Zhongxin Iron and Steel Group Co Ltd

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Zhongxin Iron and Steel Group Co Ltd (中新钢铁集团有限公司, 徐州华宏特钢集团有限公司, 徐州新华宏钢铁有限公司, 徐州新华宏钢铁工业有限公司, 徐州华宏特钢有限公司, 新沂市华宏钢铁有限公司), also known as Xuzhou Huahong Special Steel Group Co., Ltd., Xuzhou Xinhuahong Steel Industry Co., Ltd., Xuzhou Huahong Special Steel Co., Ltd., Xinyi Huahong Steel Co., Ltd., Xuzhou Xinhuahong Steel Co., Ltd., is a steel plant in Xinyi Economic and Technological Development Zone, Xinyi, Xuzhou, Jiangsu, China that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.

Location

The map below shows the exact location of the plant in Xinyi Economic and Technological Development Zone, Xinyi, Xuzhou, Jiangsu, China:

Loading map...
  • Location: No. 168 Daqiao West Road
  • Coordinates (WGS 84): 34.368618, 118.31556 (exact)

Background

The capacity replacement project started in 2020, and it was planned to build two 2050m3 BF and two 120-ton BOF. [1][2]

The project was put into production in January 2022.[3]

Plant Details

Table 1: General Plant Details

Start date Workforce size
2003-10-17[4][5] 6043[4]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Zhongxin Iron and Steel Group Co Ltd [100.0%] unknown [100.0%] E100000123218 [100.0%] Zhongxin Iron and Steel Group Co Ltd [100%][6] unknown E100000123218 [100%]

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Responsible steel Main production equipment
semi-finished, finished rolled[7] structural, bar, billet, coil, hot rolled[7] 2023-02-09[8] 2024-01-24[8] unknown BF; BOF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
operating 5400[9] 5400[9]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
operating 5846[10][11] 5846[10][11]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF NF NF NF

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year BOF production Other/unknown steel production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown unknown

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production Other/unknown iron production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown unknown

Unit Details

Table 9: Blast Furnace Details

Unit name Status Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
BF 1 operating[12] 1280.0 m3[13][14][5] 1180[10] unknown 2022-04[15]
BF 2 operating[12] 1280.0 m3[13][14][5] 1180[10] unknown
BF 3 operating[5] 2022[16] 2050.0 m3[13][5] 1743[11] unknown
BF 4 operating[5] 2022[16] 2050.0 m3[13][14][5] 1743[11] unknown

Table 10: Basic Oxygen Furnace Details

Unit name Status Current capacity (ttpa) Current size
unknown BOF (1) operating[6] 1350[9] 120.0 tonnes[13][14][5]
unknown BOF (2) operating[6] 1350[9] 120.0 tonnes[13][14][5]
unknown BOF (3) operating[6] 1350[9] 120.0 tonnes[13][14][5]
unknown BOF (4) operating[6] 1350[9] 120.0 tonnes[13][14][5]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "总投资150亿!中新钢铁集团减量置换技改项目炼铁、炼钢工程将开工"腾讯网,February 20, 2020
  2. "关于中新钢铁集团有限公司钢铁冶炼项目产能置换方案的公告",江苏省工业和信息化厅,2019-6-3
  3. "中新钢铁集团2050m3高炉全面投产",我的钢铁网,2022-01-18
  4. 4.0 4.1 https://www.gongsi.com.cn/detail/8571acf8-0559-396f-aa8e-a452347fd32d1. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 https://web.archive.org/web/20220318143030/https://factory.mysteel.com/22/0127/09/AC1EF8E5C1DF8D09.html. Archived from the original on 2022-03-18. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 https://www.qcc.com/firm/cde5ac5464bb52a899aeb64a56000b51.html. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20220129184734/http://hhtg.cc/jtgk.html. Archived from the original on 2022-01-29. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20240806171914/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%25E4%25B8%25AD%25E6%2596%25B0%25E9%2592%25A2%25E9%2593%2581%25E9%259B%2586%25E5%259B%25A2%25E6%259C%2589%25E9%2599%2590%25E5%2585%25AC%25E5%258F%25B8&fromIndex=true. Archived from the original on 2024-08-06. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 https://web.archive.org/web/20240110013755/https://mp.weixin.qq.com/s?__biz=MzUxMDYxMjAxNQ==&mid=2247545592&idx=3&sn=0a8fc7e62e65b7229fc5425f7f036869&chksm=f90235b8ce75bcae7bcb99b5a1325368d0ec776e770ca7214deedde37dfd3a9f99add1c9e7f8&scene=27. Archived from the original on 2024-01-10. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 "产能核算" (PDF). Archived from the original (PDF) on 2022-02-24.
  11. 11.0 11.1 11.2 11.3 https://m.mysteel.com/19/0605/10/C2FDA16C440ACE7C_abc.html. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 https://finance.sina.com.cn/stock/relnews/cn/2022-08-23/doc-imizirav9349263.shtml. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 https://www.ebuxiu.com/news/news?id=3696378. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 14.6 "全国规范钢铁企业拟增至263家(附全名单及其装备)". finance.sina.com.cn. 2020-03-02. Archived from the original on 2022-02-07. Retrieved 2024-11-19.
  15. https://web.archive.org/web/20240110010221/http://goodsfu.10jqka.com.cn/20220407/c638116895.shtml. Archived from the original on 2024-01-10. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 https://web.archive.org/web/20240912174223/http://finance.sina.com.cn/money/future/indu/2022-01-18/doc-ikyakumy1021007.shtml. Archived from the original on 2024-09-12. {{cite web}}: Missing or empty |title= (help)