Tianjin LNG Terminal (Beijing Gas Group)

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Tianjin LNG Terminal (Beijing Gas Group) (北京燃气集团天津LNG接收站) is an LNG terminal operating in Nanjiang Port, Binhai New District, Tianjin Prefecture, China.[1] Expansions to the facility have been proposed.

Location

Loading map...

Project details

Phase 1, 2 and 3

  • Owner: Beijing Gas Group (Tianjin) LNG Co., Ltd. 北京燃气集团(天津)液化天然气有限公司[2]
  • Parent company: Beijing Gas Group Co., Ltd. 北京市燃气集团有限责任公司
  • Location: Nangang, Binhai District, Tianjin, China
  • Coordinates: 38.738256, 117.714095 (exact)
  • Capacity:
    • Phase 1: 5 mtpa[3]
    • Phases 2 and 3: 3.5 mtpa[4]
  • Status:
    • Phase 1: Operating[1]
    • Phases 2 and 3: Construction[5][6]
  • Type: Import
  • Start year:
    • Phase 1: 2023
    • Phase 2:
    • Phase 3:

Background

Tianjin LNG Terminal (Beijing Gas Group) is an LNG terminal in Nangang, Tianjin, China. It is located next to Tianjin LNG Terminal (Sinopec). The LNG project aims to secure natural gas supply for Beijing.[4]

The project received a permit for construction for all three phases in January 2020[7], and the construction began on March 24, 2020.[8][9] [10]The operation date was set at the end of 2022.[11] Beijing Gas invited expressions of interest for LNG supplies from 2023 to 2032 in June 2021.[12]

To finance the buildout, the developers received a sovereign loan from Asian Investment Bank (US$500 million) and New Development Bank (€430 million) in March 2021.[13]

The first phase contains 4 storage tanks, two 220,000 cubic meters each and two 200,000 cubic meters each, and a 215-kilometer gas pipeline. It will have the gasification capacity of 60 million cubic meters per day.[14] At the end of 2022, the construction of Phase 1 was reportedly completed.[15]

The second and third phase will add 6 more storage tanks. The planned operation date for second and third phases are set at 2023 and 2024, respectively.[14][16]

In June 2023, Reuters reported that Phase 1 would become operational in October 2023.[17]

In September 2023, Phase 1 become operational after receiving its first cargo.[18]A 217-kilometer long gas pipeline transporting the gasified LNG to Beijing was also completed at the same time[19], which is capable to supply 20 million cubic meters natural gas per day, equivalent to one third of Beijing's natural gas consumption. [20][21]

Articles and resources

References

  1. 1.0 1.1 LNG Prime Staff (2023-09-27). "Beijing Gas gets commissioning cargo at Tianjin Nangang LNG terminal". LNG Prime. Retrieved 2023-10-05.
  2. "北京燃气集团(天津)液化天然气有限公司LNG泊位正式实现对外开放". www.teda.gov.cn. 2023-09-13.{{cite web}}: CS1 maint: url-status (link)
  3. "https://lngprime.com/asia/chinas-beijing-gas-says-first-phase-of-tianjin-nangang-lng-terminal-completed/69928/". {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)
  4. 4.0 4.1 "北京燃气天津南港LNG应急储备项目环境影响报告书" (PDF). 国家生态环境部 mee.gov.cn. 2020-02-01.{{cite web}}: CS1 maint: url-status (link)
  5. "北京燃气集团携手法国GTT公司再建天津南港LNG接收站项目6座超大薄膜型全容罐-国际燃气网". gas.in-en.com. 2021-03-09. Retrieved 2022-06-27.{{cite web}}: CS1 maint: url-status (link)
  6. "http://tj.people.com.cn/n2/2021/0608/c375366-34766992.html". tjpeople. Retrieved 2022-06-27. {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)
  7. "https://webcache.googleusercontent.com/search?q=cache:UQv5pXpSKHcJ:https://www.ndrc.gov.cn/xxgk/zcfb/tz/202007/t20200731_1235150.html+&cd=4&hl=en&ct=clnk&gl=ch". ndrc. Retrieved 2022-06-27. {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)
  8. "https://www.ndrc.gov.cn/xxgk/zcfb/tz/202007/t20200731_1235150.html". ndrc. Retrieved 2022-06-27. {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)
  9. www.in-en.com https://www.in-en.com/article/html/energy-2298122.shtml. Retrieved 2022-06-27. {{cite web}}: Missing or empty |title= (help)
  10. "北京燃气天津南港液化天然气应急储备项目一期工程实现机械完工-新华网". m.news.cn. 2022-12-31.{{cite web}}: CS1 maint: url-status (link)
  11. "天津南港天然气应急储备项目开工建设". 国家能源报道. 2020-11-20.{{cite web}}: CS1 maint: url-status (link)
  12. Jessica Jaganathan, Beijing Gas seeks interest for LNG supply for new terminal, Reuters, Jun. 1, 2021
  13. 北京日报客户端 (2021-03-17). "建造世界最大储罐!北京天然气应急储备项目明年投产". news.sina.com.cn. Retrieved 2022-06-27.
  14. 14.0 14.1 "北京新增4.8亿方天然气应急调峰能力!能源保障大幅提升". bj.bjd.com.cn. 2023-01-03.{{cite web}}: CS1 maint: url-status (link)
  15. "北京燃气天津南港项目一期工程完工-新华网-来源: 北京晚报". bj.news.cn. 2023-01-04. Retrieved 2023-02-18.{{cite web}}: CS1 maint: url-status (link)
  16. "大项目新进展丨北京燃气天津南港项目一期预计10月投产运营". www.teda.gov.cn. 2023-06-23.{{cite web}}: CS1 maint: url-status (link)
  17. "https://www.nasdaq.com/articles/beijing-gas-to-start-regas-terminal-in-oct-secures-term-contracts". {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)
  18. "https://lngprime.com/asia/beijing-gas-gets-commissioning-cargo-at-tianjin-nangang-lng-terminal/93007/". {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)
  19. "外输管道投产通气!北燃南港LNG应急储备项目又有新进展". www.tjbh.com. 2023-09-07.{{cite web}}: CS1 maint: url-status (link)
  20. "天津南港液化天然气应急储备项目迎来首个供暖季". www.begcl.com. 2023-12-07.{{cite web}}: CS1 maint: url-status (link)
  21. "提升首都天然气保供能力 北京燃气天津南港液化天然气应急储备项目一期投产". bj.people.com.cn. 2023-09-23.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles