Wuyang Iron and Steel Co Ltd (舞阳钢铁有限责任公司) is a basic oxygen furnace (BOF) and electric arc furnace (EAF) steel plant operating in Anyang, Henan, China.

Location

The map below shows the exact location of the plant in Anyang, Henan, China:

Loading map...
  • Location: West Section of Hubin Avenue, Wugang City, Henan Province
  • Coordinates (WGS 84): 33.287536, 113.474328 (exact)

Background

Wuyang Iron and Steel Company is located adjacent to Wugang Zhongjia Steel Co., Ltd. which serves as an essential source of steelmaking raw materials for Wuyang Iron and Steel Company.[1]

The facility has announced a thick slab continuous casting machine project in July 2024, which involves constructing a 460x2500mm straight-arc continuous casting machine. Utilizing continuous casting technology, the project will convert molten steel produced by existing electric arc furnaces into continuously cast slabs without increasing the company’s existing casting capacity of 1 million tons per year.[2]

Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size Power source
Operating[3] 1970[4] 8031[5] Wugang power station[6]

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Partial HBIS Group Co Ltd [53.1%]; China Baowu Steel Group Co Ltd [27.7%]; China Huarong Asset Management Co Ltd [8.3%]; HBIS Co Ltd [8.1%]; other [2.8%] 5000022648 [53.1%]; 5000039946 [27.7%]; unknown [8.3%]; unknown [8.1%]; unknown [2.8%] E100000126011 [53.1%]; E100001000472 [27.7%]; E100000123273 [8.3%]; E100000123542 [8.1%]; E100000001753 [2.8%] Wuyang Iron and Steel Co., Ltd.[3] 4297970274 E100000126121

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
finished rolled[7] wide and thick steel plate[7] BOF, EAF[8] 1 BF(1x1260m³); 1 BOF (120-tonne); 3 EAF (2x90-tonne, 1x100-tonne)[8][7]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Basic oxygen furnace steelmaking capacity Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 1600 TTPA[9] 4999 TTPA[10][9][10][9][10][9] 6599 TTPA[9][10][9][10][9][10][9]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
operating 1124 TTPA[8][7] 1124 TTPA[8][7]

Table 6: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year BOF Production Total (all routes)
2020 3222 TTPA[11] 3222 TTPA
2021
2022

Table 7: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year BF Production Total (all routes)
2020 1194 TTPA[11] 1194 TTPA
2021
2022

Blast Furnace Details

Table 8: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
1 operating[3] unknown unknown unknown 1260 m³[8][7] 1124[8][7] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "舞钢中加钢铁有限公司产能置换项目". 中宏网. 2021.
  2. "关于舞阳钢铁有限责任公司结构优化、绿色低碳转型项目—460mm厚板连铸机工程环境影响报告表的拟批准公示". 舞钢市人民政府. 2024-07-08.
  3. 3.0 3.1 3.2 https://web.archive.org/web/20220110214324/https://www.qcc.com/firm/3905b76be8077bc9031c501d8a8dd32b.html. Archived from the original on 10 January 2022. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20220113203226/http://en.wygt.cn/intro/1.html. Archived from the original on 13 January 2022. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240119090037/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20220124105316/https://www.gem.wiki/Wugang_power_station. Archived from the original on 24 January 2022. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 https://web.archive.org/web/20220114131305/http://www.wygt.cn/intro/1.html. Archived from the original on 14 January 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 (PDF) https://web.archive.org/web/20220224072927/http://www.gov.cn/zhengce/zhengceku/2021-05/07/5605092/files/4362a77483354513be0fc81be53a4a64.pdf. Archived from the original (PDF) on 24 February 2022. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 https://web.archive.org/web/20240309064125/https://www.wygcgt.com/about/jj/. Archived from the original on 09 March 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  11. 11.0 11.1 (PDF) https://web.archive.org/web/20220126190716/http://qxb-pdf-osscache.qixin.com/AnBaseinfo/b741065f3673822d22aeeeb520fb3ff2.pdf. Archived from the original (PDF) on 26 January 2022. {{cite web}}: Missing or empty |title= (help)

Resources