Toscelik Iskenderun steel plant is a steel plant in İskenderun, Hatay, Türkiye that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in İskenderun, Hatay, Türkiye:

Loading map...
  • Location: Org. San. Böl. Sarıseki, İskenderun, Hatay, Türkiye
  • Coordinates (WGS 84): 36.687943, 36.214871 (exact)

Background

There is currently a 2000-ttpa EAF expansion being built on the site that is expected to come online in 2022.[1]

Plant Details

Table 1: General Plant Details

Construction date Start date Workforce size Power source Iron ore source Coal source
2021[2] 2023[3][4] 1300[5] unknown unknown unknown

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Tosyalı Holding AŞ 5000866267 E100001000709 Toscelik Profil ve Sac Endustrisi AS [100%][6] 4298250645 E100000130880 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
semi-finished, finished rolled[6] pipe, profile[6] automotive, building and infrastructure, energy[7] 2024-03-07[8] Expired[9] unknown EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 4000[10][11] 4000[10][11]

Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown unknown

Unit Details

Table 6: Electric Arc Furnace Details

Unit name Status Announced date Construction date Start date Furnace manufacturer and model Current capacity (ttpa)
unknown EAF (1) operating[5][2] 2020[2] Primetals EAF Quantum[2][2] 2000[11][10]
unknown EAF (2) operating[5][2] 2021[10] 2022[10] Primetals EAF Quantum[2][2] 2000[11][10]

Table 7: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap
unknown EAF (1) yes[10] 100.00[12]
unknown EAF (2) yes[10] 100.00[12]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "普锐特冶金技术将为土耳其TOSYALI提供第二座量子电炉并扩大近期所订板坯连铸机的产能". Primetals. Archived from the original on March 20, 2022. Retrieved March 20, 2022.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20221206120424/https://magazine.primetals.com/2021/04/08/tosyali-turkey-second-eaf-quantum-electric-arc-furnace-and-slab-caster-capacity-expansion/. Archived from the original on 2022-12-06. {{cite web}}: Missing or empty |title= (help)
  3. https://www.tosyaliholding.com.tr/en/our-scope-of-activity/group-companies/domestic-subsidiaries/tosyali-demir-celik-san-as. {{cite web}}: Missing or empty |title= (help)
  4. https://www.harsco.com/press-release/tosyali-harsco-environmental-signs-10-year-Acontract-tosyali-holding-provide-services. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://web.archive.org/web/20230531105819/https://www.steelradar.com/en/haber/production-operations-started-at-tosyali-sariseki-plant/. Archived from the original on 2023-05-31. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20240125060951/http://www.toscelik.com.tr/kurumsal/tarihce. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20220520212600/https://www.toscelik.com.tr/en/products/our-sector-based-products/oil-gas-and-mining. Archived from the original on 2022-05-20. {{cite web}}: Missing or empty |title= (help)
  8. (PDF) https://www.toscelik.com.tr/uploads/file/0ff338e97e141f56a314ca02e07039f5-1710740224770.pdf. {{cite web}}: Missing or empty |title= (help)
  9. (PDF) https://www.toscelik.com.tr/uploads/file/abaf86fda19123d0b9bc4f30fe0b8ecf-1615882622460.pdf. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 https://web.archive.org/web/20220319184942/https://www.primetals.com/press-media/news/primetals-technologies-to-supply-second-eaf-quantum-electric-arc-furnace-and-expand-recently-ordered-slab-caster-capacity-for-tosyali-in-turkey. Archived from the original on 2022-03-19. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 https://www.recyclingtoday.com/news/primetals-steel-furnace-recycling-turkey-tosyali/. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 https://www.steelinsiderdaily.com/news/innovative-leap-in-turkish-steel-industry%3A-tosyal%C4%B1-holding-embraces-eaf-quantum-technology. {{cite web}}: Missing or empty |title= (help)