UMC Metals Chon Buri plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
UMC Metals Chon Buri plant is a steel plant in Amphoe Muang, Chonburi, Thailand that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Amphoe Muang, Chonburi, Thailand:
- Location: 9/10 Moo 5 Sangsuk-Bangpra Road, Amphoe Muang, Chonburi 20130, Thailand
- Coordinates (WGS 84): 13.275832, 100.969791 (exact)
Background
UMC Metals Co. Ltd was established in 1994 in Chonburi Province in Thailand.[1] In November 2012, the plant installed the energy efficient ECOARC which was inaugurated on February 06, 2013, after demonstrating 30% energy savings in comparison to conventional electric arc furnaces.[2] The ECOARC was expected to replace the conventional EAF of capacity 380 ttpa installed in 2002 at the plant, which had been operating at the plant since.[3]
Plant Details
Table 1: General Plant Details
Start date | Power source |
---|---|
1994[4] | unknown |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
UMC Metals Ltd | 5000024091 | E100001000453 | UMC Metals Ltd[4] | 5000024091 | E100001000453 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment |
---|---|---|---|---|
semi-finished, finished rolled[5] | billet, round bar, bar | yes[6] | unknown | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 805[7][8] | 805[7][8] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|---|
unknown EAF (1) | operating[9] | 2012[10] | Steel Plantech Ecoarc[10][10] | 805[8][7] | 70.0[5] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | yes[5] | 100.00[11] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "UMC Metals Ltd. - Company Profile". thai-rebar.com. Retrieved 2023-11-13.
- ↑ "News : NEDO's energy-saving technology model project by ECOARC™, Environmentally Conscious High-Efficiency Arc Furnace, was successfully demonstrated at UMC Metals in Thailand | Steel Plantech" (in 日本語). Retrieved 2023-11-13.
- ↑ "Clean Development Mechanism Project Design Document Form". UNFCCC. 22 December 2006. Retrieved 13 November, 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ 4.0 4.1 https://www.mbdatabase.com/Basic-Information/UMC-Metals-Ltd-formerly-Union-Metal-Co/11124/1.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20200924135841/http://www.umc.co.th/index.php?option=com_newsfeeds&catid=15&Itemid=42. Archived from the original on 2020-09-24.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) http://www.umc.co.th/files/The%20ISO14001&OHSAS18001.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 (PDF) https://web.archive.org/web/20230617170640/https://steelplantech.com/wp-content/uploads/2012/11/2012-09_The-First-ECOARC-in-KINGDOM-of-THAILAND.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 (PDF) https://web.archive.org/web/20190509160249/http://steelplantech.com/wp-content/uploads/2012/11/2012-09_The-First-ECOARC-in-KINGDOM-of-THAILAND.pdf. Archived from the original (PDF) on 2019-05-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20200924132636/http://www.umc.co.th/index.php?option=com_newsfeeds&catid=21&Itemid=56. Archived from the original on 2020-09-24.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 https://web.archive.org/web/20240122233907/https://steelplantech.com/product/ecoarc/. Archived from the original on 2024-01-22.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240906184148/http://www.umc.co.th/files/umc3.pdf. Archived from the original (PDF) on 2024-09-06.
{{cite web}}
: Missing or empty|title=
(help)