Tete Steel Maputo plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Tete Steel Maputo plant, also known as Baobab Steel Mozambique, is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant under construction in Tete, Mozambique.

Location

The map below shows the exact location of the plant in Tete, Mozambique:

Loading map...
  • Location: Tete, Tete, Mozambique
  • Coordinates (WGS 84): -15.724345, 33.762664 (exact)

Plant Details

Table 1: General Plant Details

Plant status Announced date Construction date Workforce size Iron ore source
Construction[1][2] 2016-10[1] 2022[2] 2580[3] Captive Tenge-rioni iron mine[4]

Table 2: Ownership and Parent Company Information

Owner Owner company PermID Owner company GEM ID
Baobab Steel Ltd[5] 4295899134 E100000130753

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
semi-finished; finished rolled[1] rebar; wire rod; billets[1] DRI, EAF[1] DRI plant (4 coal-based rotary kilns); 2 EAF[1][4]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
construction 500 TTPA[1][1] 500 TTPA[1][1]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Sponge iron/DRI capacity Nominal iron capacity (total)
construction 1100 TTPA[6][1][6][1][6][1][6][1] 1100 TTPA[6][1][6][1][6][1][6][1]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter
2500 TTPA[1] 2350 TTPA[1]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 https://web.archive.org/web/20220319094108/https://baobab-steel.com/tete-steel-and-vanadium. Archived from the original on 19 March 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20191031130753/https://clubofmozambique.com/news/tete-steel-plant-produce-1-5-million-tonnes-year/. Archived from the original on 31 October 2019. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 (PDF) https://static1.squarespace.com/static/6131f8def0c741565fab6ea9/t/61f25c50896d102d3065a8b5/1643273343815/Baobab+Steel+-+Jan+2022.pdf. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240125055530/https://baobab-steel.com/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 (PDF) https://static1.squarespace.com/static/6131f8def0c741565fab6ea9/t/62762f1c124810740aeaa436/1651912546464/Baobab+Steel++-+Pig+Iron+May+2022.pdf. {{cite web}}: Missing or empty |title= (help)