Welspun Metallics Anjar Steel plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Welspun Anjar Steel plant, also known as WSL, is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Anjar, Gujarat, India.
Location
The map below shows the exact location of the plant in Anjar, Gujarat, India:
- Location: Survey No.650, P.O - Versamedi, Tal.Anjar, District Kutch, Gujarat 370 110, India
- Coordinates (WGS 84): 23.112781, 70.0866885 (exact)
Background
The Welspun Anjar Steel plant began operating in 2004.
In 2016, the Welspun Group received a Rs 50,000 fine after they placed a pipeline discharging waste into a local river, among other environmental violations. The incident was reported by local fishermen who were unable to fish after the pipeline was moved.[1]
In 2017, the Welspun Group received an environmental compliance approval from the local ministry on environment for its first expansion project of 3100 ttpa, which is expected to cost Rs 14,690 crore.[2][3] The project was expected to get completed in 36 to 48 months.[4] In a 2022 Half Yearly Compliance report, one of the basic oxygen furnace units out of the two proposed 165 tonne units was cancelled.[5]
Another expansion project for 3300 is currently in the pipeline; both expansion projects are expected to be completed in 2030.[6] As of December 2023. there are no updates on this project.
In 2021, JSW Steel bought the Welspun Group's steel plates and coil mills business for Rs 848 crore.[7][8]
On 27 July, 2022, Welspun announced the commissioning of a blast furnace of capacity 500 ttpa at the Anjar plant.[9]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Start date | Power source | Iron ore source | Coal source |
---|---|---|---|---|---|---|
Main plant | Operating[10] | – | 2004[11] | 12 MW captive power plant powered by waste heat recovery boilers[11] | – | Imported from South Africa and Indonesia |
Expansion | Announced[12] | – | 2030[12] | – | – | – |
Expansion | Operating[13] | 2020[14] | 2022[13] | – | – | – |
Expansion | Announced[12] | 2015[15] | 2030[12] | 200 MW Captive power plant[16] | Imported from South Africa, Australia, Brazil; Domestic[17] | Imported from Australia, South Africa |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Main plant | Welspun Group [100.0%] | 5000835262 [100%] | E100000121541 [100%] | Welspun Steel Ltd[11] | 5000013766 | E100000130905 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
Main plant | crude; semi-finished[11] | TMT rebars; ingots; billets; DRI; DI pipes[11] | building and infrastructure[11] | Yes[18] | DRI, other[11][19][20] | DRI plant (4x100TPD; coal-based rotary kiln); 2 IF (45t each)[11][19][21][20][16] |
Expansion | crude; semi-finished[11] | TMT rebars; ingots; billets; DRI[11] | building and infrastructure[11] | – | BOF[12] | BOF[12] |
Expansion | crude; semi-finished[11] | TMT rebars; ingots; billets; DRI; DI pipes[11] | building and infrastructure[11] | – | BF[13] | BF; sinter plant; coke ovens[13] |
Expansion | crude; semi-finished[11] | TMT rebars; ingots; billets; DRI[11] | building and infrastructure[11] | – | BF, BOF[22] | BF (4300 m3); 1 BOF (165 ton)[12][17][23] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | 288 TTPA |
Expansion | announced | 3300 TTPA[12] | 3300 TTPA[12] |
Expansion | operating | – | – |
Expansion | announced | 3100 TTPA[12] | 3100 TTPA[12] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|---|
Main plant | operating | – | 144 TTPA[11][24] | 144 TTPA[11][24] |
Expansion | announced | – | – | – |
Expansion | operating | 500 TTPA[13][25] | – | 500 TTPA[13][25] |
Expansion | announced | 3340 TTPA[17] | – | 3340 TTPA[17] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Sinter | Coke |
---|---|---|
Main plant | – | – |
Expansion | – | – |
Expansion | >0 TTPA[13] | 210 TTPA[13][26] |
Expansion | 5280 TTPA[17] | 1370 TTPA[17] |
Blast Furnace Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Furnace manufacturer and model | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
1 | operating[13] | 2020[14] | unknown | 2022-10-04[13][25] | Saint-Gobain (parts)[27] | 5 meters (hearth diameter)[28] | 500[13][25] | unknown | unknown |
unknown | announced[17] | 2016[17] | unknown | 2030[12] | – | 4300 m³[17] | 3340[17] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "Green norms violation: NGT imposes fine of Rs 50K each on Gujarat govt, Centre, Welspun". The Indian Express. 2016-12-14. Retrieved 2022-02-27.
- ↑ "Ministry of Environment, Forest, and Climate Change Letter" (PDF). Welspun. 2017-02-28. Retrieved 2022-02-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Welspun Steel gets green nod for Rs 14,690-crore Gujarat project". Economic Times. 2017-03-12. Retrieved 2022-02-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ PTI (2017-03-12). "Welspun Steel gets green nod for Rs14,690-crore Gujarat project". mint. Retrieved 2023-12-15.
- ↑ "EC Compliance Report" (PDF). Welspun Corp. 30 November, 2022. Retrieved 15 December, 2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ "Latest Developments in Steelmaking Capacity" (PDF). OECD. 2021. Retrieved 2022-02-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "JSW Steel acquires Welspun's steel biz for ₹848 cr". Business Line. 2021-04-01. Retrieved 2022-02-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "JSW Steel completes purchase of Welspun unit". VCCircle. Retrieved 2023-12-15.
- ↑ "Welspun Corp announces the commissioning of a Blast furnace in Gujarat". Manufacturing today India. 27 July, 2022. Retrieved 12 October, 2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20220926122357/http://welspunsteel.com/content.asp?Submenu=Y&MenuID=1&SubmenuID=1. Archived from the original on 26 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 11.16 11.17 11.18 https://web.archive.org/web/20211230231705/http://welspunsteel.com/. Archived from the original on 30 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 https://web.archive.org/web/20220727165133/https://www.manufacturingtodayindia.com/sectors/welspun-corp-announces-the-commissioning-of-a-blast-furnace-in-gujarat. Archived from the original on 27 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 https://web.archive.org/web/20240110024855/https://www.welspuncorp.com/about-us.php. Archived from the original on 10 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240110024620/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=%2FT00MqEKHUzeSoOqLpjswHdnWyx7jNfAHUyRlhFe8QbF962DtJ9BgjzCsaxZ%2FDlp3x6e6iPLtg8s9nlE92b9SP2EjSebnnx+xHyXCtvvLJe0iqRdN%2FbQdWFv7bAvkCQJbufeY+JfU1LD6LvM4yrNaHGikspoXRVT4jrX%2Fdtn1NvvYjPW9UW1e0EIot9X1FWa&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%2FpgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==. Archived from the original on 10 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 https://energy.economictimes.indiatimes.com/news/power/welspun-steel-ltd-gets-green-nod-for-rs-14690-crore-gujarat-project/57606130.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 17.4 17.5 17.6 17.7 17.8 17.9 https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=G4W3qgkX6Ivtp6uvibel0ThQGLNSW4SULIzw5SzEKmvpqJjo0Xn4V1xeqHfgTzEVinX9yTV4TGNhWh5Fi6G0tOOfFfXhDuwbagbvqbzT3MjBcpPqxDIWgW/bYZknMDaN&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzUeqEISsDpNmaozay3MPM7v.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.welspuncorp.com/products-and-services.php#carbon-steel-line-pipes.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 https://web.archive.org/web/20240125061127/https://www.welspun.com/404.php. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 https://spongeiron.in/welspun.php.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220326060904/http://spongeironindia.com/members.php. Archived from the original on 26 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (DRI) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdfintegrated (DRI).
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ (PDF) https://www.welspuncorp.com/uploads/investor_data/investorreport__857.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 24.0 24.1 (PDF) https://www.careratings.com/upload/CompanyFiles/PR/24012023075720_Welspun_Steel_Limited.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 25.0 25.1 25.2 25.3 https://www.constructionweekonline.in/projects-tenders/welspun-corp-inaugurates-steel-plant-in-anjar-gujarat.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.business-standard.com/article/news-cm/welspun-corp-commissions-coke-oven-plant-at-anjar-gujarat-122122600124_1.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20221128015619/https://www.ceramicsrefractories.saint-gobain.com/sites/hps-mac3-cma-pcr/files/assetbank_media/Iron---Steel-Blast-Furnace-brochure-2022-web-2274441.pdf. Archived from the original (PDF) on 28 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://docs.google.com/spreadsheets/d/105gLwc8BW_avW8y8MDt7P-6ivpigNzZlvMtilA8_G08/edit#gid=0&fvid=624772085.
{{cite web}}
: Missing or empty|title=
(help)