Hubei Dazhan Iron and Steel Co Ltd

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Hubei Dazhan Iron & Steel Co Ltd (湖北大展钢铁有限公司) is an electric arc furnace (EAF) steel plant operating pre-retirement in Xiaogan, Hubei, China.

Location

The map below shows the exact location of the plant in Xiaogan, Hubei, China:

Loading map...
  • Location: Zhuzhupo Road, Yunmeng County, Xiaogan City, Hubei Province
  • Coordinates (WGS 84): 31.006752, 113.754995 (exact)

Background

According to the 2022 announcement, the company's two 35-ton electric arc furnaces will be retired and replaced as part of the 130-ton BOF technical upgrade project for Daye Huaxin Industrial Co., Ltd.[1]

Plant Details

Table 1: General Plant Details

Plant status Start date Pre-retirement announcement date Retired date Workforce size Power source
Operating pre-retirement[2] 1993[3] 2022-08-01[4] 2024-05[2] 209[5] Xiaogan Power Supply Company[6]

Table 2: Ownership and Parent Company Information

Parent company Parent company GEM ID Owner Owner company GEM ID
Daye Huaxin Industrial Co Ltd [56.3%]; Hubei Xinxin Steel Group Co Ltd [21.1%]; Jin Jun'an Investment Group Co Ltd [18.9%]; other [3.7%] E100000123261 [95.4%]; E100000001753 [4.6%] Hubei Dazhan Iron & Steel Co., Ltd.[7] E100000127095

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
finished rolled[8] rebar[8] EAF[9] 2 EAF (2x35-tonne)[9]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating pre-retirement 500 TTPA[2][10][2][10] 500 TTPA[2][10][2][10]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "省经信厅关于大冶华鑫实业有限公司130吨转炉技改项目产能(减量)置换方案的公示". 湖北省经济和信息化厅. 2022-08-02.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://m.mysteel.com/22/0905/11/A5C09229C71BE0E4_abc.html. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20220113205016/http://177267.fm086.com/Synopsis. Archived from the original on 13 January 2022. {{cite web}}: Missing or empty |title= (help)
  4. http://jxt.hubei.gov.cn/fbjd/zc/qtzdgkwj/gsgg/202208/t20220802_4246176.shtml. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240119081928/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. http://jxj.xiaogan.gov.cn/tjsj/133485.jhtml. {{cite web}}: Missing or empty |title= (help)
  7. https://www.qcc.com/firm/dd85a122d082ec417cde23880fb73549.html. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20220120022440/http://hbdzgtyxgs.21hubei.com/introduce/. Archived from the original on 20 January 2022. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 https://web.archive.org/web/20220201200840/http://hbdzsteel.cn/about/. Archived from the original on 01 February 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Resources