Urtuysky Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Urtuysky Coal Mine (Уртуйское месторождение) is an operating coal mine in Krasnokamensk, Krasnokamensky, Zabaykalsky, Russia.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Urtuysky Coal Mine | Krasnokamensk, Krasnokamensky, Zabaykalsky, Russia | 50.174699, 118.005352 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | 1993 | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
– | 2.8 | 2022 | Surface | Open Pit | – | 50* | 538* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
35 | – | – | – | Lignite | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Priargunsky Industrial Mining and Chemical Association PJSC | Rosatom | Russia |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
Saleable | 2[1] | 3[2] | 3[2] | 2[3] | 2[4] | 2[5] | 3[6] |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background
The Urtuysky Coal Mine (Уртуйское месторождение) is an operating surface coal mine in Zabaykalsky Krai, Russia. The Urtuysky coal mine is a surface coal mine. It is owned by Priargunsky Industrial Mining and Chemical Association (PIMCU), which is part of Rosatom.[7]
The mine has a capacity of 4.5 million tonnes per year[8], but it appears that it has reduced as PIMCU's 2021 Annual Report referred to capacity of 3.5 million tonnes.[9]
Production in 2020 was 2.9 million tonnes.[10] The same level of production was achieved in 2021, of which 1.7 was supplied to power plants within PIMCU's group and the rest to other domestic consumers.[9] Krasnokamenskaya CHP is the main consumer.[11] 2023 production was over 3 million tonnes.[12]
Existing reserves of 35 million tonnes allow the mine to continue producing until 2034.[9]
- Owner: Priargunsky Industrial Mining and Chemical Association PJSC
- Parent: Rosatom
- Location: Krasnokamensk, Krasnokamensky District, Zabaykalsky Krai, Russia
- Coordinates: 50.174699, 118.005352 (exact)
- Status: Operating
- Production Capacity: 3.5 Mt/year (capacity)[9], 2.9 million tonnes (2021)[9], 2.8 million tonnes (2022)[13]
- Total Reserves:
- Recoverable Reserves: 35 million tonnes (2021)[9]
- Coal type: Lignite (Thermal)
- Mine Type: Surface
- Start Year: 1993
- Source of Financing:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ https://nedradv.ru/nedradv/ru/page_news?obj=d63bd630c3a0d64877dd8a1ea46e2770.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://nedradv.ru/nedradv/ru/page_news?obj=a92f529c3962cda8dcd124919c1303b4.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://nedradv.ru/nedradv/ru/page_news?obj=994f4274f24b4f4ccf4fa9085724fb1a.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://priargunsky.armz.ru/images/File/priargunsky/2022/report_2021.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://nedradv.ru/nedradv/ru/page_news?obj=866227b33543d5b61ee8ed073df58d13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://neftegaz.ru/news/coal/813513-vyruchka-gornorudnogo-diviziona-rosatoma-uvelichilas-na-37-v-2023-g/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ PIMCU website. "About Us". Retrieved October 2022.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ Разрезоуправление «Уртуйское», PIMCU website, accessed May 2021.
- ↑ 9.0 9.1 9.2 9.3 9.4 9.5 PIMCU. "2021 Annual Report" (PDF). Retrieved October 2022.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ 2,9 млн тонн угля добыли на разрезе «Уртуйский» за 2020 год, Nedradv, 16 Feb. 2021.
- ↑ "ППГХО повышает эффективность дробления угля". www.vnedra.ru. October 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Выручка Горнорудного дивизиона Росатома увеличилась на 37% в 2023 г." neftegaz.ru. January 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "«Атомредметзолото» перевыполнило план по добыче урана и угля". nedradv.ru/. December 2022.
{{cite web}}
: CS1 maint: url-status (link)