SAIL Durgapur steel plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
SAIL Durgapur steel plant, also known as DSP, is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Durgapur, West Bengal, India.
Location
The map below shows the exact location of the plant in Durgapur, West Bengal, India:
- Location: Industrial Area, Durgapur, West Bengal 713203, India
- Coordinates (WGS 84): 23.548430, 87.245247 (exact)
Background
SAIL has Maharatna CPSE (Central Public Sector Enterprise) status by the Government of India under the Ministry of Steel.[1]
In 1959, DSP started production with an initial crude steel capacity of 1 mtpa, which was progressively increased to 1.8 mtpa during the modernisation which was announced in 1985 and further to 2.2 MTPA during recently completed Modernization & Expansion Plan (MEP).[2]
Under its Vision 2030 Programme, SAIL is planning a SAIL-wide expansion of 29.6 mtpa with an investment of over US $31 billion, which would entail an expansion of crude steel capacity to 7500 ttpa at the Durgapur plant.[3] The construction of the expansion project is expected to begin in 2024 and become operational by 2030.[4][3] As of September 2023, the expansion project is getting finalised.[5][6][7]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Workforce size | Power source | Iron ore source | Coal source |
---|---|---|---|---|---|---|---|---|
Main plant | Operating[8] | – | – | 1959[9] | 13279[10] | NSPCL, DVC and Emergency power from Captive Power[11] | Captive EMD Mines at Bolani / Gua[11] | Imported / BCCL Chasnala / CCL |
Expansion | Announced[12] | 2020-03-28[13] | 2024[12][14] | 2030[12] | – | NSPCL, DVC and Emergency power from Captive Power[11] | Captive EMD Mines at Bolani / Gua[11] | Imported / BCCL Chasnala / CCL |
Table 2: Ownership and Parent Company Information
Phase | State-owned entity status | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|---|
Main plant | Partial | Steel Authority of India Ltd [100%] | 4295872623 [100%] | E100001000397 [65%]; E100001000520 [9.4%] | Steel Authority of India Ltd[15] | 4295872623 | E100001000703 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|---|
Main plant | crude; semi-finished[9] | railways, joints, beams, bars[16] | building and infrastructure; transport[16] | yes[17] | yes[17] | BF, BOF[9] | coking plant (6 batteries with 78 ovens each); 2 sinter plants; 3 BOF (3x130-tonne)[18] |
Expansion | crude; semi-finished[9] | railways, joints, beams, bars[16] | building and infrastructure; transport[16] | – | – | BOF[9] | BOF[12] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | 2200 TTPA[8][8][8] | 2200 TTPA[8][8][8] |
Expansion | announced | 5300 TTPA[12][19][12][19][12][19] | 5300 TTPA[12][19][12][19][12][19] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 2700 TTPA[20][20][20] | 2700 TTPA[20][20][20] |
Expansion | announced | – | – |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Sinter | Coke | Pellets |
---|---|---|---|
Main plant | 3300 TTPA[21] | 1700 TTPA[20] | >0 TTPA |
Expansion | – | – | – |
Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF Production | Total (all routes) |
---|---|---|
2020 | 2090 TTPA[22] | 2090 TTPA |
2021 | 2230 TTPA[22] | 2230 TTPA |
2022 | 2290 TTPA[23] | 2290 TTPA |
Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | Total (all routes) |
---|---|---|
2020 | 1843 TTPA[24] | 1843 TTPA |
2021 | 2270 TTPA[25] | 2270 TTPA |
2022 | 2570 TTPA[23] | 2570 TTPA |
Blast Furnace Details
Table 9: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Furnace manufacturer and model | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
2 | operating[18] | unknown | unknown | 1969[26] | M/s Head Wrightson[27] | 1207 m³[28] | 878[20] | unknown | unknown |
3 | operating[18] | unknown | unknown | unknown | M/s Head Wrightson[27] | 1204 m³[28] | 876[20] | unknown | unknown |
4 | operating[18] | unknown | unknown | 1967-12[27] | M/s Head Wrightson[27] | 1539 m³[28] | 945[20] | unknown | 1996-04[27] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ Steel Authority of India Limited, Steel Authority of India Limited, Retrieved on: May 19, 2020
- ↑ "Durgapur Steel Plant | SAIL". sail.co.in. Retrieved 2023-09-26.
- ↑ 3.0 3.1 "SAIL proposes to increase capacity to 49.6 mtpa by 2030". The Financial Express. 2020-03-28. Retrieved 2022-03-09.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "SAIL plans next phase of capacity expansion to 50 mtpa in 2023-24". Retrieved 2023-09-29.
- ↑ "Steel Authority of India Limited Q1 FY 2024 Earnings Conference Call" (PDF). SAIL. 11 August, 2023. Retrieved 06 November, 2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ "Bengal to be big beneficiary as Steel Authority of India Ltd pushes capacity in Burnpur, Durgapur". www.telegraphindia.com. Retrieved 2023-11-06.
- ↑ Law, Abhishek (2023-05-30). "SAIL readying ₹1,00,000 cr capex plans". BusinessLine. Retrieved 2023-11-06.
- ↑ 8.0 8.1 8.2 8.3 8.4 8.5 8.6 https://web.archive.org/web/20211118102521/https://sail.co.in/en/plants/about-durgapur-steel-plant. Archived from the original on 18 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 https://web.archive.org/web/20220708154612/https://www.sail.co.in/durgapur-steel-plant/about-durgapur-steel-plant. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125061008/https://steel.gov.in/sites/default/files/Annual%20Report-Ministry%20of%20Steel%202020-21.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 https://environmentclearance.nic.in/auth/ECGeneral_Report.aspx?pid=41953.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 12.9 https://web.archive.org/web/20210227115638/https://www.financialexpress.com/industry/sail-proposes-to-increase-capacity-to-49-6-mtpa-by-2030/1911618/. Archived from the original on 27 February 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119033254/https://www.financialexpress.com/business/industry-sail-proposes-to-increase-capacity-to-49-6-mtpa-by-2030-1911618/. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.constructionworld.in/steel-news/sail-plans-next-phase-of-capacity-expansion-to-50-mtpa-in-2023-24-/29087.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220119143642/https://www.qcc.com/firm/dd1f8d7003b654e308bf075d383f6051.html. Archived from the original on 19 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 https://web.archive.org/web/20200928015057/https://sail.co.in/durgapur-steel-plant/products. Archived from the original on 28 September 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 https://web.archive.org/web/20220318230700/https://sail.co.in/index.php/en/plants/about-durgapur-steel-plant. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 18.3 https://web.archive.org/web/20200928022923/https://sail.co.in/durgapur-steel-plant/facilities. Archived from the original on 28 September 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 19.5 (PDF) http://www.iim-delhi.com/upload_publication/Met-Info-Publication_2019-09.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 20.3 20.4 20.5 20.6 20.7 20.8 20.9 http://environmentclearance.nic.in/auth/ECGeneral_Report.aspx?pid=41953.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211118113651/https://sail.co.in/en/plants/durgapur-steel-plant/facilities. Archived from the original on 18 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 22.0 22.1 (PDF) https://web.archive.org/web/20230629235701/http://sail.co.in/sites/default/files/ticker/2022-09/Sail%20Annual%20Report_2021-22.pdf. Archived from the original (PDF) on 29 June 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 23.0 23.1 (PDF) https://web.archive.org/web/20231011114647/https://sail.co.in/sites/default/files/ticker/2023-09/SAIL_Annual-Report-2022-2023.pdf. Archived from the original (PDF) on 11 October 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Estimated by prorating across SAIL plants https://sail.co.in/sites/default/files/2021-10/Sustainability-Report%202020_2021.pdf
- ↑ (PDF) https://web.archive.org/web/20220808195812/https://www.sail.co.in/sites/default/files/2022-02/Performance-highlights-Q3-FY-22.pdf. Archived from the original (PDF) on 08 August 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://archive.pib.gov.in/archive/releases98/lyr2002/rjul2002/09072002/r090720023.html#:~:text=Durgapur%20Steel%20Plant%20(DSP)%20ofcommissioned%20on%20December%2029%2C1959.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 27.0 27.1 27.2 27.3 27.4 (PDF) https://eparlib.nic.in/bitstream/123456789/761553/1/copu_08_07_1985.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 28.0 28.1 28.2 https://web.archive.org/web/20230922184144/https://www.sail.co.in/index.php/en/plants/durgapur-steel-plant/facilities. Archived from the original on 22 September 2023.
{{cite web}}
: Missing or empty|title=
(help)