Yazdani Steel and Power Kalinganagar steel plant is a steel plant in Kalinganagar, Jajpur, Odisha, India that operates direct reduced iron (DRI) and steelmaking technology.

Location

The map below shows the exact location of the plant in Kalinganagar, Jajpur, Odisha, India:

Loading map...
  • Location: Kalinganagar, Jajpur, India
  • Coordinates (WGS 84): 20.928285, 86.036604 (exact)

Background

Yazdani Steel & Power Limited is a Public incorporated on 29 October 2003 as Dinabandhu Steel & Power Ltd.[1] The company was taken over by Yazdani International Pvt ltd in May 2011, subsequent to which it was renamed Yazdani Steel & Power Limited.[2] The plant plans to expand its capacity from 70 ttpa to 1190 ttpa with an investment of INR 2,415 crores.[3] The expansion plan was approved by Odisha Government in 2021.[4] As of 2025 December, there hasn't any updates.

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source Iron ore source Coal source
2003[5] 519[6] 10 MW CPP (4 MW WHRB; 6 MW AFBC; Proposed to expand to 70 MW CPP (2x8 MW WHRB and 2x22 MW AFBC))[6][7] Joda[6] Imported via Paradip port[6]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Serajuddin & Co 5001423902 E100001016270 Yazdani Steel and Power Ltd [100%][5] 5068656453 E100001012099 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Main production equipment
finished rolled[6] billet, bar[6] building and infrastructure[6] unknown unknown DRI; Steel other/unspecified

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Other/unspecified steelmaking capacity Nominal crude steel capacity (total)
announced 1080[8][6] 1080[8][6]
operating 110[6][7] 110[6][7]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
announced 256[6][7] 256[6][7]
operating 72[6][7] 72[6][7]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF NF NF NF

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year Other/unknown steel production
2020 unknown
2021 unknown
2022 unknown
2023 unknown

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year DRI production Other/unknown iron production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown unknown

Unit Details

Table 9: Direct Reduced Iron Furnace Details

Unit name Status Announced date Start date Furnace type Current capacity (ttpa) Reductant
unknown DRI (1) operating[5] 2003[5] rotary kiln[6] 36[6][7] coal[7]
unknown DRI (2) operating[5] 2003[5] rotary kiln[6] 36[6][7] coal[7]
unknown DRI (3) announced[7] 2018[9] rotary kiln[6] 128[6][7] coal[6][7]
unknown DRI (4) announced[7] 2018[9] rotary kiln[6] 128[6][7] coal[6][7]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Basic Information". Zauba Corp. 07 May, 2023. Retrieved 17 October, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  2. "Final EIA/EMP Report". MoEF&CC. July 2022. Retrieved 11 January 2024.{{cite web}}: CS1 maint: url-status (link)
  3. Cite error: Invalid <ref> tag; no text was provided for refs named :0
  4. Pioneer, The. "Odisha needs tactical initiatives to meet steel output target". The Pioneer. Retrieved 2024-12-05.
  5. 5.0 5.1 5.2 5.3 5.4 5.5 https://www.zaubacorp.com/company/YAZDANI-STEEL-POWER-LIMITED/U27102OR2003PLC007354. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 6.22 6.23 6.24 (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/22_Feb_2019_165624717BRW1Q5TEPre-FeasibilityReport.pdf. {{cite web}}: Missing or empty |title= (help)
  7. 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 https://web.archive.org/web/20240923212325/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=hH93gz76f6yPOaSbn7PCTae3e+oMkidNoi6mXyrVSa0FwEhThGNjQe9pFy0RJkLtShKTUWGq3+ovGAOhl6qKC67v1ebfghMnhf9J5UJtie4=&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%252FpgnoBhDlYdZCxzVPEh4a7F53Cae7tleKGoXIDiA7chYePNgRJpehWx3dLsaLaee8RS5VxBvVdCAnIMg=. Archived from the original on 23 September 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20210421081752/https://timesofindia.indiatimes.com/city/bhubaneswar/odisha-approves-8-investment-proposals-worth-rs-6400-crore/articleshow/80138282.cms. Archived from the original on 2021-04-21. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20240115055327/https://www.projectstoday.com/News/Yazdani-Steel--Power-awaits-clearance-to-augment-steel-capacity. Archived from the original on 2024-01-15. {{cite web}}: Missing or empty |title= (help)

Resources