Welspun Metallics Anjar Steel plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Welspun Metallics Anjar Steel plant, also known as WSL, is a steel plant in Anjar, Versamedi, Kachchh, Gujarat, India that operates ironmaking, steelmaking, blast furnace (BF), basic oxygen furnace (BOF), and direct reduced iron (DRI) technology.
Location
The map below shows the exact location of the plant in Anjar, Versamedi, Kachchh, Gujarat, India:
- Location: Survey No.650, P.O - Versamedi, Tal.Anjar, District Kutch, Gujarat 370 110, India
- Coordinates (WGS 84): 23.112781, 70.0866885 (exact)
Background
The Welspun Anjar Steel plant began operating in 2004.
In 2016, the Welspun Group received a Rs 50,000 fine after they placed a pipeline discharging waste into a local river, among other environmental violations. The incident was reported by local fishermen who were unable to fish after the pipeline was moved.[1]
In 2017, the Welspun Group received an environmental compliance approval from the local ministry on environment for its first expansion project of 3100 ttpa, which is expected to cost Rs 14,690 crore.[2][3] The project was expected to get completed in 36 to 48 months.[4] In a 2022 Half Yearly Compliance report, one of the basic oxygen furnace units out of the two proposed 165 tonne units was cancelled.[5]
Another expansion project for 3300 is currently in the pipeline; both expansion projects are expected to be completed in 2030.[6] As of December 2023. there are no updates on this project.
In 2021, JSW Steel bought the Welspun Group's steel plates and coil mills business for Rs 848 crore.[7][8]
On 27 July, 2022, Welspun announced the commissioning of a blast furnace of capacity 500 ttpa at the Anjar plant.[9]
As of January 2025, there hasn't been any update on the expansion project.
Plant Details
Table 1: General Plant Details
Start date | Workforce size | Power source | Iron ore source | Coal source |
---|---|---|---|---|
2004[10] | 2000[11] | 12 MW captive power plant powered by waste heat recovery boilers; 2x100MW gas-based CPP planned as part pf 3 mtpa expansion plan[10][12] | Imported (South Africa, Australia, Brazil)/ Domestic[12] | Imported from South Africa, Indonesia, Australia[13][12] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Welspun Corp Ltd | 4295873411 | E100002007597 | Welspun Corp Ltd[14] | 4295873411 | E100002007597 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment |
---|---|---|---|---|---|
crude, semi-finished[10] | ingot, rebar, di pipe, billet, DRI[10] | building and infrastructure[10] | yes[15] | unknown | BF; DRI; BOF; Iron other/unspecified; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
announced | 4850[16][12] | – | 4850[16][12] |
cancelled | 1550[12] | – | 1550[12] |
operating | – | 288[17] | 288[17] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Sponge iron/DRI capacity | Other/unspecified iron capacity | Nominal iron capacity (total) |
---|---|---|---|---|
announced | 3340[12] | – | 0 | 3340[12] |
operating | 500[18][19] | 144[20][10] | – | 644[18][10][20][19] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel | Sinter | Coke | Pellets |
---|---|---|---|
NF | 5280[21] | 1370[21] | NF |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | Other/unknown steel production |
---|---|
2019 | unknown |
2020 | unknown |
2021 | unknown |
2022 | unknown |
2023 | unknown |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | BF production | DRI production | Other/unknown iron production |
---|---|---|---|
2019 | – | unknown | unknown |
2020 | – | unknown | unknown |
2021 | – | unknown | unknown |
2022 | unknown | unknown | unknown |
2023 | unknown | unknown | unknown |
Unit Details
Table 9: Blast Furnace Details
Unit name | Status | Announced date | Start date | Furnace manufacturer and model | Current size | Current capacity (ttpa) | Decarbonization technology |
---|---|---|---|---|---|---|---|
BF 1 | operating[19] | 2020[22] | 2022[18][19] | Saint-Gobain (parts)[23] | –[24] | 500[18][19] | unknown |
unknown BF (1) | announced[12] | 2016[12] | 2030[25] | – | 4300.0 m3[12] | 3340[12] | unknown |
Table 10: Direct Reduced Iron Furnace Details
Unit name | Status | Start date | Furnace manufacturer and model | Furnace type | Current capacity (ttpa) | Reductant |
---|---|---|---|---|---|---|
unknown DRI (1) | operating[26] | 2005[27] | Lloyds Engineering[28] | rotary kiln[28] | 36[10][20] | coal[29] |
unknown DRI (2) | operating[26] | 2005[27] | Lloyds Engineering[28] | rotary kiln[28] | 36[10][20] | coal[29] |
unknown DRI (3) | operating[26] | 2005[27] | Lloyds Engineering[28] | rotary kiln[28] | 36[10][20] | coal[29] |
unknown DRI (4) | operating[26] | 2005[27] | Lloyds Engineering[28] | rotary kiln[28] | 36[10][20] | coal[29] |
Table 11: Basic Oxygen Furnace Details
Unit name | Status | Announced date | Start date | Current capacity (ttpa) | Current size |
---|---|---|---|---|---|
unknown BOF (1) | announced[12] | 2016[12] | 2030[16] | 1550[12] | 165.0 tonnes[25][21][12] |
unknown BOF (2) | cancelled[21] | 2016[12] | 2030[16] | 1550[12] | 165.0 tonnes[30][31][32][12] |
unknown BOF (3) | announced[16] | 2022[16] | 2030[16] | 3300[16] | – |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Green norms violation: NGT imposes fine of Rs 50K each on Gujarat govt, Centre, Welspun". The Indian Express. 2016-12-14. Retrieved 2022-02-27.
- ↑ "Ministry of Environment, Forest, and Climate Change Letter" (PDF). Welspun. 2017-02-28. Retrieved 2022-02-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Welspun Steel gets green nod for Rs 14,690-crore Gujarat project". Economic Times. 2017-03-12. Retrieved 2022-02-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ PTI (2017-03-12). "Welspun Steel gets green nod for Rs14,690-crore Gujarat project". mint. Retrieved 2023-12-15.
- ↑ "EC Compliance Report" (PDF). Welspun Corp. 30 November, 2022. Retrieved 15 December, 2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ "Latest Developments in Steelmaking Capacity" (PDF). OECD. 2021. Retrieved 2022-02-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "JSW Steel acquires Welspun's steel biz for ₹848 cr". Business Line. 2021-04-01. Retrieved 2022-02-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "JSW Steel completes purchase of Welspun unit". VCCircle. Retrieved 2023-12-15.
- ↑ "Welspun Corp announces the commissioning of a Blast furnace in Gujarat". Manufacturing today India. 27 July, 2022. Retrieved 12 October, 2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 https://web.archive.org/web/20211230231705/http://welspunsteel.com/. Archived from the original on 2021-12-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.livemint.com/companies/news/welspun-metallics-launches-rs-2000-crore-manufacturing-facility-in-gujarat-11664880567996.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 12.14 12.15 12.16 12.17 12.18 12.19 https://web.archive.org/web/20240806152513/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=G4W3qgkX6Ivtp6uvibel0ThQGLNSW4SULIzw5SzEKmvpqJjo0Xn4V1xeqHfgTzEVinX9yTV4TGNhWh5Fi6G0tOOfFfXhDuwbagbvqbzT3MjBcpPqxDIWgW%252FbYZknMDaN&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%252FpgnoBhDlYdZCxzUeqEISsDpNmaozay3MPM7v. Archived from the original on 2024-08-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240906183701/https://spongeiron.in/welspun.php. Archived from the original on 2024-09-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.welspuncorp.com/uploads/investor_data/investorreport_Financial%20year%202023%20-%202024_1314.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240111035623/https://www.welspuncorp.com/products-and-services.php. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 16.4 16.5 16.6 16.7 (PDF) https://web.archive.org/web/20240111014948/https://web-archive.oecd.org/2022-12-16/648714-latest-developments-in-steelmaking-capacity-2022.pdf. Archived from the original (PDF) on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 (PDF) https://web.archive.org/web/20220127093133/https://www.careratings.com/upload/CompanyFiles/PR/30032021045656_Welspun_Steel_Limited.pdf. Archived from the original (PDF) on 2022-01-27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 18.3 https://web.archive.org/web/20240912170655/https://www.constructionweekonline.in/projects-tenders/welspun-corp-inaugurates-steel-plant-in-anjar-gujarat. Archived from the original on 2024-09-12.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 https://web.archive.org/web/20220727165133/https://www.manufacturingtodayindia.com/sectors/welspun-corp-announces-the-commissioning-of-a-blast-furnace-in-gujarat. Archived from the original on 2022-07-27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 20.3 20.4 20.5 (PDF) https://web.archive.org/web/20240927165608/https://www.careratings.com/upload/CompanyFiles/PR/24012023075720_Welspun_Steel_Limited.pdf. Archived from the original (PDF) on 2024-09-27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 21.2 21.3 (PDF) https://web.archive.org/web/20240913180040/https://www.welspuncorp.com/uploads/investor_data/investorreport__857.pdf. Archived from the original (PDF) on 2024-09-13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240110024855/https://www.welspuncorp.com/about-us.php. Archived from the original on 2024-01-10.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20221128015619/https://www.ceramicsrefractories.saint-gobain.com/sites/hps-mac3-cma-pcr/files/assetbank_media/Iron---Steel-Blast-Furnace-brochure-2022-web-2274441.pdf. Archived from the original (PDF) on 2022-11-28.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240111085633/https://docs.google.com/spreadsheets/d/105gLwc8BW_avW8y8MDt7P-6ivpigNzZlvMtilA8_G08/edit. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 25.0 25.1 (PDF) https://web.archive.org/web/20230410190908/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf (PDF).
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 26.0 26.1 26.2 26.3 https://web.archive.org/web/20240911002001/https://www.indiainfoline.com/news/markets/welspun-corp-commissions-new-plant-at-anjar-gujarat-stock-sheds-1. Archived from the original on 2024-09-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 27.0 27.1 27.2 27.3 https://www.slideshare.net/slideshow/WELSPUN-FULL-PRESENTATION/742967.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 28.0 28.1 28.2 28.3 28.4 28.5 28.6 28.7 https://web.archive.org/web/20220326060904/http://spongeironindia.com/members.php.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 29.0 29.1 29.2 29.3 https://web.archive.org/web/20230922105941/https://spongeiron.in/welspun.php. Archived from the original on 2023-09-22.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20210929032946/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf (PDF).
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220111171832/https://www.daily-sun.com/post/227737/Star-Consortium-KISC-to-setup-steel-plant-at-Mirersharai. Archived from the original on 2022-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220112121226/https://starconsortiumbd.com/project_bci.php. Archived from the original on 2022-01-12.
{{cite web}}
: Missing or empty|title=
(help)