Tangshan Xinglong Iron and Steel Co Ltd

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Tangshan Xinglong Iron and Steel Co Ltd (唐山兴隆钢铁有限公司), also known as Luan County Xinglong Iron and Steel Co., Ltd.; Luan County Hongting Iron and Steel Co., Ltd., is a basic oxygen furnace (BOF) steel plant operating in Tangshan, Hebei, China.

Location

The map below shows the exact location of the plant in Tangshan, Hebei, China:

Loading map...
  • Location: 800 meters north of traffic post, Zhenzi Town, Luan County, Tangshan City, Hebei Province
  • Coordinates (WGS 84): 39.847612, 118.348448 (exact)

Background

On October 30, 2019, the government of Tangshan City issued the "Tangshan City November Plan for Strengthening Air Pollution Prevention and Control," which required Xinglong Iron and Steel to shut down and cease emitting pollutants before November 15, 2019. Reports contend that Xinglong Iron and Steel's 1.5 million tons of ironmaking capacity has been transferred to Guangxi Liuzhou Iron and Steel Group.[1]

According to the announcement of the capacity replacement plan in January 2022, the company plans to build a 110-ton electric furnace to replace two 50-ton basic oxygen furnaces.[2]The transformation and upgrading project has commenced construction.[3]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Pre-retirement announcement date Idled date Retired date Workforce size Power source
Main plant Operating[4] 2001[5] 14[4]
Closure Operating pre-retirement[6][7] 2022-02[8]
Expansion Construction[6][7] 2022-02[8] 2023[6] High-Temperature, Ultra-High-Pressure Coal Gas Power Generation[9]
Closure Retired[5] 2022[8] 2019[5] 2022[8]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company GEM ID
Main plant Tangshan Xinglong Steel Co Ltd [100%] E100000123261 [96.5%]; E100000001753 [3.5%] Tangshan Xinglong Iron and Steel Co., Ltd.[10] E100000126949

Table 3: Process and Products

Phase Steel product category Steel products Main production equipment Detailed production equipment
Main plant finished rolled[5] hot rolled steel strip[5] BF, BOF[5] 3BOF(3 x50tonne )[5]
Closure finished rolled[5] hot rolled steel strip[5] BOF[11] 2 BOF(2 x50tonne )[11]
Expansion finished rolled[5] hot rolled steel strip[5] EAF[11] 1 EAF(1x110-tonne)[11]
Closure finished rolled[5] hot rolled steel strip[5] BF[5] 3 BOF(3 x50tonne )[5]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Basic oxygen furnace steelmaking capacity Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 850 TTPA[5] 850 TTPA[5]
Closure operating pre-retirement 1700 TTPA[5][5] 1700 TTPA[5][5]
Expansion construction 825 TTPA[8] 825 TTPA[8]
Closure retired

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
Main plant operating
Closure operating pre-retirement
Expansion construction
Closure retired 1660 TTPA[5][5] 1660 TTPA[5][5]

Blast Furnace Details

Table 6: Blast Furnace Details

Unit name Status Announced date Construction date Start date Retired date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown retired[12] unknown unknown unknown 2019[5] 530 m³[5] 580[5] unknown unknown
unknown retired[12] unknown unknown unknown 2019[5] 1080 m³[5] 1080[5] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 唐山兴隆钢铁全线停产,柳钢2.9亿竞得其150万吨炼铁产能, 世界金属报道, Retrieved on: Aug. 12, 2020
  2. 唐山兴隆钢铁有限公司炼钢产能等量置换转型升级项目产能置换方案公告,河北省工信厅,February 14, 2022
  3. "重磅!河北多个钢铁项目获批!". 网易. 2023-04-17.
  4. 4.0 4.1 https://web.archive.org/web/20230918175610/https://aiqicha.baidu.com/company_detail_29027292120910. Archived from the original on 18 September 2023. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 5.22 5.23 5.24 5.25 5.26 5.27 5.28 5.29 5.30 https://web.archive.org/web/20220124215235/http://www.worldmetals.com.cn/viscms/jinritoutiao2308/20191118/249522.html. Archived from the original on 24 January 2022. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20240119035034/https://www.163.com/dy/article/I2H8EP2V05389UAT.html. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://tangshan.huanbohainews.com.cn/2022-07/27/content_50113903.html. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 https://m.mysteel.com/22/0214/09/19456786FFB0C754_abc.html. {{cite web}}: Missing or empty |title= (help)
  9. http://fagaiwei.tangshan.gov.cn/tsfagaiwei/fgwzhengfuxinxigongkaipingtai/20180517/593586.html. {{cite web}}: Missing or empty |title= (help)
  10. https://www.qcc.com/firm/3cd60c7ed1fb0207f8a7dbe2f7dbf71a.html. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 https://web.archive.org/web/20220319204906/https://factory.mysteel.com/22/0112/14/E113D6DC6DE401F6.html. Archived from the original on 19 March 2022. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 http://www.worldmetals.com.cn/viscms/jinritoutiao2308/20191118/249522.html;http://www.worldmetals.com.cn/viscms/jinritoutiao2308/20191118/249522.html. {{cite web}}: Missing or empty |title= (help)

Resources