Yazdani Steel and Power Kalinganagar steel plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Yazdani Steel and Power Kalinganagar steel plant is a direct reduced iron (DRI) steel plant operating in Kalinganagar, Odisha, India.
Location
The map below shows the exact location of the plant in Kalinganagar, Odisha, India:
- Location: Kalinganagar, Jajpur, India
- Coordinates (WGS 84): 20.928285, 86.036604 (exact)
Background
Yazdani Steel & Power Limited is a Public incorporated on 29 October 2003 as Dinabandhu Steel & Power Ltd.[1] The company was taken over by Yazdani International Pvt ltd in May 2011, subsequent to which it was renamed Yazdani Steel & Power Limited.[2] The plant plans to expand its capacity from 70 ttpa to 1190 ttpa with an investment of INR 2,415 crores.[3] The expansion plan was approved by Odisha Government in 2021.[4] As of 2025 December, there hasn't any updates.
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Workforce size | Power source |
---|---|---|---|---|---|---|
Main plant | Operating[5] | – | – | 2003[5] | – | 10 MW Captive Power Plant[6] |
Expansion | Announced[7] | 2018[8] | 2021-02 | – | 2867[7] | 112 MW Captive Power Plant[6] |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Main plant | Yazdani International Pvt Ltd | E100000132374 | Yazdani Steel And Power Ltd[5] | 5068656453 | E100001012099 |
Table 3: Process and Products
Phase | Main production equipment | Detailed production equipment |
---|---|---|
Main plant | DRI, other[6] | DRI (# unknown); IF (# unknown)[6] |
Expansion | DRI, unknown[6] | DRI (# unknown)[6] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Nominal crude steel capacity (total) |
---|---|---|
Main plant | operating | 72 TTPA |
Expansion | announced | 1120 TTPA[7] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 60 TTPA[6] | 60 TTPA[6] |
Expansion | announced | >0 TTPA[6] | >0 TTPA[6] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "Basic Information". Zauba Corp. 07 May, 2023. Retrieved 17 October, 2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ "Final EIA/EMP Report". MoEF&CC. July 2022. Retrieved 11 January 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs named:0
- ↑ Pioneer, The. "Odisha needs tactical initiatives to meet steel output target". The Pioneer. Retrieved 2024-12-05.
- ↑ 5.0 5.1 5.2 https://www.zaubacorp.com/company/YAZDANI-STEEL-POWER-LIMITED/U27102OR2003PLC007354.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=hH93gz76f6yPOaSbn7PCTae3e+oMkidNoi6mXyrVSa0FwEhThGNjQe9pFy0RJkLtShKTUWGq3+ovGAOhl6qKC67v1ebfghMnhf9J5UJtie4=&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzVPEh4a7F53Cae7tleKGoXIDiA7chYePNgRJpehWx3dLsaLaee8RS5VxBvVdCAnIMg=.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 https://web.archive.org/web/20210421081752/https://timesofindia.indiatimes.com/city/bhubaneswar/odisha-approves-8-investment-proposals-worth-rs-6400-crore/articleshow/80138282.cms. Archived from the original on 21 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240115055327/https://www.projectstoday.com/News/Yazdani-Steel--Power-awaits-clearance-to-augment-steel-capacity. Archived from the original on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help)