- Lithuania-Latvia Interconnection Gas Pipeline (category Proposed Pipelines in Lithuania) (section Proposed Expansion Background)year Proposed capacity: Length: 138 kilometers Status: Operating Start Year: 1962 Built in 1962, the Lithuania-Latvia Interconnection Gas Pipeline is the11 KB (1,341 words) - 21:53, 28 August 2023
- Construction was completed in October 2015 (€60 million, with €27.6 million coming from EU funds). The proposed expansion of the Lithuania-Latvia Interconnection13 KB (1,448 words) - 21:22, 24 July 2024
- Druzhba Oil Pipeline (category Existing pipelines in Lithuania) (section Kuibyshev-Unecha-Mozyr-1 oil pipeline)670 km in Poland, 130 km in Hungary, 332 km in Lithuania, 420 km in Latvia, and around 400 km in Slovakia and in the Czech Republic. The pipeline crosses54 KB (8,031 words) - 16:23, 2 April 2024
- Gas Interconnection Poland-Lithuania (GIPL) (category Existing Pipelines in Lithuania)AB Amber Grid (Lithuania) Owner: Gaz-System (Poland), AB Amber Grid (Lithuania) Parent: Gaz-System (Poland), EPSO-G (Lithuania) Proposed capacity: 2.4 billion13 KB (1,787 words) - 20:48, 5 July 2022
- Riga FSRU (category Proposed LNG terminals in Latvia)Riga FSRU is a proposed liquefied natural gas (LNG) terminal in Latvia. In 2011, a study found that Riga's port would be the best place in the country to5 KB (736 words) - 21:29, 24 July 2024
- Odessa–Brody Oil Pipeline (category Existing oil pipelines in Ukraine)an interest in using the pipeline in the direction originally intended, in order to transfer oil from the Caspian to Europe. The pipeline was planned to14 KB (1,913 words) - 19:21, 20 February 2024
- Klaipeda-Kursenai Gas Pipeline (category Existing pipelines in Lithuania) (section Pipeline details)Klaipeda-Kursenai Gas Pipeline is a natural gas pipeline in Lithuania. The pipeline runs from Klaipeda, Lithuania to Kursenai, Lithuania. Loading map... {"type":"ROADMAP"6 KB (607 words) - 18:35, 3 October 2022
- Skulte LNG Terminal (category Proposed LNG terminals in Latvia)million, in the project. In May 2022, Latvian fuel trader Virši-A acquired a 20% stake in the project from developer Skulte LNG Terminal. In announcing14 KB (1,779 words) - 21:37, 24 July 2024
- Argo FSRU (category Proposed LNG terminals in Greece)FSRU is a proposed floating storage regasification unit (FSRU) terminal for LNG import in Greece. The terminal is proposed to be located in the Port of5 KB (598 words) - 19:10, 5 October 2023
- systems). With 2,144 km of pipeline projects in development, Poland ranked 16th in the world in terms of planned expansion by length in 2021. With 167,733 BOE/d33 KB (3,297 words) - 18:12, 10 November 2022
- electricity and 456MW of heat, built in 1956 to 1958. It was retired in 2015. The Ostrołęka B power station was built in 1972. It consists of three units with22 KB (2,296 words) - 23:42, 13 September 2024
- feeding pipeline in Russia (Gryazovets–Vyborg gas pipeline) began on 9 December 2005 in the town of Babayevo in Vologda Oblast. It was completed in 2010.94 KB (10,198 words) - 22:44, 23 July 2024
- Paldiski LNG Terminal (category Proposed LNG terminals in Estonia)Underground Gas Storage facility in Latvia will continue to be filled in order to ensure sufficient supply for winter 2022. In April 2022, as efforts were stepped9 KB (1,195 words) - 17:06, 23 July 2024
- Brunsbüttel FSRU (category Proposed LNG terminals in Germany)2022 Financing: FID Status: Associated infrastructure: The FSRU was proposed in 2022 in response to the European gas crisis and the Russian invasion of Ukraine13 KB (1,288 words) - 17:37, 10 September 2024
- Tallinn LNG Terminal (category Proposed LNG terminals in Estonia)Tallinn LNG Terminal is a proposed LNG terminal in Estonia. The map below shows the location of the project, in Muuga harbor, Harju County. Tallinn is7 KB (944 words) - 17:11, 23 July 2024
- Zeebrugge LNG Terminal (category Proposed LNG terminals in Belgium)terminal in the Belgian port of Zeebrugge. It has a capacity of 9 billion cubic meters per year. It was proposed in 1976, construction began in 1982, and13 KB (1,532 words) - 17:24, 31 July 2024
- is a proposed hydrogen pipeline system running East from Poland, and North through Lithuania, Latvia and Estonia to Finland. The pipeline is proposed to3 KB (273 words) - 18:50, 20 August 2024
- Europe Gas Tracker Report 2022 methodology (section Table 3. Future gas infrastructure in EU countries (under construction or proposed))reviewed on a rolling basis: Proposed: Projects that have appeared in corporate or government plans, or in news reports, in either pre-permit or permitted27 KB (1,801 words) - 19:18, 7 April 2022
- Portovaya LNG Terminal (category LNG terminals in Russia)deliveries to the Russian enclave of Kaliningrad in the event that pipeline deliveries via Belarus and Lithuania are halted. Peton, the contractor responsible7 KB (760 words) - 20:21, 24 June 2024
- Energy Monitor calculations, covering 'proposed' projects which have appeared in corporate or government plans in either pre-permit or permitted stages15 KB (2,090 words) - 11:36, 9 November 2020