Search results

From Global Energy Monitor
Results 1 – 20 of 43
Advanced search

Search in namespaces:

  • Gate LNG Terminal (category Proposed LNG terminals in Netherlands) (section Transshipment of Russian LNG)
    Gate LNG Terminal is an LNG terminal in South Holland Province, Netherlands. Expansion of the terminal's capacity is proposed. Loading map... {"type":"HYBRID"
    12 KB (1,354 words) - 21:17, 10 September 2024
  • Terneuzen FSRU (category Proposed LNG terminals in Netherlands)
    natural gas (LNG) import terminal proposed in the Netherlands. The promoter decided in February 2023 not to proceed with the project. The terminal was proposed
    2 KB (289 words) - 12:12, 6 March 2023
  • Richards Bay Coal Terminal (category Coal transport and infrastructure in South Africa) (section Proposed expansion)
    Coal Terminal is located in KwaZulu-Natal province, South Africa. The terminal is one of the world's largest coal export terminals and the largest in Africa
    13 KB (1,661 words) - 17:48, 2 December 2022
  • Fracking studies (category Pages using duplicate arguments in template calls) (section Terminals)
    past two decades. For more information, go to LNG Terminals North American LNG Import/Export Terminals: Proposed/Potential, FERC, updated Feb. 28, 2012.</ref>
    67 KB (7,443 words) - 10:46, 30 April 2021
  • workforce in the renewable energy sector, just behind Brazil. Of the approximately 266,000 jobs in the renewable sector in 2020, 194,000 were in liquid biofuels
    51 KB (4,835 words) - 17:55, 18 January 2023
  • Southern Cross Gas Pipeline (category Existing Pipelines in Argentina) (section Proposed extension to Brazil)
    pipeline ranges in diameter from 18 to 24 inches. The pipeline is supplied from Argentina's gas fields in the Neuquén Basin. An increase in Argentine fossil
    10 KB (1,425 words) - 21:28, 11 July 2024
  • Mozambique LNG Terminal (category Proposed LNG terminals in Mozambique) (section Insurgency in Cabo Delgado Province)
    Status: Proposed Formerly Shelved FID Status: Pre-FID Start Year: 2025 (presumed delayed) Mozambique LNG Terminal is a proposed onshore LNG terminal in Cabo
    36 KB (4,518 words) - 16:11, 18 July 2024
  • owned (18.57%) by Neptune Energy Netherlands B.V., managed and operated by NGT.Other shareholders in NGT: XTO Netherlands Ltd 10.08%; Rosewood Exploration
    4 KB (551 words) - 20:41, 10 August 2022
  • Nigeria-Morocco Gas Pipeline (category Proposed pipelines in Nigeria)
    m/year Length: 5,660 km Status: Proposed Start year: 2046 Cost: US$25 billion The Nigeria-Morocco Gas Pipeline was proposed in a December 2016 agreement between
    15 KB (2,395 words) - 06:42, 17 September 2023
  • fossil gas in 2017, ranking 59th in the world. Romania exported 22.65 million cubic meters of fossil gas in 2017, ranking 53rd in the world. In 2012, all
    37 KB (3,410 words) - 17:05, 10 November 2022
  • Energy Terminal, is a floating liquefied natural gas (LNG) import terminal proposed in the Netherlands. The terminal is proposed to be located in the Netherlands
    4 KB (444 words) - 21:19, 10 September 2024
  • Mons-Berneau Gas Pipeline (category Existing pipelines in Netherlands)
    Transport in Belgium – Daily Balancing with Hourly Constraints: Impact on Metering" (PDF). Retrieved Jul 26th, 2022. {{cite web}}: Check date values in: |access-date=
    5 KB (572 words) - 18:49, 4 October 2022
  • Bulgaria-Serbia Interconnector Gas Pipeline (category Proposed pipelines in Bulgaria)
    Bank. In February 2023, Netherlands-based bank ING confirmed a €49 million state-guaranteed loan with Bulgartransgaz for the project. EU investment in gas
    12 KB (1,370 words) - 19:01, 2 February 2024
  • Enecogen power station (category Oil & Gas power stations in Netherlands)
    bought Orsted's 50% stake in the project. As part of its "ambition [...] to become climate neutral [...] in 2035" Eneco has proposed running Enecogen on "Green
    6 KB (524 words) - 22:28, 13 September 2024
  • Pass, Gela, Melendugno and Gorizia), and three LNG terminals (Adriatic LNG Terminal, Panigaglia LNG Terminal and Toscana FSRU). 90 percent of imports come
    37 KB (3,602 words) - 17:08, 10 November 2022
  • NATO Pipeline System (category Existing pipelines in Country A)
    GmbH (FBG) headquartered in Bad Godesberg and established in 1956. FBG is a parent of Industrieverwaltungsgesellschaft (IVG). In war times, it is operated
    28 KB (5,861 words) - 21:06, 13 February 2023
  • Dominican petroleum in the Caribbean are slated to begin in 2021. The country has also expanded its natural gas infrastructure in recent years, with the
    21 KB (1,890 words) - 14:28, 3 May 2022
  • the EU’s LNG terminals and over 100,000km of pipeline. Eni is the largest fossil gas producer in the EU, with 4.7 billion cubic feet per day in 2020. Nederlandse
    40 KB (3,587 words) - 17:23, 10 November 2022
  • pipeline began in March 2015 and was expected to be completed in 2018. The first phase of the pipeline ("Phase 0") was commissioned in June 2018. In November
    28 KB (3,769 words) - 19:21, 31 August 2023
  • East African Crude Oil Pipeline (EACOP) (category Proposed oil pipelines in Uganda) (section Arrest of environmental activists in Uganda)
    Port Oil Pipeline, is a proposed oil pipeline in East Africa. The oil pipeline would start in Buseruka sub-county, Hoima District, in Uganda's Western Region
    40 KB (5,302 words) - 20:27, 8 October 2024
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)