Vlora-Fier Gas Pipeline
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Vlora-Fier Gas Pipeline is a proposed gas pipeline running within Albania.
Location
The pipeline is proposed to run between the Trans-Adriatic Gas Pipeline and the Vlora power station.[1]
Project details
- Parent: Albgaz Sh.a[2]
- Capacity: 1 bcm/y[3]
- Length: 40 km[1]
- Diameter: 400 mm[2]
- Status: Proposed
- Start year: 2025
- Cost: €21.86 million (US$24.9 million)[4]
- Financing:
- Identifiers:
- Associated Infrastructure: Trans-Adriatic Gas Pipeline and Vlora power station[1]
Background
The pipeline project is also known as the "Trans-Adriatic-Pipeline (TAP) Exit Point to Vlora Thermal Power Plant (TPP) gas pipeline project"[1] and "IAEF - Vlora CCGT Pipeline"[2] When constructed, it will allow natural gas to flow from the TAP to the Vlora thermal power plant in Albania.[5]
The FEED study took place in 2018, permitting between 2018 and 2019, and FID in 2019.[2]
The technical assistance project 'Detailed Design and Tender documents for the Fier – Vlora gas pipeline' was launched in June 2020.[6]
Albgaz, Excelerate and Snam signed a Memorandum of Understanding on the possibilities of cooperation for the construction of the Fier-Vlora pipeline in July 2021.[7]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 WBIF. "Fier – Vlora Gas Transmission Pipeline". Western Balkans Investment Framework.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 ENTSOG (July 10, 2020). "TYNDP 2020 - Annex A - Projects Details" (PDF). European Network System Operators for Gas. Retrieved October 5, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Jonuzaj, Klaudjo (June 14, 2018). "Azerbaijan's SOCAR to prepare a feasibility study for Fier-Vlora pipeline in Albania – report". SeeNews. Retrieved October 5, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Ten Year Network Development Plan 2020 - Annex A - Projects Tables, ENTSOG, accessed Dec. 5, 2021
- ↑ "TAP to build exit point in Fier in 2-3 years". Albania Daily News. Mar 22nd, 2022. Retrieved Jul 5th, 2022.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ Western Balkans Investment Framework (July 7, 2020). "EU Supports Additional Technical Assistance to Gas Transmission Network in Albania". WBIF. Retrieved Oct 5, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Memorandum for LNG terminal, construction of Fier-Vlora pipeline and distribution of liquefied gas signed". politiko.al. Retrieved 2021-10-05.
Related GEM.wiki articles
External resources
External articles
*add as many countries as the pipeline passes through