Yazdani Steel and Power Kalinganagar steel plant is a direct reduced iron (DRI) steel plant operating in Kalinganagar, Odisha, India.

Location

The map below shows the exact location of the plant in Kalinganagar, Odisha, India:

Loading map...
  • Location: Kalinganagar, Jajpur, India
  • Coordinates (WGS 84): 20.928285, 86.036604 (exact)

Background

Yazdani Steel & Power Limited is a Public incorporated on 29 October 2003 as Dinabandhu Steel & Power Ltd.[1] The company was taken over by Yazdani International Pvt ltd in May 2011, subsequent to which it was renamed Yazdani Steel & Power Limited.[2] The plant plans to expand its capacity from 70 ttpa to 1190 ttpa with an investment of INR 2,415 crores.[3] The expansion plan was approved by Odisha Government in 2021.[4] As of 2025 December, there hasn't any updates.

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Workforce size Power source
Main plant Operating[5] 2003[5] 10 MW Captive Power Plant[6]
Expansion Announced[7] 2018[8] 2021-02 2867[7] 112 MW Captive Power Plant[6]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant Yazdani International Pvt Ltd E100000132374 Yazdani Steel And Power Ltd[5] 5068656453 E100001012099

Table 3: Process and Products

Phase Main production equipment Detailed production equipment
Main plant DRI, other[6] DRI (# unknown); IF (# unknown)[6]
Expansion DRI, unknown[6] DRI (# unknown)[6]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Nominal crude steel capacity (total)
Main plant operating 72 TTPA
Expansion announced 1120 TTPA[7]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Sponge iron/DRI capacity Nominal iron capacity (total)
Main plant operating 60 TTPA[6] 60 TTPA[6]
Expansion announced >0 TTPA[6] >0 TTPA[6]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "Basic Information". Zauba Corp. 07 May, 2023. Retrieved 17 October, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  2. "Final EIA/EMP Report". MoEF&CC. July 2022. Retrieved 11 January 2024.{{cite web}}: CS1 maint: url-status (link)
  3. Cite error: Invalid <ref> tag; no text was provided for refs named :0
  4. Pioneer, The. "Odisha needs tactical initiatives to meet steel output target". The Pioneer. Retrieved 2024-12-05.
  5. 5.0 5.1 5.2 https://www.zaubacorp.com/company/YAZDANI-STEEL-POWER-LIMITED/U27102OR2003PLC007354. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=hH93gz76f6yPOaSbn7PCTae3e+oMkidNoi6mXyrVSa0FwEhThGNjQe9pFy0RJkLtShKTUWGq3+ovGAOhl6qKC67v1ebfghMnhf9J5UJtie4=&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzVPEh4a7F53Cae7tleKGoXIDiA7chYePNgRJpehWx3dLsaLaee8RS5VxBvVdCAnIMg=. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://web.archive.org/web/20210421081752/https://timesofindia.indiatimes.com/city/bhubaneswar/odisha-approves-8-investment-proposals-worth-rs-6400-crore/articleshow/80138282.cms. Archived from the original on 21 April 2021. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20240115055327/https://www.projectstoday.com/News/Yazdani-Steel--Power-awaits-clearance-to-augment-steel-capacity. Archived from the original on 15 January 2024. {{cite web}}: Missing or empty |title= (help)

Resources