TTPA[10] 1000 TTPA[15]
Expansion 525 TTPA[10] 245 TTPA[10] 1000 TTPA[15]

Blast Furnace Details

Table 7: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown announced[10] 2021[9] unknown unknown 750 m³[11] 787[11] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. Cite error: Invalid <ref> tag; no text was provided for refs named :0
  2. "Environmental Clearance". MoEF&CC. 05 January, 2010. Retrieved 08 January, 2024. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  3. Basak, Probal (2013-01-20). "Shyam Steel abandons Raghunathpur project". Business Standard. Retrieved 2024-12-10.
  4. "Environmental Clearance application". MoEF&CC. 01 June 2021. Retrieved 08 January, 2024. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  5. "Environmental Clearance" (PDF). Shyam Steel. 25 November, 2023. Retrieved 07 March 2024. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  6. "Environment Clearance Documentation". Parivesh. Retrieved 07 March 2024. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  7. "Mamata Banerjee inaugurates Shyam Steel's Rs 1500-cr plant in Purulia". The Economic Times. 2024-02-27. ISSN 0013-0389. Retrieved 2024-03-07.
  8. 8.0 8.1 https://web.archive.org/web/20240312002522/https://economictimes.indiatimes.com/industry/indl-goods/svs/steel/mamata-banerjee-inaugurates-shyam-steels-rs-1500-cr-plant-in-purulia/articleshow/108043933.cms?from=mdr. Archived from the original on 12 March 2024. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 https://web.archive.org/web/20240111021035/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=5kxXGvcBx0F4EDeYLWou32lb5solsUD1b4YskBkF6TFz4hlAHoQpQeLkExU9iBcxbIAViYvCToh4DcvpL+iqh4lvdnmYc0pB4f%2FQsvCx1q7cEGxiMwi1nZJgLQwlooWkf1hWnwxUCEiaZTThPrFG%2FQ==&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%2FpgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3p%2F41fTQPSrCxchmj8kKGKfA==. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  10. 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 10.13 10.14 10.15 10.16 10.17 10.18 10.19 10.20 10.21 10.22 10.23 10.24 10.25 10.26 10.27 https://web.archive.org/web/20240111025707/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=5kxXGvcBx0F4EDeYLWou32lb5solsUD1b4YskBkF6TFCcByCKtses40gBgQHfy2p4YhcNaysM94VgDoiKnUffac2w553fIxGyaX2iSs%2FoGrfKFE7yTg3cA2wSkI8FpFm2YKWvM1gSU1SeNTddOEOoA==&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%2FpgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  11. 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 (PDF) https://web.archive.org/web/20240309035454/https://shyamsteel.com/wp-content/uploads/2024/01/SSWPL-EC-COMPLIANCE.pdf. Archived from the original (PDF) on 09 March 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  12. 12.0 12.1 https://web.archive.org/web/20240111011143/https://environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA%2FWB%2FIND%2F213283%2F2021&pid=New. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 (PDF) https://web.archive.org/web/20240309035407/https://shyamsteel.com/wp-content/uploads/2023/04/EC-SSWPL-28.02.2023.pdf. Archived from the original (PDF) on 09 March 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 https://parivesh.nic.in/newupgrade/#/proposal-summary/proposal-document?proposal=1797913&proposal_no=IA%2FWB%2FIND1%2F408696%2F2022&proposal_id=1797911. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 https://web.archive.org/web/20240111030321/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=kH7wGRU7KptYglccm272HC9BvqEnzvJPCVxUouc7aHW1BSkAKPelhzaAu7Pjktdqwro9N15uToQ%2FA3%2FCLBdfkrAZlfLpXSGskuqA8Rvkp2QFlSMVePtBcGDQtP0f8DBQ&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%2FpgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)

Resources