Tata Steel BSL Meramandali steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Tata Steel BSL Meramandali steel plant, also known as Tata Steel Meramandali, TSM, Bhushan Steel Ltd (BSL) (formerly), Tata Steel BSL Odisha, Tata Steel Angul steel plant, is a steel plant in Meramandali, Shibapur, Dhenkanal, Odisha, India that operates steelmaking, blast furnace (BF), basic oxygen furnace (BOF), electric arc furnace (EAF), and direct reduced iron (DRI) technology.

Location

The map below shows the exact location of the plant in Meramandali, Shibapur, Dhenkanal, Odisha, India:

Loading map...
  • Location: Narendra Pur P.O. Shibapur, Meramandali, District - Dhenkanal - 759121, India
  • Coordinates (WGS 84): 20.796053, 85.260382 (exact)

Background

Bhushan Steel limited was established in 1989. The BSL Dhenkanal plant is an integrated steel plant with a capacity of 2.2 mtpa crude steel in 2009-10. With further expansion in stages using both primary and secondary steel production routes the plant now has a capacity of 5.6 mtpa.[1] On May 18, 2018, a subsidiary of Tata Steel acquired 72.65% stake in BSL.[2] On November 27, 2018, BSL was renamed Tata Steel BSL Ltd.[3] During the acquisition BSL was operating at 3.5 mtpa, much below its installed capacity.[4]

The Tata Steel BSL Dhenkanal plant is currently planning basic oxygen furnace (BOF) and electric arc furnace (EAF) expansions upto 12.8 mtpa for 2030.[5] The expansion is planned in two stages:

  • Stage I: Expansion from 5.6 mtpa to 8.2 mtpa. This involves installation of a third blast furnace and two 200 tons BOF, expected to begin commissioning by 2027.
  • Stage II: Expansion from 8.2 mtpa to 12.8 mtpa. This involves augmentation of existing blast furnace 1 and 2 to produce 3 mtpa additional hot metal, installation of a COG based Midrex Direct reduction plant of capacity 1.6 mtpa, two 100 tons EAF, and two 250 tons BOF.[1]

As of January 2025, there hasn't been many updates with regard to the expansion projects.

In February 2024, Tata Steel’s Kalinganagar and Meramandali plants received ResponsibleSteelTM Certification.[6]

Accidents

On 13 November, 2013, a deadly fire accident at the blast furnace 2 of the plant killed one worker and injured 19 others, following which the furnace was temporarily sealed by the Directorate of Factories and Broilers. According to a 2013 news article, BSL has witnessed several accidents and had so far claimed more than 100 lives since its inception.[7] According to government data, by 2013, 66 persons died in the plant since 2006, and the plant faces 70 criminal cases.[8]

On 13 June, 2023, 19 workers at the plant sustained burn injuries due to a mishap in one of the blast furnaces which lead to the escape of hot steam from a pipe.[9]

Plant Details

Table 1: General Plant Details

Announced date Start date Workforce size Power source Iron ore source Coal source
2003[10] 2007[10] 1425[11] Estimated overall power requirement after implementation of expansion- 1632 MW(638 MW to be met by CPP and remaining 994 MW to be drawn from theGrid)[12] Captive iron ore mines in Odisha[13] imported[12]

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Partial Tata Steel BSL Ltd 4295873662 E100001000862 Tata Steel BSL Ltd[14] 4295873662 E100001000862

Table 3: Process and Products

Steel product category Steel products ISO 14001 Responsible steel Main production equipment
semi-finished, finished rolled[15] pipe, cold rolled, coil, sheet[15] yes[16] 2023-12-19[17] BF; DRI; BOF; EAF; Steel other/unspecified

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Electric arc furnace steelmaking capacity Other/unspecified steelmaking capacity Nominal crude steel capacity (total)
announced 6070[12][18] 1550[19][18] 7620[12][19][18]
operating 3000[18] 422[12] 2088[18] 5510[12][18]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
announced 4300[18] 1600[18] 5900[18]
operating 5700[20] 1500[12] 7200[12][20]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Coke Pellets
8587[18] 2100[21] NF

Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year BOF production EAF production Other/unknown steel production Total (all routes)
2019 unknown[22] 1344[22] [22] 1344[22]
2020 unknown[16] unknown[16] 4080[16] 4080[16]
2021 2668[23] 375[23] 1857[23] 4900[23]
2022 2695[24] 379[24] 1876[24] 4950[24]
2023 2809[25][26] 395[25][26] 1956[25][26] 5160[25][26]

Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production DRI production Other/unknown iron production Total (all routes)
2019 unknown unknown unknown
2020 unknown unknown unknown
2021 3477[23] 1113[23] [23] 4590[23]
2022 3484[24] 1116[24] [24] 4600[24]
2023

Unit Details

Table 9: Blast Furnace Details

Unit name Status Announced date Start date Furnace manufacturer and model Current size Current capacity (ttpa) Decarbonization technology
BF 1 operating[20] 2010[27][28] MECON (Govt. of India); Paul Wurth Paul Wurth Blast Furnace Design[29][30][29] 1681.0[12] 2500[20] Installing Paul Wurth coke oven gas injection system, expected to be commissioned by Q1 2026[31][32][33]
BF 2 operating[20] 2013[27][28] MECON (Govt. of India); Paul Wurth[29][30] 3814.0[30] 3200[20] unknown
BF 3 announced[19] 2016[18] 2030[19] 5800.0[18] 4300[18] unknown

Table 10: Direct Reduced Iron Furnace Details

Unit name Status Start date Furnace manufacturer and model Furnace type Current capacity (ttpa) Reductant
unknown DRI (1) operating[28] 2007[28] Lurgi[34] rotary kiln[35] 150[12] coal[18]
unknown DRI (10) operating[28] 2007[28] Lurgi[34] rotary kiln[35] 150[12] coal[18]
unknown DRI (11) announced[18] 2030[19] Midrex[12] shaft furnace[12] 1600[18] waste gas recovery (coke oven gas)[18]
unknown DRI (2) operating[28] 2007[28] Lurgi[34] rotary kiln[35] 150[12] coal[18]
unknown DRI (3) operating[28] 2007[28] Lurgi[34] rotary kiln[35] 150[12] coal[18]
unknown DRI (4) operating[28] 2007[28] Lurgi[34] rotary kiln[35] 150[12] coal[18]
unknown DRI (5) operating[28] 2007[28] Lurgi[34] rotary kiln[35] 150[12] coal[18]
unknown DRI (6) operating[28] 2007[28] Lurgi[34] rotary kiln[35] 150[12] coal[18]
unknown DRI (7) operating[28] 2007[28] Lurgi[34] rotary kiln[35] 150[12] coal[18]
unknown DRI (8) operating[28] 2007[28] Lurgi[34] rotary kiln[35] 150[12] coal[18]
unknown DRI (9) operating[28] 2007[28] Lurgi[34] rotary kiln[35] 150[12] coal[18]

Table 11: Electric Arc Furnace Details

Unit name Status Announced date Furnace manufacturer and model Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[18] CONARC 422[12] 60.0[27][28]
unknown EAF (2) announced[19] 2016[12] 775[19] 100.0[19][18]
unknown EAF (3) announced[19] 2016[12] 775[19][18] 100.0[19][18]

Table 12: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % HBI
unknown EAF (1) yes[18] 2.83[18] 79.38[18] 17.79[18]
unknown EAF (2) yes[18] 9.16[18] 90.84[18]
unknown EAF (3) yes[18] 9.16[18] 90.84[18]

Table 13: Basic Oxygen Furnace Details

Unit name Status Announced date Start date Current capacity (ttpa) Current size
unknown BOF (1) operating[18] 1500[18] 200.0 tonnes[12][28]
unknown BOF (2) operating[18] 1500[18] 200.0 tonnes[12][28]
unknown BOF (3) announced[19] 2016[12] 2027[12] 1485[12] 200.0 tonnes[19][18][36]
unknown BOF (4) announced[19] 2016[12] 2027[12] 1485[12] 200.0 tonnes[19][18][36]
unknown BOF (5) announced[19] 2016[12] 1550[18] 250.0 tonnes[19][18]
unknown BOF (6) announced[19] 2016[12] 1550[18] 250.0 tonnes[19][18]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "Pre-feasibility report for proposed expansion from 5.6 mtpa to 12.8 mtpa" (PDF). MoEF&CC. April 2016. Retrieved 11 October, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. Tanya Thomas (2018-05-18). "Tata Steel buys Bhushan Steel, to settle dues of Rs35,200 crore". mint. Retrieved 2023-10-11.
  3. Hungama Digital Services. "Bhushan Steel Limited is Tata Steel BSL Limited now". www.tatasteel.com. Retrieved 2023-10-11.
  4. Ankit Gohel (2023-10-11). "HDFC AMC Q2 net profit may rise 11% to ₹404 crore; revenue seen up 15% YoY". mint. Retrieved 2023-10-11.
  5. "Latest Developments in Steelmaking Capacity 2021" (PDF). OECD. Retrieved 2022-04-08.{{cite web}}: CS1 maint: url-status (link)
  6. Services, Hungama Digital. "Tata Steel's Kalinganagar and Meramandali plants receive ResponsibleSteelTM Certification". www.tatasteel.com. Retrieved 2025-01-24.
  7. "Bhushan Steel's killer blast furnace sealed". Business Standard. 14 November, 2013. Retrieved 11 October, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  8. "Dhenkanal plant faces 70 criminal cases | Bhubaneswar News - Times of India". The Times of India. Retrieved 2023-10-11.
  9. "19 injured in blast furnace mishap at Tata Steel's Dhenkanal plant in Odisha". The Indian Express. 2023-06-13. Retrieved 2023-10-11.
  10. 10.0 10.1 (PDF) https://web.archive.org/web/20241206013325/https://www.ipaicmai.in/IPANEW/UploadFiles/Casestudy/Bhushan_Power.pdf. Archived from the original (PDF) on 2024-12-06. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20210324055101/http://tatasteelbsl.co.in/know-us/tata-steel-bsl-at-a-glance/. Archived from the original on 2021-03-24. {{cite web}}: Missing or empty |title= (help)
  12. 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 12.14 12.15 12.16 12.17 12.18 12.19 12.20 12.21 12.22 12.23 12.24 12.25 12.26 12.27 12.28 12.29 12.30 12.31 12.32 12.33 (PDF) http://environmentclearance.nic.in/writereaddata/Online/TOR/08_Apr_2016_144914843AB7KF4JBAnnexurePreFeasibilityReport.pdf. {{cite web}}: Missing or empty |title= (help)
  13. "TATA STEEL - Integrated report & annual accounts 2021-22". www.tatasteel.com. Archived from the original on 2024-12-06. Retrieved 2024-12-05.
  14. (PDF) https://web.archive.org/web/20220111172857/https://www.tatasteel.com/media/14540/tata-steel-corporate-brochure-fy20-21.pdf. Archived from the original (PDF) on 2022-01-11. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 https://web.archive.org/web/20200716132754/http://tatasteelbsl.co.in:80/company.html. Archived from the original on 2020-07-16. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 16.2 16.3 16.4 (PDF) https://web.archive.org/web/20220318084004/https://tatasteelbsl.co.in/Investor%20Relations%20pdf/Financial%20Reporting/Annual%20Report/Annual%20Report%20for%20FY%202020-21.pdf. Archived from the original (PDF) on 2022-03-18. {{cite web}}: Missing or empty |title= (help)
  17. https://www.responsiblesteel.org/issued-certificates-and-ongoing-audits. {{cite web}}: Missing or empty |title= (help)
  18. 18.00 18.01 18.02 18.03 18.04 18.05 18.06 18.07 18.08 18.09 18.10 18.11 18.12 18.13 18.14 18.15 18.16 18.17 18.18 18.19 18.20 18.21 18.22 18.23 18.24 18.25 18.26 18.27 18.28 18.29 18.30 18.31 18.32 18.33 18.34 18.35 18.36 18.37 18.38 18.39 18.40 18.41 18.42 18.43 18.44 18.45 18.46 18.47 18.48 18.49 (PDF) https://web.archive.org/web/20240119033914/https://environmentclearance.nic.in/writereaddata/Online/TOR/08_Apr_2016_144914843AB7KF4JBAnnexurePreFeasibilityReport.pdf. Archived from the original (PDF) on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  19. 19.00 19.01 19.02 19.03 19.04 19.05 19.06 19.07 19.08 19.09 19.10 19.11 19.12 19.13 19.14 19.15 19.16 19.17 19.18 (PDF) https://web.archive.org/web/20210929032946/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf (PDF). {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)
  20. 20.0 20.1 20.2 20.3 20.4 20.5 (PDF) http://worldpetrocoal.in/download/WPCC-2020-PPT/KS-VII/Saroj-Banerjee.pdf. {{cite web}}: Missing or empty |title= (help)
  21. (PDF) https://www.tatasteel.com/media/15101/environmental-clearance-for-56-mtpa-integrated-steel-plant-tsl-meramandali.pdf. {{cite web}}: Missing or empty |title= (help)
  22. 22.0 22.1 22.2 22.3 (PDF) https://web.archive.org/web/20211117141829/https://steel.gov.in/sites/default/files/MoS%20AR%20Eng.pdf. Archived from the original (PDF) on 2021-11-17. {{cite web}}: Missing or empty |title= (help)
  23. 23.0 23.1 23.2 23.3 23.4 23.5 23.6 23.7 (PDF) https://web.archive.org/web/20221108121601/https://www.tatasteel.com/media/15928/tata-steel-ir-2021-22.pdf. Archived from the original (PDF) on 2022-11-08. {{cite web}}: Missing or empty |title= (help)
  24. 24.0 24.1 24.2 24.3 24.4 24.5 24.6 24.7 (PDF) https://web.archive.org/web/20240125045719/https://www.tatasteel.com/media/18370/tata-steel-ir-2022-23.pdf. Archived from the original (PDF) on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  25. 25.0 25.1 25.2 25.3 https://avenuemail.in/tata-steel-produces-record-20-5-million-ton-steel-in-2023-24-fiscal-md-tv-narendran/. {{cite web}}: Missing or empty |title= (help)
  26. 26.0 26.1 26.2 26.3 (PDF) https://web.archive.org/web/20241206013536/https://www.tatasteel.com/investors/integrated-report-2023-24/pdf/tata-steel-limited-ir-2024.pdf. Archived from the original (PDF) on 2024-12-06. {{cite web}}: Missing or empty |title= (help)
  27. 27.0 27.1 27.2 https://web.archive.org/web/20220326060904/http://spongeironindia.com/members.php. Archived from the original on 2022-03-26. {{cite web}}: Missing or empty |title= (help)
  28. 28.00 28.01 28.02 28.03 28.04 28.05 28.06 28.07 28.08 28.09 28.10 28.11 28.12 28.13 28.14 28.15 28.16 28.17 28.18 28.19 28.20 28.21 28.22 28.23 28.24 https://web.archive.org/web/20200801154548/http://tatasteelbsl.co.in:80/historynew.html. Archived from the original on 2020-08-01. {{cite web}}: Missing or empty |title= (help)
  29. 29.0 29.1 29.2 https://studylib.net/doc/5535054/design-features-of-indian-blast-furnaces. {{cite web}}: Missing or empty |title= (help)
  30. 30.0 30.1 30.2 https://web.archive.org/web/20220525172438/http://www.meconlimited.co.in/Metals/Iron_Making.aspx. Archived from the original on 2022-05-25. {{cite web}}: Missing or empty |title= (help)
  31. https://web.archive.org/web/20240610162405/https://www.aist.org/news/steel-news/2024/june/3-7-june-2024/indian-mill-places-order-for-coke-oven-gas-injecti. Archived from the original on 2024-06-10. {{cite web}}: Missing or empty |title= (help)
  32. https://www.sms-group.com/press-and-media/press-releases/press-release-detail/tata-steel-selects-sms-group-to-spearhead-decarbonization-initiative-with-innovative-coke-oven-gas-injection-technology. {{cite web}}: Missing or empty |title= (help)
  33. https://www.seaisi.org/details/24826?type=news-rooms. {{cite web}}: Missing or empty |title= (help)
  34. 34.0 34.1 34.2 34.3 34.4 34.5 34.6 34.7 34.8 34.9 https://web.archive.org/web/20220326060904/http://spongeironindia.com/members.php. {{cite web}}: Missing or empty |title= (help)
  35. 35.0 35.1 35.2 35.3 35.4 35.5 35.6 35.7 35.8 35.9 "2021 World Direct Reduction Statistics" (PDF). Midrex. 2022-09-01. Archived from the original (PDF) on 2022-10-08.
  36. 36.0 36.1 https://web.archive.org/web/20220119232244/https://www.moneycontrol.com/news/business/tata-metaliks-kharagpur-plant-ramp-up-to-be-complete-by-fy21-4378351.html. Archived from the original on 2022-01-19. {{cite web}}: Missing or empty |title= (help)

Resources