Vallourec Jeceaba steel plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Vallourec Jeceaba steel plant (Usina siderúrgica de Jeceaba (Portuguese)), also known as VSB (Vallourec & Sumitomo Tubos do Brasil), is a blast furnace (BF) and electric arc furnace (EAF) steel plant operating in Jeceaba, Minas Gerais, Brazil.

Location

The map below shows the exact location of the plant in Jeceaba, Minas Gerais, Brazil:

Loading map...
  • Location: Distrito Industrial, S/N, 35.498-000 - Jeceaba, Minas Gerais, Brazil
  • Coordinates (WGS 84): -20.582683, -43.971555 (exact)

Background

Vallourec Jeceaba steel plant, also commonly known as Vallourec & Sumitomo Tubos do Brasil (VSB), is a Brazilian steel company belonging to the joint venture formed by the French group Vallourec and the Japanese Nippon Steel & Sumitomo Metal Corporation (NSSMC).[1] The plant specializes in producing seamless steel pipes for the oil and gas industry.[2]

Located in the municipality of Jeceaba, 100 km from Belo Horizonte in the Brazilian state of Minas Gerais, the R$3.2 billion, 2.5 million m² steel complex was announced in 2007 and inaugurated on September 1, 2011 by Brazilian President Dilma Rousseff.[3][4]

The Jeceaba plant is equipped with a Tenova electric arc furnace[5] and has the capacity to produce 1 million tons of crude steel annually.[3] The plant's seamless pipe production capacity is listed at 600,000 tpa.[6]

In 2018, plant owner Vallourec moved its blast furnace operations from Belo Horizonte to Jeceaba, giving the Jeceaba plant the additional capacity to produce up to 300,000 tpa of pig iron.[7] Other facilities at the plant include a continuous caster, ladle furnace and seamless tube mill supplied by Germany's SMS Group GmbH.[8]

Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size Iron ore source
Operating[9] 2011[10][11][12] 2500[12][13][14] Pau Branco mine, Serra da Moeda, Brumadinho, MG, Brazil[15]
Operating[9] 2011[10][11][12] 2500[12][13][14] Pau Branco mine, Serra da Moeda, Brumadinho, MG, Brazil[15]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Vallourec SA [99.6%]; other [0.4%] 4295867374 [99.6%]; unknown [0.4%] E100000130697 [99.6%]; E100000001753 [0.4%] Vallourec Solucoes Tubulares do Brasil SA[11] 5001083353 E100000130951

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Main production equipment Detailed production equipment
finished rolled[11] seamless steel pipes[11] energy[11] yes[16] yes[16] BF, EAF[12][17][18] 1 pelletizing plant; 1 Tenova Consteel® EAF (1976)[12][19][20][21][22][23][18][24]
finished rolled[11] seamless steel pipes[11] energy[11] yes[16] yes[16] BF, EAF[12][17][18] 1 pelletizing plant; 1 Tenova Consteel® EAF (1976)[12][19][20][21][22][23][18][24]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 1000 TTPA[25][12][26] 1000 TTPA[25][12][26]
cancelled [25][12][26] [25][12][26]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
operating 350 TTPA[27][28] 350 TTPA[27][28]
cancelled 500 TTPA[27][28] 500 TTPA[27][28]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Pellets
>0 TTPA[18]
>0 TTPA[18]

Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year EAF Production Total (all routes)
2020 588 TTPA[29] 588 TTPA[29]
2021 710 TTPA[17] 710 TTPA[17]
2022 776 TTPA[30] 776 TTPA[30]

Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year BF Production Total (all routes)
2020 343 TTPA[31] 343 TTPA[31]
2021 320 TTPA[32] 320 TTPA[32]
2022 291 TTPA[28] 291 TTPA[28]

Blast Furnace Details

Table 9: Blast Furnace Details

Unit name Status Announced date Construction date Start date Furnace manufacturer and model Current size Current capacity (ttpa) Decarbonization technology Most recent relining
1 cancelled[12][22][23][18][33] unknown unknown unknown Paul Wurth Paul Wurth Modern Blast Furnace Design[33][34][35] 350 m³[33] 500[27] unknown unknown
2 operating[36][19][20][21][22][23][18][33][37] unknown unknown 2014-07[12][19][20][21][22][23][18][33][37][33] Paul Wurth Paul Wurth Modern Blast Furnace Design[33][34][35] 350 m³[33] 350[28] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "VSB anuncia reestruturação com reflexos diretos na usina de Jeceaba". Câmara Municipal de Congonhas. March 27, 2018.{{cite web}}: CS1 maint: url-status (link)
  2. "Our units: Vallourec Soluções Tubulares do Brasil". Vallourec. Retrieved 2022-02-09.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 "Vallourec investe R$ 3,2 bilhões em Jeceaba". O Tempo Economia. April 24, 2007.
  4. "Inauguração de complexo siderúrgico reúne autoridades em Minas". Assembleia de Minas. September 1, 2011.{{cite web}}: CS1 maint: url-status (link)
  5. "2022 AIST Electric Arc Furnace Roundup". AIST (Association for Iron & Steel Technology). Retrieved 2020-09-14.{{cite web}}: CS1 maint: url-status (link)
  6. "Enhancement of Strategic Partnership with Vallourec" (PDF). Nippon Steel & Sumitomo Metal. February 1, 2016.{{cite web}}: CS1 maint: url-status (link)
  7. "Alto-forno da VSB já está funcionando". Câmara Municipal de Congonhas. March 26, 2018.{{cite web}}: CS1 maint: url-status (link)
  8. "Vallourec & Sumitomo Tubos do Brasil (VSB)". SMS group GmbH. Retrieved 2020-07-30.{{cite web}}: CS1 maint: url-status (link)
  9. 9.0 9.1 https://web.archive.org/web/20240111011348/https://brazil.vallourec.com/en/. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://www.vallourec.com/en/Components/News/News_BR/2021/2021092515-10years-JECEABA. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 https://web.archive.org/web/20211027104504/https://www.vallourec.com/en/brazil/about-us. Archived from the original on 27 October 2021. {{cite web}}: Missing or empty |title= (help)
  12. 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 (PDF) https://web.archive.org/web/20220318085237/https://www.aist.org/AIST/aist/AIST/Technology_Committees/Electric_Steelmaking/Agenda_RSVP/2014_EAF_Brazil_StudyTour.pdf. Archived from the original (PDF) on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 https://web.archive.org/web/20220205181229/https://g1.globo.com/minas-gerais/noticia/2016/02/vallourec-deve-transferir-producao-de-ferro-gusa-e-aco-de-bh-para-jeceaba.html. Archived from the original on 05 February 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  14. 14.0 14.1 (PDF) https://web.archive.org/web/20220318092837/https://www.sec.ufv.br/wp-content/uploads/2014/07/Nathalia-Lopes.pdf. Archived from the original (PDF) on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 https://web.archive.org/web/20220108143418/https://diariodocomercio.com.br/economia/vallourec-investira-r-220-milhoes/. Archived from the original on 08 January 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  16. 16.0 16.1 16.2 16.3 (PDF) https://web.archive.org/web/20240110022514/https://www.vallourec.com/app/uploads/2023/04/2022-Vallourec-Registration-Document_EN.pdf. Archived from the original (PDF) on 10 January 2024. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 17.2 17.3 (PDF) https://web.archive.org/web/20220625100836/https://acobrasil.org.br/site/wp-content/uploads/2022/05/AcoBrasil_Mini_anuario_2022.pdf. Archived from the original (PDF) on 25 June 2022. {{cite web}}: Missing or empty |title= (help)
  18. 18.0 18.1 18.2 18.3 18.4 18.5 18.6 18.7 18.8 https://web.archive.org/web/20220522173014/https://www.vallourec.com/en/investors/financial-results/registration-documents-archives. Archived from the original on 22 May 2022. {{cite web}}: Missing or empty |title= (help)
  19. 19.0 19.1 19.2 19.3 https://web.archive.org/web/20220119215734/https://www.congonhas.mg.leg.br/institucional/noticias/alto-forno-da-vsb-ja-esta-funcionando. Archived from the original on 19 January 2022. {{cite web}}: Missing or empty |title= (help)
  20. 20.0 20.1 20.2 20.3 https://web.archive.org/web/20220613081439/https://www.ge.com/digital/blog/vallourec-optimizes-energy-consumption-data-science. Archived from the original on 13 June 2022. {{cite web}}: Missing or empty |title= (help)
  21. 21.0 21.1 21.2 21.3 https://web.archive.org/web/20220320120702/https://www.vallourec.com/en/all-news/group-brazil-vallourec-florestal. Archived from the original on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  22. 22.0 22.1 22.2 22.3 22.4 https://web.archive.org/web/20220318151821/https://ibram.org.br/noticia/alto-forno-em-jeceaba/. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  23. 23.0 23.1 23.2 23.3 23.4 https://abmproceedings.com.br/en/article/processo-de-desfosforao-no-consteelr-da-vallourec-sumitomo-tubos-do-brasil. {{cite web}}: Missing or empty |title= (help)
  24. 24.0 24.1 AIST Electric Arc Furnace Roundup https://abmproceedings.com.br/ptbr/article/o-inicio-de-operacao-do-alto-forno-2-da-vsb2022 AIST Electric Arc Furnace Roundup. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  25. 25.0 25.1 25.2 25.3 https://abmproceedings.com.br/en/article/download-pdf/partida-da-aciaria-vsb-o-primeiro-fea-consteel-no-brasil-1. {{cite web}}: Missing or empty |title= (help)
  26. 26.0 26.1 26.2 26.3 (PDF) https://web.archive.org/web/20220121194842/https://acobrasil.org.br/site/wp-content/uploads/2019/10/LIVRO_ACO_BX.pdf. Archived from the original (PDF) on 21 January 2022. {{cite web}}: Missing or empty |title= (help)
  27. 27.0 27.1 27.2 27.3 27.4 https://web.archive.org/web/20220318151821/https://ibram.org.br/noticia/alto-forno-em-jeceaba/. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  28. 28.0 28.1 28.2 28.3 28.4 28.5 28.6 (PDF) https://web.archive.org/web/20230810145552/https://acobrasil.org.br/site/wp-content/uploads/2023/07/AcoBrasil_Anuario_2023.pdf. Archived from the original (PDF) on 10 August 2023. {{cite web}}: Missing or empty |title= (help)
  29. 29.0 29.1 (PDF) https://web.archive.org/web/20220120225956/https://acobrasil.org.br/site/wp-content/uploads/2021/06/Mini_anuario_2021_AcoBrasil-1.pdf. Archived from the original (PDF) on 20 January 2022. {{cite web}}: Missing or empty |title= (help)
  30. 30.0 30.1 (PDF) https://web.archive.org/web/20240119051040/https://acobrasil.org.br/site/wp-content/uploads/2023/06/AcoBrasil_Minianuario_2023.pdf. Archived from the original (PDF) on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  31. 31.0 31.1 (PDF) https://web.archive.org/web/20220120203349/https://acobrasil.org.br/site/wp-content/uploads/2021/07/Anuario_Completo_2021.pdf. Archived from the original (PDF) on 20 January 2022. {{cite web}}: Missing or empty |title= (help)
  32. 32.0 32.1 (PDF) https://web.archive.org/web/20220722190457/https://acobrasil.org.br/site/wp-content/uploads/2022/07/AcoBrasil_Anuario_2022.pdf. Archived from the original (PDF) on 22 July 2022. {{cite web}}: Missing or empty |title= (help)
  33. 33.0 33.1 33.2 33.3 33.4 33.5 33.6 33.7 https://web.archive.org/web/20220319014121/https://abmproceedings.com.br/ptbr/article/o-inicio-de-operacao-do-alto-forno-2-da-vsb. Archived from the original on 19 March 2022. {{cite web}}: Missing or empty |title= (help)
  34. 34.0 34.1 (PDF) https://web.archive.org/web/20220929093913/https://www.paulwurth.com/wp-content/uploads/2020/08/Brochure-Refractory-and-Engineering-Hot-Blast-Stoves-en.pdf. Archived from the original (PDF) on 29 September 2022. {{cite web}}: Missing or empty |title= (help)
  35. 35.0 35.1 https://web.archive.org/web/20221203223426/https://www.paulwurth.com/en/technology/blast-furnace-ironmaking/modern-blast-furnace-design/. Archived from the original on 03 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  36. (PDF) https://www.vallourec.com/app/uploads/2023/09/2022-Vallourec-Registration-Document_EN.pdf. {{cite web}}: Missing or empty |title= (help)
  37. 37.0 37.1 "2022 AIST Electric Arc Furnace Roundup". Association for Iron & Steel Technology. January 2022. {{cite magazine}}: Cite magazine requires |magazine= (help)

Resources