Vedanta Sesa Goa Pig Iron Plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Vedanta Sesa Goa Pig Iron Plant, also known as Sesa Goa plant (formerly), is a steel plant in Amona, North Goa, Goa, India that operates blast furnace (BF) technology.
Location
The map below shows the exact location of the plant in Amona, North Goa, Goa, India:
- Location: Amona, Goa, India
- Coordinates (WGS 84): 15.526866, 73.986671 (exact)
Background
Vedanta Sesa Goa Pig Iron Division is the largest merchant producer of Pig Iron in India with production capacity of 80,000 tons per month. the pig iron division (PID) started operating in 1992. It was the first to introduce low phosphorous foundry-grade pig iron in India. The PID has three blast furnaces, making SESA’s PID the largest producer of low phosphorous pig iron in India with an installed capacity of 950 thousand tonnes per annum (ttpa). The company also commissioned an 800 ttpa sintering facility that would enable the PID to partially meet its iron ore requirement with sintered iron ore fines, resulting in significant cost savings and increasing efficiencies.[1]
Plant Details
Table 1: General Plant Details
Start date | Power source | Iron ore source | Coal source |
---|---|---|---|
1992[2] | 60 MW Captive Power Plant[3] | Sesa Goa Iron Ore[3] | unknown |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Vedanta Ltd | 4295872982 | E100001000479 | Vedanta Iron and Steel Ltd[2] | 5086859493 | E100001012389 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | Main production equipment |
---|---|---|---|
crude[2] | pig iron[2] | yes[4] | BF |
Table 4: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
operating | 1000[5] | 1000[5] |
Table 5: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter | Coke |
---|---|
800[2] | 522[6] |
Table 6: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | BF production | Other/unknown iron production | Total (all routes) |
---|---|---|---|
2019 | unknown | unknown | – |
2020 | unknown | unknown | – |
2021 | unknown | unknown | – |
2022 | 682[7] | –[7] | 682[7] |
2023 | 831[7] | –[7] | 831[7] |
Unit Details
Table 7: Blast Furnace Details
Unit name | Status | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|
BF 1 | operating[2] | 1992[4] | 173.0 m3[8] | 175[5] | unknown | 2022[9] |
BF 2 | operating[2] | 1994[4] | 173.0 m3[8] | 175[5] | unknown | 2022[9] |
BF 3 | operating[2] | 2012[8] | 618.0 m3[8][10] | 650[5] | unknown | 2020-12[11] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Basic, Steel, SG & Nodular Grade Pig Iron Manufacturer & Supplier in India". sesagoaironore.com. Retrieved 2025-01-24.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20240207193717/https://sesagoaironore.com/pig-iron/. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20240207194731/https://energy.greenbusinesscentre.com/energyawards/enepresent22/metal/Vedanta%2520Limited%2520Goa.pdf. Archived from the original (PDF) on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240207194634/https://sesagoaironore.com/about-sesa/history-milestone/. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 (PDF) https://web.archive.org/web/20240217015259/https://sesagoaironore.com/pdf/certification/1st-Six-Monthly-EC-Compliance-Report.pdf. Archived from the original (PDF) on 2024-02-17.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207194540/https://sesagoaironore.com/met-coke/. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 (PDF) https://www.vedantalimited.com/uploads/investor-overview/annual-report/Vedanta-Limited-Integrated-Report-FY24.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 https://web.archive.org/web/20240207195129/https://www.steelonthenet.com/directory/pig-iron/sesa-goa.html. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 (PDF) https://environmentclearance.nic.in/writereaddata/Form-1A/Minutes/2508202157418993FinalMOM42EAC12-13AUG2021.pdf https://www.vedantalimited.com/uploads/investor-overview/annual-report/Vedanta-Limited-Integrated-Annual-Report-202022-23-VF.pdf, https://environmentclearance.nic.in/writereaddata/Form-1A/Minutes/2508202157418993FinalMOM42EAC12-13AUG2021.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://www.seetao.com/details/23711.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.seetao.com/details/23711.html https://www.youtube.com/watch?v=pvHzS--H4Zg&ab_channel=MCKKuttyEngineersPvtLtd, https://www.seetao.com/details/23711.html.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)