Sunflag Iron and Steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Sunflag Iron and Steel plant is a steel plant in Warthi, Bhandara, Maharashtra, India that operates blast furnace (BF), direct reduced iron (DRI), steelmaking, and electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Warthi, Bhandara, Maharashtra, India:

Loading map...
  • Location: 441906 Bhandara Road, Warthi, Maharashtra, India
  • Coordinates (WGS 84): 21.232929, 79.632398 (exact)

Background

Sunflag Iron and Steel Company Limited was incorporated in September 1984.[1][2] The company received environmental clearance in 2017 to expand its capacity from 0.5 mtpa to 1.025 mtpa.[3]

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source Iron ore source Coal source
1989[4] 2691[5] 30 MW captive power plant[6] LMEL[7] Captive mines[7]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Sunflag Iron and Steel Co Ltd 4295872653 E100001000589 Sunflag Iron and Steel Co Ltd[8] 4295872653 E100001000589

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 Main production equipment
crude, semi-finished, finished rolled[9] ingot, bar, billet, coil, pig iron, DRI[9] automotive, tools and machinery, transport[10] 2022[11] BF; DRI; EAF; Steel other/unspecified

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Other/unspecified steelmaking capacity Nominal crude steel capacity (total)
announced 500[12][13] 500[12][13]
operating 525[4][9][14] 525[4][9][14]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
announced 300[13] 740[13] 1040[13]
operating 300[6][14] 262[6] 562[6][14]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter
364[6][15]

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production Total (all routes)
2019 unknown unknown
2020 288[16] [16] 288[16]
2021 489[16] [16] 489[16]
2022 409[17] [17] 409[17]
2023 433[18] [18] 433[18]

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production DRI production Other/unknown iron production Total (all routes)
2019 unknown unknown unknown
2020 315[16] 50[16] -1[16] 364[16]
2021 373[16] 96[16] -1[16] 468[16]
2022 369[17] 114[17] -1[17] 482[17]
2023 391[18] 144[18] [18] 535[18]

Unit Details

Table 9: Blast Furnace Details

Unit name Status Announced date Start date Furnace manufacturer and model Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown BF (1) operating[6] 2006[19] MECON Kalugin Shaftless Stove (KSS)[6][19] 350.0[19] 300[14][6] unknown 2023[7]
unknown BF (2) announced[13] 2017[13] 350.0[13] 300[13]

Table 10: Direct Reduced Iron Furnace Details

Unit name Status Announced date Start date Furnace type Current capacity (ttpa) Reductant
DRI 1 operating[16] rotary kiln[15] 131[6] coal[20]
DRI 2 operating[16] 1989[4] rotary kiln[15] 131[6] coal[20]
unknown DRI (1) announced[13] 2017[13] rotary kiln[13] 154[13]
unknown DRI (2) announced[13] 2017[13] rotary kiln[13] 154[13]
unknown DRI (3) announced[13] 2014[21] rotary kiln[13] 108[13]
unknown DRI (4) announced[13] 2014[21] rotary kiln[13] 108[13]
unknown DRI (5) announced[13] 2014[21] rotary kiln[13] 108[13]
unknown DRI (6) announced[13] 2014[21] rotary kiln[13] 108[13] [13]

Table 11: Electric Arc Furnace Details

Unit name Status Start date Furnace manufacturer and model Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[14] 2003[22] Mannesmann Demag[15] 525[9][14][4] 55.0[6]

Table 12: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % granulated pig iron
unknown EAF (1) yes[6] >0[6] >0[6] >0[6]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Corporate filing" (PDF). BSE India. 28 August, 2023. Retrieved 10 January 2024. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  2. "Sunflag Iron & Steel Company Ltd. Company History and Annual Growth Details Read more at: https://www.goodreturns.in/company/sunflag-iron-steel/history.html". Good returns. Retrieved 10 January 2024. {{cite web}}: External link in |title= (help); line feed character in |title= at position 76 (help)CS1 maint: url-status (link)
  3. "EC 2017 amendment" (PDF). Sunflag Steel. 2020-11-09. Retrieved 2024-11-19.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20230320121441/https://sunflagsteel.com/. Archived from the original on 2023-03-20. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://web.archive.org/web/20240115061750/https://www.bseindia.com/xml-data/corpfiling/AttachHis/dbed5e19-1726-49ae-bb05-ef454c1baa44.pdf. Archived from the original (PDF) on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 https://web.archive.org/web/20230320121443/https://sunflagsteel.com/units/. Archived from the original on 2023-03-20. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 (PDF) https://www.careratings.com/upload/CompanyFiles/PR/202401140100_Sunflag_Iron_And_Steel_Co_Limited.pdf. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20230320121444/https://sunflagsteel.com/company/. Archived from the original on 2023-03-20. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 https://web.archive.org/web/20240111030552/https://sunflagsteel.com/process/. Archived from the original on 2024-01-11. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20230320121446/https://sunflagsteel.com/applications/. Archived from the original on 2023-03-20. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20230320121441/https://sunflagsteel.com/certification/. Archived from the original on 2023-03-20. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 (PDF) https://sunflagsteel.com/wp-content/uploads/2024/07/MoEFCC-Six-Monthly-EC-Compliance-Oct-2023-to-Mar-2024.pdf. {{cite web}}: Missing or empty |title= (help)
  13. 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 13.11 13.12 13.13 13.14 13.15 13.16 13.17 13.18 13.19 13.20 13.21 13.22 13.23 13.24 13.25 13.26 13.27 13.28 13.29 (PDF) https://sunflagsteel.com/wp-content/uploads/2024/07/EC-2017-amendment-09-11-20.pdf. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 14.6 (PDF) https://web.archive.org/web/20240115083017/https://www.careratings.com/upload/CompanyFiles/PR/06072021062446_Sunflag_Iron_and_Steel_Company_Limited.pdf. Archived from the original (PDF) on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 https://sunflagsteel.com/manufacturing-unit/. {{cite web}}: Missing or empty |title= (help)
  16. 16.00 16.01 16.02 16.03 16.04 16.05 16.06 16.07 16.08 16.09 16.10 16.11 16.12 16.13 16.14 16.15 (PDF) https://web.archive.org/web/20240115075202/https://sunflagsteel.com/wp-content/uploads/2022/09/36th-Annual-Report-2021-22.pdf. Archived from the original (PDF) on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 17.2 17.3 17.4 17.5 17.6 (PDF). 2023-12-31 https://web.archive.org/web/20240115075658/https://sunflagsteel.com/wp-content/uploads/2023/08/37th-Annual-Report-2022-23.pdf. Archived from the original (PDF) on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  18. 18.0 18.1 18.2 18.3 18.4 18.5 18.6 (PDF) https://sunflagsteel.com/wp-content/uploads/2024/09/38th-Annual-Report-2023-24.pdf. {{cite web}}: Missing or empty |title= (help)
  19. 19.0 19.1 19.2 https://www.scribd.com/document/495686114/0865-F5010-00000-TS01. {{cite web}}: Missing or empty |title= (help)
  20. 20.0 20.1 (PDF) https://web.archive.org/web/20240513203715/https://sunflagsteel.com/wp-content/uploads/2020/12/MoEFCC-Six-Monthly-EC-Compliance-Report-Apr-20-to-Sep-20.pdf. Archived from the original (PDF) on 2024-05-13. {{cite web}}: Missing or empty |title= (help)
  21. 21.0 21.1 21.2 21.3 (PDF) https://mpcb.ecmpcb.in/notices/pdf/Executive_summary_English_sunflag_Revised.pdf. {{cite web}}: Missing or empty |title= (help)
  22. https://www.goodreturns.in/company/sunflag-iron-steel/history.html. {{cite web}}: Missing or empty |title= (help)

Resources