Tebinbulak mining and smelting complex
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Tebinbulak mining and smelting complex (ГМК «Тебинбулак» (Russian)) is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant under construction in Karatau, Karauzyak District, Uzbekistan.
Location
The map below shows the approximate location of the plant in Karatau, Karauzyak District, Uzbekistan:
- Location: Tebinbulak deposit, Karauzyak District, Uzbekistan
- Coordinates (WGS 84): 42.108709, 60.511691 (approximate)
Background
The Tebinbulak Mining and Smelting Complex is part of the structural division of Triangul Metals Tebinbulak. The facility will supply up to 1.8 million tons of iron ore metallurgical raw materials (DRI) annually to the domestic market. An additional 1.5 million tons of DRI will be supplied to the Gallaral Metallurgical Cluster for steel production. The complex was initially expected to be operational in 2024.[1] In May 2024 it was reported that construction of the pelletizing plant at the premises of the Tebinbulak mining and smelting complex had begun, with completion anticipated in Q4 2025.[2]
Plant Details
Table 1: General Plant Details
Plant status | Announced date | Construction date | Start date | Workforce size | Iron ore source |
---|---|---|---|---|---|
Construction[3][4] | 2021[5] | 2023[3][4] | 2024[6][5][7] | 3000[8] | Tebinbulak mine |
Construction[3][4] | 2021[5] | 2023[3][4] | 2024[6][5][7] | 3000[8] | Tebinbulak mine |
Table 2: Ownership and Parent Company Information
Owner | Owner company GEM ID |
---|---|
Triangul Metals Tebinbulak[9] | E100001012111 |
Table 3: Process and Products
Steel product category | Steel products | Main production equipment | Detailed production equipment |
---|---|---|---|
crude[10] | DRI; HBI[10] | DRI, EAF[11][10] | DRI plant (3.6 mtpa supplied by Enter Engineering and Wood)[11][10] |
crude[10] | DRI; HBI[10] | DRI, EAF[11][10] | DRI plant (3.6 mtpa supplied by Enter Engineering and Wood)[11][10] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
construction | 1500 TTPA[11] | 1500 TTPA[11] |
announced | –[11] | –[11] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|
construction | –[11][12] | –[11][12] |
announced | 3600 TTPA[11][12] | 3600 TTPA[11][12] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Pellets |
---|
5000 TTPA[10] |
5000 TTPA[10] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "TRIANGUL METALS". TRIANGUL METALS. 2024. Retrieved October 17, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Дан старт строительства фабрики окомкования железорудного сырья на ГМК Тебинбулак (Russian)". Triangul Metals. May 29, 2024. Retrieved October 17, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 3.3 https://www.metalinfo.ru/ru/news/146586.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://www.triangulmetals.com/tpost/vb8m1n5s81-karernaya-tehnika-na-mestorozhdenii-tebi.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20211022191206/http://www.tradearabia.com/news/IND_387571.html. Archived from the original on 22 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://review.uz/post/na-baze-mestorojdenii-tebinbulak-postroyat-gorno-metallurgicheskiy-kompleks.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20231107015322/https://www.triangulmetals.com/. Archived from the original on 07 November 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20201128121834/https://www.uzdaily.uz/ru/post/57326. Archived from the original on 28 November 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20231107015322/https://www.triangulmetals.com/. Archived from the original on 07 November 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 10.9 https://web.archive.org/web/20231107015322/https://www.triangulmetals.com/. Archived from the original on 07 November 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 https://www.ent-en.com/en/page/publication/210.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 https://web.archive.org/web/20221024101058/https://im-mining.com/2021/09/27/enter-engineering-thyssenkrupp-tackle-tebinbulak-iron-ore-deposit-uzbekistan/. Archived from the original on 24 October 2022.
{{cite web}}
: Missing or empty|title=
(help)
Resources