Tebinbulak mining and smelting complex (Горно-металлургический комплекс «Тебинбулак», ГМК «Тебинбулак»), also known as Tebinbulak Mining and Metallurgical Complex, is a steel plant in Karauzyak, Republic of Karakalpakstan, Uzbekistan that operates direct reduced iron (DRI) technology.

Location

The map below shows the approximate location of the plant in Karauzyak, Republic of Karakalpakstan, Uzbekistan:

Loading map...
  • Location: Special Industrial Zone "Qorao'zak"
  • Coordinates (WGS 84): 42.1780016, 60.4038997 (approximate)

Background

The Tebinbulak Mining and Smelting Complex is part of the structural division of Triangul Metals Tebinbulak. The facility will supply up to 1.8 million tons of iron ore metallurgical raw materials (DRI) annually to the domestic market. An additional 1.5 million tons of DRI will be supplied to the Gallaral Metallurgical Cluster for steel production. The complex was initially expected to be operational in 2024.[1] In May 2024 it was reported that construction of the pelletizing plant at the premises of the Tebinbulak mining and smelting complex had begun, with completion anticipated in Q4 2025.[2]

Plant Details

Table 1: General Plant Details

Announced date Construction date Start date Workforce size Power source Iron ore source Coal source
2018[3] 2023[4] 2025[5][6] 5000[5] unknown Tebinbulak mine[7] unknown

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Triangul Metals Tebinbulak JSC unknown E100001012111 Triangul Metals Tebinbulak JSC[7] unknown E100001012111

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Responsible steel Main production equipment
crude[7] DRI[7] unknown unknown unknown DRI

Table 4: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
construction 3600[8][9] 3600[8][9]

Table 5: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF NF NF 5000[7][6]

Unit Details

Table 6: Direct Reduced Iron Furnace Details

Unit name Status Announced date Construction date Start date Furnace type Current capacity (ttpa)
unknown DRI (1) construction[4] 2020[10] 2023[4] 2025[5][11] not found 3600[8][9]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "TRIANGUL METALS". TRIANGUL METALS. 2024. Retrieved October 17, 2024.{{cite web}}: CS1 maint: url-status (link)
  2. "Дан старт строительства фабрики окомкования железорудного сырья на ГМК Тебинбулак (Russian)". Triangul Metals. May 29, 2024. Retrieved October 17, 2024.{{cite web}}: CS1 maint: url-status (link)
  3. https://uz.sputniknews.ru/20201127/Stroitelstvo-GMK-v-Karakalpakstane-na-kakom-etape-seychas-proekt-15486965.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20241008161928/https://www.metalinfo.ru/ru/news/146586. Archived from the original on 2024-10-08. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://www.gazeta.uz/ru/2024/02/26/beeline-uzbekistan/. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://www.triangulmetals.com/tpost/72so7o5yv1-dan-start-stroitelstva-fabriki-okomkovan. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 https://web.archive.org/web/20231107015322/https://www.triangulmetals.com/. Archived from the original on 2023-11-07. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://www.ent-en.com/en/page/publication/210. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 https://web.archive.org/web/20221024101058/https://im-mining.com/2021/09/27/enter-engineering-thyssenkrupp-tackle-tebinbulak-iron-ore-deposit-uzbekistan/. Archived from the original on 2022-10-24. {{cite web}}: Missing or empty |title= (help)
  10. https://www.uzdaily.uz/ru/gmk-tebinbulak-etapy-realizatsii-investitsionnogo-proekta/. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20240912175144/https://www.triangulmetals.com/en. Archived from the original on 2024-09-12. {{cite web}}: Missing or empty |title= (help)

Resources