Surgut-Gorky-Polotsk Oil Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Surgut-Gorky-Polotsk Oil Pipeline, also known as Surgut-Polotsk Oil Pipeline (Russian: Нефтепровод Сургут - Горький - Полоцк) is an operating oil pipeline in Russia and Belarus.[1]

Location

The pipeline starts in Surgut, Khanty-Mansi Autonomous Okrug, Russia and runs to Polotsk, Vitebsk Region, Belarus.[2]

Loading map...

Project details

  • Operator: Transneft[2]
  • Owner: Transneft[2]
  • Parent company: Transneft[2]
  • Capacity: 120 mtpa,[2] 69.5 mtpa[3]
  • Length: 3250 km[2]
  • Diameter: 1020 mm[2]
  • Status: Operating[2][4]
  • Start year: 1981[2]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and resources

References

  1. "Official Internet Portal of Legal Information," Accessed August 12, 2020
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 "Energy Base," Accessed August 16, 2020
  3. "О внесении изменений в схему территориального планирования Российской Федерации в области федерального транспорта (в части трубопроводного транспорта), утвержденную распоряжением Правительства Российской Федерации от 6 мая 2015 г. N 816-р от 19 марта 2020 - docs.cntd.ru". docs.cntd.ru. Retrieved 2023-02-02.
  4. "83 объекта после ремонта ввело в эксплуатациию АО «Транснефть-Верхняя Волга» в 2022 году". vgoroden.ru. 2023-01-20. Retrieved 2023-01-02.{{cite web}}: CS1 maint: url-status (link)