Villar de Arnedo–Navarra Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Villar de Arnedo–Navarra Gas Pipeline is an operating gas pipeline in Spain.[1]
Location
The pipeline starts in Villar De Arnedo, Spain, and runs to Navarra, Spain.[2][3]
Project Details
- Parent company: Enagás[2][3]
- Capacity:
- Length: 65.4 km / 40.7 mi[4]
- Diameter:
- Status: Operating[1]
- Start Year:
- Corresponding SciGrid name(s): VillarDeArnedo_Navarra[1]
Resources and articles
References
- ↑ 1.0 1.1 1.2 Diettrich, J.C.; Pluta, A.; Medrjoubi, W. (July 23, 2020). "The combined IGG gas transmission network data set". SciGRID_gas. Retrieved September 2, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 Enagas. "Transmission, storage and regasification services and infrastructure" (PDF). Enagas.es. Retrieved January 22, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 Spain’s gas demand grows 11.6% in May, driven by industry, Gas to Power Journal, 1 June 2018 (accessed Jan 28, 2021)
- ↑ TYNDP 2020 - MAP – Transmission, ENTSOG, October 2020; length calculated by Global Energy Monitor