Ternium Pesquería steel plant
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Ternium Pesquería steel plant (Planta Ternium Pesquería (Spanish)) is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant under construction in Pesquería, Nuevo León, Mexico.
Location
The map below shows the exact location of the plant in Pesquería, Nuevo León, Mexico:
- Location: Pesquería, Nuevo León, Mexico
- Coordinates (WGS 84): 25.743837, -99.965278 (exact)
Plant Details
Table 1: General Plant Details
Plant status | Announced date | Construction date | Start date |
---|---|---|---|
Construction[1] | 2023-02[2] | 2023-12[3][4] | 2026[1][5][3] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Ternium SA [100.0%] | 4295856130 [100%] | E100001000384 [100%] | Ternium Mexico SA de CV[2][6] | 4295884332 | E100000004192 |
Table 3: Process and Products
Steel product category | Steel products | Main production equipment | Detailed production equipment |
---|---|---|---|
semi-finished[7] | slabs[7] | DRI, EAF[1][8] | 1 DRI, 1 EAF[9] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
construction | 2600 TTPA[2][10][1] | 2600 TTPA[2][10][1] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|
construction | 2100 TTPA[2][10][1] | 2100 TTPA[2][10][1] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.aist.org/news/steel-news/2023/february/13-17-february-2023/ternium-to-invest-us$2-2-billion-in-north-american.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://us.ternium.com/en/media/news/new-projects-on-the-horizon--06688040223.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240110020339/https://www.ternium.com/es/novedades/noticias/ternium-nueva-aceria-nl--13498717423. Archived from the original on 10 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230621114322/http://www.eleconomista.com.mx/estados/Ternium-invertira-3200-millones-de-dolares-para-consolidar-la-aceria-mas-moderna-y-sustentable-de-America-Latina-20230620-0069.html. Archived from the original on 21 June 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119043927/https://www.wkrn.com/business/press-releases/accesswire/762257/ternium-announces-location-of-new-steel-slab-mill/. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.seaisi.org/details/23050?type=news-rooms.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://www.seaisi.org/details/22386?type=news-rooms.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230307082737/https://seekingalpha.com/news/3936376-ternium-weighs-new-22b-eaf-steel-plant-in-northern-mexico. Archived from the original on 07 March 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230315013937/https://www.fastmarkets.com/insights/higher-steel-demand-north-america-nearshoring-until-2025. Archived from the original on 15 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 (PDF) https://web.archive.org/web/20230724104023/https://ar.ternium.com/media/gltpn3xt/reporte-de-sustentabilidad-2022.pdf. Archived from the original (PDF) on 24 July 2023.
{{cite web}}
: Missing or empty|title=
(help)
Resources