Uttam Galva Ferrous Bellary Steel Plant is a blast furnace-basic oxygen furnace (BF-BOF) announced steel plant in Bellary, Karnataka, India.

Location

The map below shows the exact location of the plant in Bellary, Karnataka, India:

Loading map...
  • Location: Kuduthini Village, Bellary, Karnataka, India
  • Coordinates (WGS 84): 15.184613, 76.824905 (exact)

Background

In 2021, Uttam Galva Ferous Limited (UGFL) received an in-principle approval from Government of Karnataka (GoK) to set up a 6 mtpa capacity integrated steel plant along with 893 MW Captive Power Plant at Bellary District in Karnataka. GoK has accorded approval to implement the project. The proposed steel plant of UGFL is likely to be commissioned by 2027-28.[1]

As of August 2023, the project had not begun implementation and the firm has said it will launch physical work on its factory as soon as it gets environment clearance and also sought an additional six years for full implementation of the project.[2] The firm seem to have received a three year extension for executing the project.[3]

Plant Details

Table 1: General Plant Details

Plant status Announced date Start date Workforce size Power source Iron ore source
Announced[4] 2021[4] 2028[4] 6427[4] 893 MW Captive Power Plant[4] Mines in Karnataka and Goa

Table 2: Ownership and Parent Company Information

Owner Owner company PermID Owner company GEM ID
Uttam Galva Ferrous Ltd[4] 5083786630 E100001012081

Table 3: Process and Products

Main production equipment Detailed production equipment
BF, BOF[4] 2 BF (4200 m3 each); 4 BOF (160 ton each)[4]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
announced 6000 TTPA[4][4][4][4] 6000 TTPA[4][4][4][4]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
announced 6464 TTPA[4][4] 6464 TTPA[4][4]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Coke Pellets
8532 TTPA[4] 2740 TTPA[4] 4000 TTPA[4]

Blast Furnace Details

Table 7: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown announced[4] 2021[4] unknown unknown 4200 m³[4] 3232[4] unknown unknown
unknown announced[4] 2021[4] unknown unknown 4200 m³[4] 3232[4] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. Cite error: Invalid <ref> tag; no text was provided for refs named :0
  2. Aug 28, TNN /; 2023; Ist, 11:45. "10 years after land allotted, Uttam Galva seeks 6 more to set up Ballari steel plant | Bengaluru News - Times of India". The Times of India. Retrieved 2024-11-18.{{cite web}}: CS1 maint: numeric names: authors list (link)
  3. Jan 2, Sandeep Moudgal / TNN / Updated:; 2024; Ist, 07:13. "CM asks for AG's report on unusedlands held by mining firms in Ballari | Bengaluru News - Times of India". The Times of India. Retrieved 2024-11-18.{{cite web}}: CS1 maint: extra punctuation (link) CS1 maint: numeric names: authors list (link)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 4.26 4.27 4.28 4.29 4.30 (PDF) https://web.archive.org/web/20240119002947/https://environmentclearance.nic.in/writereaddata/Online/TOR/16_Oct_2021_14040686755719812PFR_UGFL.pdf. Archived from the original (PDF) on 19 January 2024. {{cite web}}: Missing or empty |title= (help)