Víbora-Sirari-Yapacaní-Humberto Suárez Oil Pipeline
From Global Energy Monitor
Víbora-Sirari-Yapacaní-Humberto Suárez Oil Pipeline (also known as ONSZ-1) is an operating oil pipeline running from Víbora, Bolivia to Caranda, Bolivia, ultimately forming a loop with the Carrasco-Caranda Oil Pipeline (ONSZ-2).[1]
Location
The pipeline runs from Carrasco, Bolivia to Caranda, Bolivia, passing en route through YPFB plants at Víbora, Sirari and Yapacani, and the Humberto Suarez Roca pumping station, where the pipeline changes diameter and capacity.[1]
Project Details
- Operator: YPFB Transporte SA[2]
- Owner: YPFB Transporte SA[2]
- Parent company: Yacimientos Petrolíferos Fiscales Bolivianos (YPFB) 98.55%, Others 1.44%[3]
- Capacity:
- Length: 193 km[1]
- Diameter:
- Status: Operating[2]
- Start Year: 1989[1]
- Cost:
- Financing:
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "Bolivia Red de Oleoductos" (PDF). Oil Production. June 2005.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 "Sistemas de Transporte de Hidrocarburos Líquidos - YPFB Transporte". YPFB Transporte. Retrieved 2023-03-14.
- ↑ "¿Quiénes Somos? - YPFB Transporte". YPFB Transporte. Retrieved 2023-03-14.
- ↑ 4.0 4.1 "Información Operativa del Sistema de Transporte de Hidrocarburos Líquidos por Ductos" (PDF). YPFB Transporte SA. April 25, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 5.0 5.1 "Capacidad Oleoductos" (PDF). ANH.
{{cite web}}
: CS1 maint: url-status (link)