Topy Industries Toyohashi steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Topy Industries Toyohashi steel plant (トピー工業株式会社) is a steel plant in Toyohashi, Aichi, Japan that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Toyohashi, Aichi, Japan:

Loading map...
  • Location: 1 Akemi-cho, Toyohashi-shi, Aichi 441-8510 Japan
  • Coordinates (WGS 84): 34.719644, 137.322259 (exact)

Background

Toyohashi Steel Mill Plant of Toto Steel Mfg., Co., Ltd. (current Toyohashi Factory of Topy Industries, Ltd.) was established in 1958.[1] In 2015, Topy Industries introduced a 200-ton eco-friendly high-efficiency electric furnace (ECOARC™*), one of the largest in Japan.[2]

Topy Industries Group has set a long-term sustainability vision, “TOPY Sustainable Green Vision 2050,” which envisions to reduce CO2 emissions by 46% by 2030 from 2013 levels and achieve carbon neutrality by 2050.[3]

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source
1958[4] 1002[5] unknown

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Topy Industries Ltd [100.0%] 4295878604 [100.0%] E100001000737 [100.0%] Topy Industries Ltd [100%][6] 4295878604 E100001000737 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 Main production equipment
semi-finished, finished rolled[7] rail, sections, bar, flat, angle, h-beam[7] automotive, building and infrastructure, transport[7] 2018[8] EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 960[9] 960[9]

Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown unknown

Unit Details

Table 6: Electric Arc Furnace Details

Unit name Status Start date Furnace manufacturer and model Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[10] 2015[10] Steel Plantech ECOARC[11][10][11][10] 960[9] 200.0[12][10]

Table 7: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap
unknown EAF (1) yes[10] 100.00[10]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Brief history | Corporate Overview | Topy Industries, Limited". web.archive.org. 2022-06-29. Retrieved 2024-02-23.
  2. "Steel Manufacturing Process | Manufacturing Process | Steel | Business | Topy Industries, Ltd". www.topy.co.jp. Retrieved 2024-02-23.
  3. "Long-Term Sustainability Vision | Sustainability | Topy Industries, Ltd". www.topy.co.jp. Retrieved 2025-01-01.
  4. https://web.archive.org/web/20220629073102/https://www.topy.co.jp/en/info/history.html. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://web.archive.org/web/20240125235628/https://data.swcms.net/file/corp-topy/dam/jcr:2129c11b-4447-4bbe-b0d3-b418ff4cb2f4/S100R3BF.pdf. Archived from the original (PDF) on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20220111174535/https://www.topy.co.jp/en/info/profile.html. Archived from the original on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://web.archive.org/web/20220120105304/https://www.topy.co.jp/en/dept/steel.html. Archived from the original on 2022-01-20. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20180914184433/http://www.topy.co.jp:80/en/csr/environment/environment.html. Archived from the original on 2018-09-14. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 https://web.archive.org/web/20220119194007/https://www.spglobal.com/platts/en/market-insights/latest-news/metals/112218-japans-topy-industries-restarts-electric-arc-furnace-after-oct-blast. Archived from the original on 2022-01-19. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 https://web.archive.org/web/20240129172602/https://www.topy.co.jp/en/dept/steel/process/steel.html. Archived from the original on 2024-01-29. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20240122233907/https://steelplantech.com/product/ecoarc/. Archived from the original on 2024-01-22. {{cite web}}: Missing or empty |title= (help)
  12. https://web.archive.org/web/20220119164127/https://www.topy.co.jp/en/dept/steel/factory.html. Archived from the original on 2022-01-19. {{cite web}}: Missing or empty |title= (help)

Resources