Toscelik Iskenderun steel plant is an electric arc furnace (EAF) steel plant operating in İskenderun, Hatay, Türkiye.
Location
The map below shows the exact location of the plant in İskenderun, Hatay, Türkiye:
- Location: Org. San. Böl. Sarıseki, İskenderun, Hatay, Türkiye
- Coordinates (WGS 84): 36.687943, 36.214871 (exact)
Background
There is currently a 2000-ttpa EAF expansion being built on the site that is expected to come online in 2022.[1]
Plant Details
Table 1: General Plant Details
Plant status | Construction date | Start date | Workforce size |
---|---|---|---|
Operating[2] | 2021[3] | 2023[4] | 1300[2] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|
Tosyalı Holding AŞ [100.0%] | E100001000709 [100%] | Toscelik Profil ve Sac Endustrisi AS[5] | 4298250645 | E100000130880 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | Main production equipment | Detailed production equipment |
---|---|---|---|---|
semi-finished; finished rolled[5] | pipes, box profiles[5] | automotive; building and infrastructure; energy[6] | EAF[7][8] | 2 EAF (Primetals; began in 2020 and 2022)[3] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 4000 TTPA[8][9][8][9] | 4000 TTPA[8][9][8][9] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "普锐特冶金技术将为土耳其TOSYALI提供第二座量子电炉并扩大近期所订板坯连铸机的产能". Primetals. Archived from the original on March 20, 2022. Retrieved March 20, 2022.
- ↑ 2.0 2.1 https://web.archive.org/web/20230531105819/https://www.steelradar.com/en/haber/production-operations-started-at-tosyali-sariseki-plant/. Archived from the original on 31 May 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20221206120424/https://magazine.primetals.com/2021/04/08/tosyali-turkey-second-eaf-quantum-electric-arc-furnace-and-slab-caster-capacity-expansion/. Archived from the original on 06 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://www.harsco.com/press-release/tosyali-harsco-environmental-signs-10-year-Acontract-tosyali-holding-provide-services.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20240125060951/http://www.toscelik.com.tr/kurumsal/tarihce. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220520212600/https://www.toscelik.com.tr/en/products/our-sector-based-products/oil-gas-and-mining. Archived from the original on 20 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 https://web.archive.org/web/20220319184942/https://www.primetals.com/press-media/news/primetals-technologies-to-supply-second-eaf-quantum-electric-arc-furnace-and-expand-recently-ordered-slab-caster-capacity-for-tosyali-in-turkey. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 https://www.recyclingtoday.com/news/primetals-steel-furnace-recycling-turkey-tosyali/.
{{cite web}}
: Missing or empty|title=
(help)