VAS Tue Minh Steel Binh Duong plant
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
VAS Tue Minh Steel Binh Duong plant (VAS Tuệ Minh), also known as TMS, is a steel plant in Bac Tan Uyen Town, Binh Duong, Vietnam that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Bac Tan Uyen Town, Binh Duong, Vietnam:
- Location: Lot A5, D2 Street, KSB Industrial Park (Zone B), Dat Cuoc Commune, Bac Tan Uyen, Binh Duong, Vietnam
- Coordinates (WGS 84): 11.113343, 106.831064 (exact)
Background
VAS Steel Tue Minh was founded in 2010. The Binh Duong plant began operation in 2016.[1]
Plant Details
Table 1: General Plant Details
Announced date | Start date | Workforce size |
---|---|---|
2010[2] | 2016[2] | 850[3][4] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Vietnam Advance Sprint Group JSC [100.0%] | unknown [100.0%] | E100000131144 [100.0%] | VAS Steel Tue Minh JSC [100%][5] | unknown | E100000131140 [100%] |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment |
---|---|---|---|---|---|
semi-finished, finished rolled[6] | billet, wire rod, rebar[6] | building and infrastructure[2] | yes[4] | unknown[4] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 500[4] | 500[4] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Start date | Current capacity (ttpa) |
---|---|---|---|
unknown EAF (1) | operating[4] | 2016[2] | 500[4] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated | % other iron |
---|---|---|---|---|---|---|---|---|---|
unknown EAF (1) | yes[6] | >0[6] | unknown | unknown | unknown | unknown | unknown | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "VAS Steel Tue Minh Joint Stock Company | TMS – A journey from inception to development". VAS Steel Tue Minh Joint Stock Company | TMS – A journey from inception to development. Retrieved 2024-03-01.
- ↑ 2.0 2.1 2.2 2.3 https://vasgroup.vn/news/vas-steel-tue-minh-joint-stock-company-tms-a-journey-from-inception-to-development.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.emis.com/php/company-profile/VN/Vas_Steel_Tue_Minh_Joint_Stock_Company__Cong_Ty_Co_Phan_Thep_Vas_Tue_Minh__en_7343712.html?utm_source=chatgpt.com.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 https://web.archive.org/web/20211209155205/https://vasgroup.vn/. Archived from the original on 2021-12-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220127015609/https://vasgroup.vn/about-us.html. Archived from the original on 27 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20220119235713/https://vasgroup.vn/product-steel.html. Archived from the original on 2022-01-19.
{{cite web}}
: Missing or empty|title=
(help)