Gaslub power station (Usina Termelétrica Gaslub) is a power station in pre-construction in Itaboraí, Rio de Janeiro, Brazil. It is also known as Comperj.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Gaslub power station Itaboraí, Rio de Janeiro, Brazil -22.645356, -42.860825 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Pre-construction[1][2][3][4][5] fossil gas: natural gas[6][3][2] 1200[3] combined cycle[7] not found 2030 (planned)[3]
2 Pre-construction[2][3][4] fossil gas: natural gas[2][3] 600[3] unknown not found 2030 (planned)[3]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Petróleo Brasileiro SA [100%][1] Petróleo Brasileiro SA [100.0%]
2 Petróleo Brasileiro SA [100%][1] Petróleo Brasileiro SA [100.0%]

Background

The Gaslub power station is a holdover from Petrobras' 2021-2025 strategic plan; the plant was originally intended to be part of the Rio de Janeiro Petrochemical Complex (Comperj) Project (subsequently rebranded as Gaslub).[8][9] News reports in 2021 and early 2022 indicated that the plant's viability was still being evaluated.[9][10][11]

In the project's early stages, the plant's generating capacity and status details were unclear. Brazil's national electrical agency ANEEL listed the plant as under construction[12]; however, Petrobras's GasLub web page described it as a future project to be developed with other investors[13], and Petrobras's Director of Energy Transition and Sustainability said in a June 2023 interview that the company had only recently revived talk of building the plant.[14]

The full scope of the Gaslub power plant project was first laid out in a June 2023 environmental impact study, which confirmed the capacity of Units I and II as 1200 MW and 600 MW, respectively.[15] News reports in late 2023 early 2024 indicated that Petrobras was seeking an environmental license for the 1800 MW plant, in hopes of entering it in Brazil's August 2024 energy auctions and obtaining contracts to supply electricity starting in January 2030.[16][17]

Petrobras's 2023 annual report, released in April 2024, noted that "the gas-fired thermoelectric plant is still under study, and its conceptual design has been completed and further planning steps are in progress."[18]

As of September 2024, the website for the Gaslub project (newly rebranded as Complexo de Energias Boaventura[19]) noted that both the 1200 MW Unit I and the 600 MW Unit II would deploy gas and steam turbines in a combined cycle configuration.[20] Dependable gas supply for the proposed plant was expected to be in place by mid-October 2024 upon the full commissioning of the associated Route 3 gas pipeline and the adjacent Itaboraí gas processing unit.[21][22]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240125090149/https://dadosabertos.aneel.gov.br/dataset/siga-sistema-de-informacoes-de-geracao-da-aneel/resource/76310626-e2e0-4880-b199-d63fe287f279. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240510202350/https://megawhat.energy/noticias/151783/petrobras-confirma-planos-de-nova-termeletrica-no-polo-gaslub-antigo-comperj. Archived from the original on 10 May 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://web.archive.org/web/20240510202547/https://petronoticias.com.br/petrobras-inicia-estudo-para-obter-licenca-de-termeletricas-no-polo-gaslub/. Archived from the original on 10 May 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240125104834/https://petrobras.com.br/quem-somos/polo-gaslub-itaborai. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240125104836/https://www.infomoney.com.br/negocios/diretor-diz-que-petrobras-petr4-discute-um-projeto-de-termeletrica-nova-no-gaslub/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20240125090332/https://epbr.com.br/estrategicos-na-transicao-energetica-gas-e-energia-minguam-na-petrobras-por-joao-montenegro/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240125112022/https://grandesconstrucoes.com.br/Conteudo/Exibir/comperj-el-obrador-empieza-a-tomar-forma. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. "Petrobras planeja desistir do Comperj e construir Termelétrica no lugar". Click Petroleo e Gas. April 25, 2019. Archived from the original on May 5, 2021. Retrieved May 6, 2021.
  9. 9.0 9.1 "Estratégicos na transição energética, gás e energia minguam na Petrobras, por João Montenegro". EPBR. February 26, 2021. Archived from the original on February 26, 2021. Retrieved May 6, 2021.
  10. "Petrobras inicia testes do Polo GasLub". CanalEnergia. January 31, 2022.{{cite web}}: CS1 maint: url-status (link)
  11. "Firjan participa de anúncios de projetos de infraestrutura para o Rio e o Brasil". Firjan. January 31, 2022.{{cite web}}: CS1 maint: url-status (link)
  12. "Sistema de Informações de Geração da ANEEL - SIGA". Agência Nacional de Energia Elétrica (ANEEL, Brazilian Electricity Regulatory Agency). Archived from the original on April 9, 2020. Retrieved 2023-04-17.
  13. "Polo GasLub Itaboraí". Petrobras. Retrieved 2023-04-17.{{cite web}}: CS1 maint: url-status (link)
  14. "Diretor diz que Petrobras (PETR4) discute um projeto de termelétrica nova no Gaslub". InfoMoney. June 22, 2023.{{cite web}}: CS1 maint: url-status (link)
  15. "EIA-Estudo de Impacto Ambiental-Parque Termoelétrico UTE Gaslub I e II". 2023-06-30. {{cite web}}: |first= missing |last= (help)CS1 maint: url-status (link)
  16. "PETROBRÁS INICIA ESTUDO PARA OBTER LICENÇA DE TERMELÉTRICAS NO POLO GASLUB". Petronotícias. 2023-12-11.{{cite web}}: CS1 maint: url-status (link)
  17. Moura, Betina (2024-01-29). "Brazil Rota 3 pipeline gas supply may fall short". Argus Media.{{cite web}}: CS1 maint: url-status (link)
  18. "Annual Report and Form 20-F 2023 (p 103)". Petrobras. 2024-04-11.{{cite web}}: CS1 maint: url-status (link)
  19. "Petrobrás Rebatiza o Polo Gaslub para Complexo Boaventura e Vai Inaugurar a Unidade em Plena Sexta-Feira 13". Petronoticias. 2024-09-11.{{cite web}}: CS1 maint: url-status (link)
  20. "Complexo de Energias Boaventura: Operações". Petrobras. Retrieved 2024-09-17.{{cite web}}: CS1 maint: url-status (link)
  21. Brelsford, Robert (2024-09-12). "Petrobras nears startup of Route 3 pre-salt gas plant, pipeline". Oil & Gas Journal.{{cite web}}: CS1 maint: url-status (link)
  22. "Petrobras anuncia início das operações do gasoduto Rota 3". Valor Econômico. 2024-08-09.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.