Sulawesi Labota power station is an operating power station of at least 1900-megawatts (MW) in Bahodopi, Morowali, Morowali Regency, Central Sulawesi, Indonesia with multiple units, some of which are not currently operating. It is also known as 青山工业园拉波塔电厂.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Sulawesi Labota power station | Bahodopi, Morowali, Morowali Regency, Central Sulawesi, Indonesia | -2.8679078, 122.1770864 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3: -2.8679078, 122.1770864
- Unit 4, Unit 5, Unit 6: -2.8689871, 122.17188
- Unit 7, Unit 8, Unit 9: -2.8688307, 122.1692807
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | construction | coal: unknown | 350 | unknown | – |
Unit 2 | construction | coal: unknown | 350 | unknown | – |
Unit 3 | construction | coal: unknown | 380 | unknown | – |
Unit 4 | operating | coal: unknown | 380 | supercritical | 2023 |
Unit 5 | operating | coal: unknown | 380 | supercritical | 2023 |
Unit 6 | operating[1] | coal: unknown | 380 | supercritical | 2023[1] |
Unit 7 | operating[2] | coal: unknown | 380 | supercritical | 2023[2] |
Unit 8 | operating[3] | coal: unknown | 380 | supercritical | 2024[3] |
Unit 9 | construction | coal: unknown | 380 | supercritical | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | PT Walsin Nickel Industrial Indonesia [100%] | Walsin Lihwa Corp |
Unit 2 | LSI (印尼永恒冶炼有限公司) [100%] | Eternal Tsingshan Group Ltd |
Unit 3 | Indonesia Huaqing Aluminum Co Ltd [100%] | Eternal Tsingshan Group Ltd; Huafeng Group |
Unit 4 | Indonesia Wanjia Ferro Nickel Co Ltd [100%] | Indonesia Wanjia Ferro Nickel Co Ltd [100.0%] |
Unit 5 | Indonesia Zhaohui Ferro Nickel Co Ltd [100%] | Indonesia Zhaohui Ferro Nickel Co Ltd [100.0%] |
Unit 6 | PT Sulawesi Mining Investment [100%] | Dingxin Group [55.0%]; PT Bintang Delapan Group [45.0%] |
Unit 7 | PT Sulawesi Mining Investment [100%] | Dingxin Group [55.0%]; PT Bintang Delapan Group [45.0%] |
Unit 8 | PT Sulawesi Mining Investment [100%] | Dingxin Group [55.0%]; PT Bintang Delapan Group [45.0%] |
Unit 9 | PT Sulawesi Mining Investment [100%] | Dingxin Group [55.0%]; PT Bintang Delapan Group [45.0%] |
Project-level captive use details
- Captive industry use (heat or power): power
- Captive industry: Aluminum, Nickel, Other Metals & Mining
Background
Units 1-3 (Sulawesi Mining power station, Phase 5)
Units 1-3 of the Sulawesi Labota power station (青山工业园拉波塔电厂1-3号机组) also appear to be referred to as Phase 5 of the Sulawesi Mining power station (青山工业园自备电厂五期). Construction reportedly began in March 2020, comprising 2 x 350 MW units and one 380 MW unit.[4] Further details on the Phase where unknown.
Units 4-6
In August 2021, China Energy Construction Group East China Construction Investment Co., Ltd., a subsidiary of China Energy Construction Group Zhejiang Thermal Power Construction Co., Ltd. signed a contract with Qingshan Indonesia Morovali Park Rapo to build the 3 x 380 MW supercritical plant in Qingshan Industrial Park.[5]
In April 2023, Unit 4 began operating. The unit would reportedly help to "effectively alleviate the current shortage of power consumption in the Morawali Industrial Park" (Google translate).[6]
In July 2023, Unit 5 began operating.[7]
In August 2023, Unit 6 began operating.[8]
Units 7-9
In 2021, an additional three units (7#-9#) were also recruiting bids.[9][10] The capacity of these units was unclear.
According to February 2022 reporting, the project construction period was set to start April 2022 and end October 31, 2022, when the first unit would be connected to the grid, followed by the second unit in 2022, and the third unit in January 2023.[11][12]
As of January 2023, Planet imagery suggested that Unit 7 and Unit 8 had entered construction.
In February 2023, reporting indicated that equipment deliveries for the construction of units 7, 8 and 9 were ongoing.[13] Construction work was in progress in October 2023.[14]
In December 2023, Unit 7 began operating.[15]
In May 2024, Unit 8 was in a testing phase.[16] In June 2024, Unit 8 began operating.[17]
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240703225535/https://m.bjx.com.cn/mnews/20230904/1329650.shtml. Archived from the original on 03 July 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 https://mp.weixin.qq.com/s?__biz=MzkzMDQwMTM4Nw==&mid=2247484453&idx=1&sn=56a49092be3a23153a41162a08462776&chksm=c27b9921f50c1037c94b01975a5c208495c26ef0da1c483d8bea672d28893df8d78edc30b67f&mpshare=1&scene=1&srcid=0115ubsUaZXtU7VdF7p2hNVC&sharer_shareinfo=f32ab37a0f61a2354b1f48687c3679ef&sharer_shareinfo_first=39f423ff032386aac4fe3151ea411453&exportkey=n_ChQIAhIQ0iRaRfo6br%2FffMUlz8KU5hKZAgIE97dBBAEAAAAAAA3zElHeHLwAAAAOpnltbLcz9gKNyK89dVj0AVANVi6WNwstglOyw8E4UJjHk3KIH52QZMRNv55NzpPWXAuyWt21mLQsXzqZTcPRpYJrdZrDz71fGqhepIFOkhv78QCV8BFvwpnzHoEiDyzsUOdDiekcrAdffPra5g7mMtieOln0%2Bc6dBm5edvWOIxBPEgpMnCU7X5Ju6q9tfCSKwZRJn%2BuJUF1wEHm%2B5ox%2BubbzjU15JxpQfCorg%2BPkyBzDVRY5nnkWOAc4PGG903T5nfpiRKGB1q%2FK%2Ft7IhdSVimCX2GPbhqaV6HI0u5lQETQAs3l9gUZlNkc%2FZXq3HycpnagIiEbxSuz4OmMcHYZBeTF7&acctmode=0&pass_ticket=uZJUNCICtCPrFpDOt7JdJbyOsKEkcV4tFFfmrug2Iq7HBJKSIKWB8Zisnh5LtCWRPN7pWjsoFcJv%2BF33yH3dHQ%3D%3D&wx_header=0.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240703225545/https://www.sohu.com/a/786025198_121613636. Archived from the original on 03 July 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 印尼青山五期2×350MW+1×380MW项目#2锅炉第一根柱顺利起吊, sohu.com, March 4, 2021
- ↑ 中国能建签订青山印尼摩罗哇丽园区拉波塔电厂4号、5号、6号机组燃煤电站PC项目, Aug. 27, 2021
- ↑ 印尼拉波塔电厂4号机组投产, Liquified Natural Gas Web, Apr. 23, 2023
- ↑ 印尼拉波塔电厂5号机投产, 中国国际电子商务, July 6, 2023
- ↑ 印尼拉博塔电厂6号机组并网发电!, m.bjx.com, September 4, 2023
- ↑ "印尼拉波塔7#~9#机组项目给水泵汽轮机设备采购-中标公告_中国拟在建项目网". hw.bhi.com.cn. 2021-11-18.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "安徽电建一公司]印尼拉波塔7#~9#机组项目主变采购_标客栈". www.biaokezhan.com. 2021-12-03.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 印尼摩罗哇丽工业园区拉波塔电厂4#~6#机组3×380MW电厂项目电气、热工单体调试技术服务工程招标公告, dlztb, February 28, 2022
- ↑ 印尼摩罗哇丽工业园区拉波塔7~9机组3×380MW电厂PC项目#7-#9机组干煤棚网架封闭EPC工程, dlztb, April 26, 2022
- ↑ 淮南发货 目的地印尼, 淮南网, February 28, 2023
- ↑ 印尼拉波塔电厂8号机组发电机定子吊装就位, 中国能建, October 17, 2023
- ↑ 热烈庆祝振兴公司印尼拉波塔电厂项目7号机组首次启动并网成功!, mp.weixin.qq.com, December 23, 2023
- ↑ 印尼拉波塔项目8号机组锅炉吹管顺利完成, power.in-en.com, May 21, 2024
- ↑ 印尼摩罗瓦利拉波塔电厂8号机组并网发电, Sohu, June 14, 2024