Xindia Steels Koppal plant is a steel plant in Koppal, Ginigera, Karnataka, India that operates blast furnace (BF), basic oxygen furnace (BOF), and direct reduced iron (DRI) technology.

Location

The map below shows the exact location of the plant in Koppal, Ginigera, Karnataka, India:

Loading map...
  • Location: Kunikere & Hirebaganal Village, Ginigera Post, Koppal Dist., Karnataka – 583 231, India
  • Coordinates (WGS 84): 15.293421, 76.234947 (exact)

Background

On 24 August, 2011, Xindia Steels Limited announced its plan to set up a steel plant in Koppal district of Karnataka, India. Xindia Steels Limited is promoted by two Chinese state-owned entities — Xinxing Cathay International Group  and China Minmetals Group, and Indian promoters - Kelchandra Group and Manasara Group. Xindia Steels plan to have a 5 mtpa facility at the location in three phases:[1]

  • Phase I: 0.8 million ton Pellet Plant + Tianjin DI pipe plant
  • Phase II: 2.5 mtpa Integrated Iron & Steel plant + cement plant
  • Phase III: 5 mtpa Steel Plant + 250 MW power + 6 million ton pellet plant[2]

According to OECD Latest developments in steelmaking capacity report 2024, the proect is expected to begin commissioning by 2029.[3]

Xindia Steels Limited has recently commissioned a 0.8 mtpa Iron Ore Pelletisation facility at the plant site. The project construction work for the second phase is to be taken up shortly.[4]

Plant Details

Table 1: General Plant Details

Announced date Start date Power source Iron ore source Coal source
2008-02-28[5] 2029[6] unknown unknown unknown

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
China Minmetals Corp [14.3%]; Kelachandra Group [14.3%]; Manasara Group [14.3%]; Shanxi HONGDA Iron and Steel Group Co Ltd [14.3%]; The Joinus Venture Capital Co Ltd [14.3%]; Xinxing Cathay International Group Co Ltd [14.3%]; McWane Inc 5000069311 [14.3%]; unknown [14.3%]; unknown [14.3%]; unknown [14.3%]; unknown [14.3%]; 5000013134 [14.3%]; 4296572465 E100000123999 [14.3%]; E100000131167 [14.3%]; E100000131170 [14.3%]; E100000123200 [14.3%]; E100000131150 [14.3%]; E100000130904 [14.3%]; E100000130782 Xindia Steels Ltd [100%][7] 5072815458 E100000131065 [100%]

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Main production equipment
crude, semi-finished, finished rolled[8] pipe, pig iron, pellets[8] unknown unknown BF; DRI; BOF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
announced 5000[8] 5000[8]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
announced 5000[8] 0[9] 5000[8][9]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Coke Pellets
NF NF 5200[8]

Unit Details

Table 7: Blast Furnace Details

Unit name Status Announced date Start date Current capacity (ttpa) Decarbonization technology
unknown BF (1) announced[8] 2011[10] 2029[6] 2500[8] unknown
unknown BF (2) announced[8] 2011[10] 2036[6] 2500[8] unknown

Table 8: Direct Reduced Iron Furnace Details

Unit name Status Furnace type Current capacity (ttpa) Reductant
unknown DRI (1) announced[8] rotary kiln[11] 0[9] coal[11]

Table 9: Basic Oxygen Furnace Details

Unit name Status Announced date Start date Current capacity (ttpa)
unknown BOF (1) announced[8] 2008[12] 2029[6] 2500[8]
unknown BOF (2) announced[8] 2029[6] 2500[8]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Xindia Steels to set up steel plant in State". Deccan Herald. 24 August, 2011. Retrieved 12 October, 2023. {{cite news}}: Check date values in: |access-date= and |date= (help)
  2. "Future Plans". Xindia Steels. Retrieved 12 October, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  3. "Latest developments in steelmaking capacity and outlook until 2026". OECD. 2024-06-12. Retrieved 2025-01-24.{{cite web}}: CS1 maint: url-status (link)
  4. "::: Xindia Steels". www.xindiasteels.com. Retrieved 2025-01-24.
  5. https://web.archive.org/web/20240111015518/https://newsonprojects.com/news/xindia-steel-to-invest-rs-8000-cr-on-iron-steel-plant. Archived from the original on 2024-01-11. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 (PDF) https://web.archive.org/web/20230410190908/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf (PDF). {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)
  7. https://web.archive.org/web/20220112161950/https://www.xindiasteels.com/about.html. Archived from the original on 2022-01-12. {{cite web}}: Missing or empty |title= (help)
  8. 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 https://web.archive.org/web/20200617225147/http://www.xindiasteels.com:80/futureplans.html. Archived from the original on 2020-06-17. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 (PDF) http://environmentclearance.nic.in/writereaddata/Online/TOR/0_0_06_Dec_2014_1235411801Annexure-Pre-feasibilityReport(PFR).pdf. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://www.deccanherald.com/content/186040/xindia-steels-set-up-steel.html. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 (PDF) https://web.archive.org/web/20240513202603/https://environmentclearance.nic.in/writereaddata/Online/TOR/0_0_06_Dec_2014_1235411801Annexure-Pre-feasibilityReport(PFR).pdf. Archived from the original (PDF) on 2024-05-13. {{cite web}}: Missing or empty |title= (help)
  12. https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=vpnVwtluWbphcuh+OwTh1NXmU++KClbzXRLo280oOG+38PFAIwDN6uq8gSkDxOlmEHJq/RN6UJ6fJ5ptHGHGUFs/+vfGse1EQE6AL6q+pFGBQ7ZS57Z60BUEfH4Cz8GPE8slo5kE9mAtXdF4FXZ1zg==&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==. {{cite web}}: Missing or empty |title= (help)

Resources