Jai Balaji Durgapur Unit IV steel plant, also known as JBG Durgapur, is a steel plant in Durgapur, Pashchim Bardhaman, West Bengal, India that operates blast furnace (BF), direct reduced iron (DRI), steelmaking, and electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Durgapur, Pashchim Bardhaman, West Bengal, India:
- Location: Vill – Banskopa, P.O – Rajbandh Durgapur – 713212, Burdwan, India
- Coordinates (WGS 84): 23.483075, 87.352189 (exact)
Background
Jai Balaji group has four units with in West Bengal: Unit I, Unit III, Unit IV and Unit V.
In October 2007, the West Bengal Government signed a memoranda of agreement (MoA) with Videocon Industries and Jai Balaji Industries for the setting up a three million tonnes per annum integrated steel plant and a 1,200 MW power plant in the Asansol-Durgapur region of Burdwan, with a total investment of around INR 15,000 crore.[1] The plant was inaugurated in February 2009.[2]
In 2021, the company proposed to expand its existing production capacity through modification / replacement / new addition to produce 891 thousand tonnes per annum of billets.[3] As of December 2024, there has been no updates on the project.
Plant Details
Table 1: General Plant Details
Announced date | Start date | Power source | Iron ore source | Coal source |
---|---|---|---|---|
2007-10[4] | 2009[5] | 70 MW CPP[6] | unknown | unknown |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Jai Balaji Industries Ltd | 4295873993 | E100000130703 | Jai Balaji Industries Ltd[7] | 4295873993 | E100000130703 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment |
---|---|---|---|---|
crude, semi-finished, finished rolled[8] | bar, pipe, billet, rounds, pig iron, DRI[8] | unknown | unknown | BF; DRI; EAF; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
announced | 182[9] | 396[9] | 578[9] |
operating | – | 295[6][9] | 295[6][9] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
operating | 80[9] | 120[10][9] | 200[10][9] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Coke |
---|
350[11] |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | Other/unknown steel production | Total (all routes) |
---|---|---|
2019 | 259[6] | 259[6] |
2020 | 189[6] | 189[6] |
2021 | 233[6] | 233[6] |
2022 | 346[6] | 346[6] |
2023 | 366[6] | 366[6] |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | BF production | DRI production | Total (all routes) |
---|---|---|---|
2019 | 57[6] | 84[6] | 141[6] |
2020 | 46[6] | 73[6] | 119[6] |
2021 | 56[6] | 75[6] | 131[6] |
2022 | 61[6] | 88[6] | 149[6] |
2023 | 55[6] | 82[6] | 137[6] |
Unit Details
Table 9: Blast Furnace Details
Unit name | Status | Start date | Current size | Current capacity (ttpa) | Decarbonization technology |
---|---|---|---|---|---|
unknown BF (1) | operating[9] | 2009[5] | 45.0 m3[9] | 40[9] | unknown |
unknown BF (2) | operating[9] | 2009[5] | 45.0 m3[9] | 40[9] | unknown |
Table 10: Direct Reduced Iron Furnace Details
Unit name | Status | Furnace type | Current capacity (ttpa) | Reductant |
---|---|---|---|---|
unknown DRI (1) | operating[10] | rotary kiln[12] | 30[10][9] | coal[12] |
unknown DRI (2) | operating[10] | rotary kiln[12] | 30[9] | coal[13] |
unknown DRI (3) | operating[10] | rotary kiln[12] | 30[9] | coal[13] |
unknown DRI (4) | operating[10] | rotary kiln[12] | 30[9] | coal[13] |
Table 11: Electric Arc Furnace Details
Unit name | Status | Announced date | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|
unknown EAF (1) | announced[9] | 2021[9] | 182[9] | 25.0[9] |
Table 12: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | None | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "West Bengal signs pact with Videocon, Jai Balaji Industries". www.projectstoday.com. Retrieved 2023-12-29.
- ↑ TwoCircles.net (2009-02-21). "Jai Balaji's integrated steel plant at Durgapur inaugurated". TwoCircles.net. Retrieved 2023-12-29.
- ↑ "Proposed Terms of Reference for EIA studies" (PDF). environmentclearance.nic.in/. 2021-06-07. Retrieved 2025-01-20.
{{cite web}}
: CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20240111015828/https://www.projectstoday.com/News/West-Bengal-signs-pact-with-Videocon-Jai-Balaji-Industries. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://twocircles.net/2009feb21/jai_balajis_integrated_steel_plant_durgapur_inaugurated.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 6.22 6.23 6.24 6.25 6.26 6.27 (PDF) https://jaibalajigroup.com/wp-content/uploads/2024/06/JBIL-Corporate-Presentation_GIA.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125054811/https://jaibalajigroup.com/corporate-profile/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20220120003753/https://jaibalajigroup.com/pig-iron/. Archived from the original on 2022-01-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 9.12 9.13 9.14 9.15 9.16 9.17 9.18 9.19 9.20 9.21 (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/07_Jun_2021_17373447034630698PROPOSEDTOR.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 (PDF) https://www.wbpcb.gov.in/writereaddata/files/Jai%20Balaji%20Industries.%20Ltd.%20(Unit-IV).pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.bseindia.com/xml-data/corpfiling/AttachHis/ddc283ba-e9bc-45d9-ba2a-24fdb9be6205.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 https://web.archive.org/web/20241007163451/https://pp.one/. Archived from the original on 2024-10-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 (PDF) https://web.archive.org/web/20240131193311/https://csestore.cse.org.in/pub/media/catalog/product/file/file_4_17_1.pdf. Archived from the original (PDF) on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)