Tosyali Algerie Oran steel plant (شركة توسيالي الجزائرية التركية للحديد والصلب, Tosyali Algérie) is a steel plant in Bethiqua, Oran, Algeria that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Bethiqua, Oran, Algeria:
- Location: Pole Economique Bethiqua - BP 175, Bethiqua, Oran, Algeria
- Coordinates (WGS 84): 35.770912, -0.263031 (exact)
Background
The Tosyali Algerie Oran steel plant has seen increases in investments in phases since it first started operating.[1] In July 2021, the company announced it would be expanding capacity with a 2 mtpa electric arc furnace facility and 2.5 mtpa DRI plant. The expansion commenced operations in 2024.[2][3]
Plant Details
Table 1: General Plant Details
Start date | Workforce size |
---|---|
2013[4][5] | 8000[6][7] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Tosyalı Holding AŞ | 5000866267 | E100001000709 | Tosyali Ironsteel Industry Algerie SpA [100%][8][9] | 5074196906 | E100000131071 [100%] |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | Main production equipment |
---|---|---|---|
semi-finished, finished rolled[10] | billet, wire rod, rebar, hot rolled, slab, pipe[10][11] | yes[12][7] | DRI; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 6200[13][14][15][16] | 6200[13][14][15][16] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|
operating | 5000[16][17] | 5000[16][17] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Pellets |
---|
4000[18] |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | DRI production | Total (all routes) |
---|---|---|
2019 | 1540[19] | 1540[19] |
2020 | 2230[19] | 2230[19] |
2021 | 2280[20] | 2280[20] |
2022 | 2200[19] | 2200[19] |
2023 | 2360[19] | 2360[19] |
Unit Details
Table 9: Direct Reduced Iron Furnace Details
Unit name | Status | Construction date | Start date | Furnace manufacturer and model | Furnace type | Current capacity (ttpa) | Reductant |
---|---|---|---|---|---|---|---|
DRI Plant - 1 | operating[21] | – | 2018[22] | Midrex[23] | shaft furnace[24] | 2500[17] | methane[23] |
DRI Plant - 2 | operating[20][25] | 2021[23] | 2024[23] | Midrex; Paul Wurth Midrex[26][23] | shaft furnace[24] | 2500[16] | methane[23] |
Table 10: Electric Arc Furnace Details
Unit name | Status | Start date | Furnace manufacturer and model | Current capacity (ttpa) |
---|---|---|---|---|
EAF - 1 | operating[27][28] | 2013[14] | Tenova[29] | 1000[14] |
EAF - 2 | operating[14][28] | 2018[14] | Tenova[13] | 2500[16][14][15] |
EAF - 3 | operating[19] | 2024[30] | – | 2700[13][14] |
Table 11: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated | % other iron |
---|---|---|---|---|---|---|---|---|---|
EAF - 1 | yes[31] | 35.00[31] | 55.00[32][31] | unknown | – | unknown | unknown | unknown | 10.00[32][31] |
EAF - 2 | yes[21] | 35.00[21] | 55.00[23][32][31] | unknown | unknown | unknown | unknown | unknown | 10.00[23][32][31] |
EAF - 3 | yes[11] | 35.00[21] | 55.00[23][32][31] | unknown | unknown | unknown | unknown | unknown | 10.00[23][32][31] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Tosyalı Holding | Tosyalı Iron Steel Industry Algerie". www.tosyaliholding.com.tr. Retrieved 2023-06-22.
{{cite web}}
: horizontal tab character in|title=
at position 19 (help) - ↑ "Tosyali Algerie Reported Record DRI Production in 2021, Contracts for Second DRI Plant". AIST. 2/28/2022.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link) - ↑ "Tosyalı Algeria commences slab production | SEAISI". www.seaisi.org. Retrieved 2024-10-16.
- ↑ https://web.archive.org/web/20211127044200/https://www.tosyali-algerie.com/en/corporate/history. Archived from the original on 2021-11-27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20200629174841/http://www.tosyali-algerie.com:80/tosyali.asp?id0=2. Archived from the original on 2020-06-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.steelorbis.com/steel-news/latest-news/tosyali-algerie-to-commission-flat-steel-complex-in-oran-from-2024-1273694.htm?searchKey=algeria&sc=article.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://www.tosyali-algerie.com/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20211216201002/https://prd-wret.s3-us-west-2.amazonaws.com/assets/palladium/production/atoms/files/myb3-2016-ag.pdf. Archived from the original (PDF) on 2021-12-16.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20200629174836/http://www.tosyali-algerie.com:80/tosyali.asp?id0=1. Archived from the original on 29 June 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 https://web.archive.org/web/20221006175508/http://www.tosyali-algerie.com/tosyali.asp?id0=1&id1=23. Archived from the original on 2022-10-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://www.tosyali-algerie.com/complex.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220318111650/https://www.tosyali-algerie.com/arama-sonuc-sayfasi?keyword=iso+14001&language=406002&site=376000. Archived from the original on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 https://web.archive.org/web/20211127060123/https://www.tosyali-algerie.com/en/the-complex/units-and-technologies/eaf-meltshop. Archived from the original on 2021-11-27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 14.6 14.7 https://www.tosyali-algerie.com/about-us.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 (PDF) https://web.archive.org/web/20230410190908/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf (PDF).
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 16.4 16.5 https://web.archive.org/web/20220926134927/https://tenova.com/newsroom/press-releases/tenova-supply-new-electric-arc-furnace-eaf-tosyali-algeria. Archived from the original on 2022-09-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 (PDF) https://web.archive.org/web/20220318083849/http://www.midrex.com/wp-content/uploads/Midrex-Plants-Sheet2021-1.pdf. Archived from the original (PDF) on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211127055455/https://www.tosyali-algerie.com/en/the-complex/technologies/pelletizing. Archived from the original on 2021-11-27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 19.5 19.6 19.7 19.8 https://web.archive.org/web/20240126193758/https://www.midrex.com/tech-article/tosyali-algerie-jewel-of-the-algerian-steel-industry/. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 https://www.aist.org/news/steel-news/2022/february/tosyali-algerie-reported-record-dri-production-in.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 21.2 21.3 https://web.archive.org/web/20210419182816/https://www.tosyaliholding.com.tr/en/our-scope-of-activity/group-companies/international-subsidiaries/tosyali-iron-steel-industry-algerie. Archived from the original on 2021-04-19. Retrieved 2024-05-21.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "2022 World Direct Reduction Statistics" (PDF). Midrex. 2023-09-12. Archived from the original (PDF) on 2023-11-03.
- ↑ 23.0 23.1 23.2 23.3 23.4 23.5 23.6 23.7 23.8 23.9 (PDF) https://web.archive.org/web/20240122233422/https://www.midrex.com/wp-content/uploads/Midrex-DFM-4Qtr2023-Final.pdf. Archived from the original (PDF) on 2024-01-22.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 24.0 24.1 https://www.aist.org/tosyali-receives-hot-dri-conveyor-for-algerian-plant.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240309062339/https://gmk.center/en/news/tosyali-algerie-launches-second-dri-production-unit/. Archived from the original on 2024-03-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.seaisi.org/details/25465?type=news-rooms.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.tosyali-algerie.com/complex/eaf-meltshop.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 28.0 28.1 https://web.archive.org/web/20240126193936/https://greensteelworld.com/tosyali-algerie-sets-dri-production-record-in-2021. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://greensteelworld.com/tenova-to-supply-a-second-electric-arc-furnace-for-tosyali-algeria.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.seaisi.org/details/24765?type=news-rooms.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 31.0 31.1 31.2 31.3 31.4 31.5 31.6 31.7 (PDF) https://www.tosyali-algerie.com/media/High%20Scrap%20Content%20Wire%20Rod.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 32.0 32.1 32.2 32.3 32.4 32.5 (PDF) https://www.tosyali-algerie.com/media/High%20DRI%20Content%20Rebar%20.pdf.
{{cite web}}
: Missing or empty|title=
(help)