Search results
From Global Energy Monitor
- Gran Canaria LNG Terminal (category Proposed LNG terminals in Spain)Gran Canaria LNG Terminal, also known as the Arinaga LNG Terminal, was a proposed LNG terminal in Spain's Canary Islands. As of July 2024, there have been8 KB (1,058 words) - 19:19, 4 December 2024
- Mugardos LNG Terminal (category Proposed LNG terminals in Spain)per year Mugardos LNG Terminal is an LNG terminal in Galicia, Spain. It commenced operations in November 2007. Mugardos LNG Terminal includes two storage12 KB (1,447 words) - 19:27, 4 December 2024
- Puerto de la Luz LNG Terminal (category Proposed LNG terminals in Spain)Puerto de la Luz LNG Terminal is a proposed LNG terminal in Spain's Canary Islands. The terminal's proposed location is at Puerto de la Luz in Las Palmas, the9 KB (1,030 words) - 19:39, 4 December 2024
- Nigeria-Morocco Gas Pipeline (category Proposed pipelines in Spain)m/year Length: 5,660 km Status: Proposed Start year: 2046 Cost: US$25 billion The Nigeria-Morocco Gas Pipeline was proposed in a December 2016 agreement between15 KB (2,395 words) - 19:36, 4 December 2024
- Hydrogen Interconnector Spain-Portugal was a proposed hydrogen pipeline in Spain and Portugal. It is currently considered cancelled, because it was rebranded8 KB (969 words) - 14:54, 26 January 2024
- Morocco FSRU Terminal is a proposed LNG import terminal in Morocco. The FSRU is expected to be built in Mohammedia Port, Morocco. Loading map... {"type":"SATELLITE"5 KB (563 words) - 19:40, 4 December 2024
- Nador FSRU is a proposed liquefied natural gas (LNG) import terminal in Morocco. The terminal is proposed to be located in Nador West Med Port, Nador,6 KB (660 words) - 19:54, 4 December 2024
- engaged in LNG-related businesses. Cheniere owns and operate the Sabine Pass LNG receiving terminal in Louisiana and the Corpus Christi LNG terminal in Texas5 KB (663 words) - 20:35, 29 April 2021
- South Transit Eastern Pyrenees (STEP) Gas Pipeline (category Existing pipelines in Spain)(STEP) Gas Pipeline was a proposed gas pipeline in Spain and France. In January 2019, the regulating bodies of France and Spain officially rejected the request3 KB (360 words) - 11:05, 30 April 2021
- Maghreb-Europe Gas Pipeline (category Existing pipelines in Spain)prevented. Also natural gas consumption in Spain was too low to justify the pipeline construction. In 1992, ministers of Spain and Algeria agreed to start construction8 KB (1,004 words) - 19:28, 4 December 2024
- Dakhla LNG Terminal (category LNG Terminals)Dakhla LNG Terminal is a proposed liquefied natural gas (LNG) import terminal in Western Sahara. The terminal is proposed to be located in the Port of6 KB (654 words) - 19:53, 4 December 2024
- Jorf Lasfar LNG Terminal (category LNG terminals in Morocco)Jorf Lasfar LNG Terminal is a proposed LNG import terminal in El Jadida province, Morocco. The map below shows the location of Jorf Lasfar, the approximate6 KB (703 words) - 20:02, 4 December 2024
- Spain-Portugal Interconnector Gas Pipeline (category Existing pipelines in Spain)Spain-Portugal Interconnector Gas Pipeline was a proposed gas pipeline in Spain running to the Portuguese border. The project was cancelled in 2020. The5 KB (557 words) - 19:28, 4 December 2024
- workforce in the renewable energy sector, just behind Brazil. Of the approximately 266,000 jobs in the renewable sector in 2020, 194,000 were in liquid biofuels51 KB (4,835 words) - 17:55, 18 January 2023
- EastMed Gas Pipeline (category Proposed pipelines in Cyprus)than France, Spain, and Italy emit altogether in a year. Global Witness also conservatively estimates that the gas transported by the project in one year could22 KB (3,090 words) - 19:33, 4 December 2024
- Spanish Hydrogen Backbone (category Existing pipelines in Spain)Spanish Hydrogen Backbone is a proposed hydrogen/gas pipeline in Spain. This pipeline runs from the Benavente, Spain to Zaragoza, Spain. This new pipeline7 KB (740 words) - 19:50, 4 December 2024
- Cross Island Pipeline (category Existing Pipelines in Trinidad and Tobago)BP PLC unit Amoco Trinidad (LNG) BV, British Gas Trinidad LNG Ltd., Repsol LNG Port Spain BV, and Tractebel Trinidad LNG Ltd., but became a sole NGC project4 KB (568 words) - 19:36, 4 December 2024
- HySoW Mediterranean Pipeline is a proposed hydrogen pipeline system in France. HySoW Mediterranean: The pipeline is proposed to run from Barbaira to Lias,3 KB (263 words) - 20:02, 4 December 2024
- Bilbao–Villapresente Gas Pipeline (category Existing pipelines in Spain)Pipeline is an operating gas pipeline in Spain. The pipeline starts in Bilbao, Spain, and runs to Villapresente, Spain. Loading map... {"type":"ROADMAP","minzoom":false5 KB (489 words) - 19:46, 4 December 2024
- Spain-France East Interconnector (category Existing pipelines in Country A)Spain-France East Interconnector was a proposed gas pipeline between Spain and France. As of 2022 it is considered shelved. The pipeline is proposed to3 KB (419 words) - 20:16, 21 February 2023