Rungta Mines Kamanda steel plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Rungta Mines Kamanda steel plant, also known as Kamanda steel plant, is a steel plant in Kamanda, Nuagaon, Sundergarh, Odisha, India that operates blast furnace (BF), direct reduced iron (DRI), steelmaking, and electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Kamanda, Nuagaon, Sundergarh, Odisha, India:
- Location: Kamanda, Sundergarh, Odisha, India
- Coordinates (WGS 84): 21.928511, 85.223988 (exact)
Background
The plant was sanctioned for environmental clearance for construction in June 2020. The construction of the plant began in 2021 and is ongoing.[1]
The company has announced further expansion of the steel plant from 970 ttpa to 1774 ttpa.[2]
In August 2023, Rungta Mines Ltd placed an order with Danieli for the supply of two new, high-speed bar and wirerod mills to be installed at Dhenkanal and Kamanda Steel plants in the state of Odisha, India. These will be the fifth and sixth Danieli rolling mill projects for the Indian steel producer.[3]
Plant Details
Table 1: General Plant Details
Announced date | Workforce size | Power source | Iron ore source | Coal source |
---|---|---|---|---|
2008[1] | 2235[4] | 40 MW CPP operating (20 MW WHRB+20MW AFBC); 367 MW Captive Power Plant proposed (96 MW WHRB; 271 MW AFBC/CFBC)[5] | Rungta mines, OMC, RSPL[4][6] | South Africa[6] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Rungta Mines Ltd | 4298502619 | E100000130898 | Rungta Mines Ltd[7] | 4298502619 | E100000130898 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment |
---|---|---|---|---|
semi-finished, finished rolled[4] | billet, bar, strip, sheet, coil, wire rod[4][8] | building and infrastructure[4] | yes[9] | BF; DRI; EAF; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
announced | 504[5] | 924[4] | 1428[4][5] |
operating | – | 346[4] | 346[4] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
announced | 1036[5] | 834[5] | 1870[5] |
operating | – | 635[5] | 635[5] |
Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | Other/unknown steel production |
---|---|
2019 | unknown |
2020 | unknown |
2021 | unknown |
2022 | unknown |
2023 | unknown |
Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | DRI production | Other/unknown iron production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
2023 | unknown | unknown |
Unit Details
Table 8: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Current size | Current capacity (ttpa) | Decarbonization technology |
---|---|---|---|---|---|---|
BF 1 | announced[5] | 2016[10] | 2021[5] | 350.0 m3[5] | 453[5] | unknown |
BF 2 | announced[5] | 2016[11] | 2021[5] | 450.0 m3[5] | 583[5] | unknown |
Table 9: Direct Reduced Iron Furnace Details
Unit name | Status | Announced date | Furnace type | Current capacity (ttpa) | Reductant |
---|---|---|---|---|---|
unknown DRI (1) | operating[12][1][13] | – | rotary kiln[5] | 51[5] | coal[5] |
unknown DRI (10) | announced[5] | 2016[10] | rotary kiln[5] | 261[5] | coal[5] |
unknown DRI (11) | announced[5] | 2016[11] | rotary kiln[5] | 312[5] | coal[5] |
unknown DRI (2) | operating[12][13] | – | rotary kiln[5] | 51[5] | coal[5] |
unknown DRI (3) | operating[12][13] | – | rotary kiln[5] | 51[5] | coal[5] |
unknown DRI (4) | operating[12][13] | – | rotary kiln[5] | 51[5] | coal[5] |
unknown DRI (5) | operating[13] | – | rotary kiln[5] | 51[5] | coal[5] |
unknown DRI (6) | operating[13] | – | rotary kiln[5] | 51[5] | coal[5] |
unknown DRI (7) | operating[10] | – | rotary kiln[5] | 162[5] | coal[5] |
unknown DRI (8) | operating[10] | – | rotary kiln[5] | 167[5] | coal[5] |
unknown DRI (9) | announced[5] | 2016[11] | rotary kiln[5] | 261[5] | coal[5] |
Table 10: Electric Arc Furnace Details
Unit name | Status | Announced date | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|
unknown EAF (1) | announced[5] | 2016[11] | 504[5] | 60.0[5] |
Table 11: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI | % basic/merchant pig iron |
---|---|---|---|---|
unknown EAF (1) | yes[5] | >0[5] | >0[5] | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 (PDF) https://ospcboard.odisha.gov.in/wp-content/plugins/hearing/uploads/files_1495522042_1311705522.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Draft EIA" (PDF). Odisha State Pollution Control Board. January 2021. Retrieved 10 January 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Rungta Mines orders two more new, high-speed bar & wirerod mills ‹ Danieli". www.danieli.com. Retrieved 2025-01-23.
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 (PDF) https://ospcboard.odisha.gov.in/wp-content/plugins/hearing/uploads/files_1611318872_1509842680.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 5.22 5.23 5.24 5.25 5.26 5.27 5.28 5.29 5.30 5.31 5.32 5.33 5.34 5.35 5.36 5.37 5.38 5.39 5.40 5.41 5.42 5.43 5.44 5.45 5.46 5.47 5.48 5.49 5.50 5.51 5.52 5.53 5.54 5.55 5.56 5.57 (PDF) https://web.archive.org/web/20240115051318/https://ospcboard.org/wp-content/plugins/hearing/uploads/files_1611318872_1509842680.pdf. Archived from the original (PDF) on 2024-01-15.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 (PDF) https://forestsclearance.nic.in/writereaddata/Compliancereport/111920201stageicompliancetungta.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220111145838/https://www.therungtagroup.com/. Archived from the original on 2022-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.danieli.com/en/news-media/news/rungta-mines-orders-two-more-new-high-speed-bar-wirerod-mills_37_831.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://5.imimg.com/data5/SELLER/Doc/2024/8/441022352/KM/DV/GW/226117375/8mm-rungta-steel-500d-tmt-bar.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=Yn0uZ63wGf2mpyYM67JasJE+KOpYj/0HuO0UkPOAo2DAwk7PQ9WRqWENmiRucYIe+4UEUUSZaXO9b3oakJcAMhDCsoIb5d0Wea74+2LNPwM=&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 (PDF) https://environmentclearance.nic.in/writereaddata/modification/Amendment/Covering_Letter/151120163NFGX2D5Annexure-Coveringletter.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 (PDF) https://environmentclearance.nic.in/writereaddata/online/EC/28032019DMVGK9QFCoverletter.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 13.4 13.5 https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=oBg/JlfXM8tOeIZvXiB09y9de++hcttlaPC683t8vMS9DilRiDeqq8ntBcWg4zDOMzq5HrwFoyiobFH+FdQZzIlefys1fISqNrPsa7I5SgI=&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzWF1OLE6RXe5MiAhSH8vdQ1.
{{cite web}}
: Missing or empty|title=
(help)