Background
SSAB Raahe plant began operations in 1964.[1] In January 2022, SSAB announced its plan to convert the SSAB Raahe steel plant blast furnace (BF) to a 100% renewables-based hydrogen direct reduced iron (H-DRI) and electric arc furnace (EAF) facility between 2030-2040.[2] It is unclear if the plant's capacity will change. SSAB plans to bring fossil-free steel to the steel market by 2026 through operations at the SSAB Oxelösund steel plant.[2]
Table 1: General Plant Details==
Plant status | Start date | Workforce size |
---|---|---|
operating[3] | 1964[3] | 2500[4] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Owner | Owner company PermID |
---|---|---|---|
SSAB AB [100%][3] | 4295889873 [100%] | SSAB AB[3] | 4295889873 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|
semi-finished; finished rolled[3] | hot rolled, coiled; billets[3] | 2021[5] | blast furnace (BF) and basic oxygen furnace (BOF)[3] | coking plant; 1 BOF (BOF-BF production planned to be transitioned to EAF production by 2030)[6][3][7] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum):
Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|
2600 TTPA[8] | 2600 TTPA |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum):
Blast furnace capacity | Nominal iron capacity (total) |
---|---|
2600 TTPA[9] | 2600 TTPA |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter | Coke |
---|---|
>0 TTPA[10] | >0 TTPA[3] |
Low-emissions/green steelmaking
This steel plant is associated with a green steel project tracked in the Green Steel Tracker. Details about the project are included below.
Table 1: Green Steel Project Details
Project 1 | |
---|---|
Project name | HYBRIT finland |
Company | SSAB |
Company has climate goals? | Yes |
Location | Raahe, Finland |
Project website | Site |
Project scale | Full scale |
Project status | Announced |
Year to be online | 2030 |
Technology to be used | BF-BOF to EAF |
Technology details | BF/BOF to scrap-EAF conversion |
Iron production capacity (million tonnes per year) | Not stated |
Steel production capacity (million tonnes per year) | Not stated |
CO2 capture (million tonnes CO2 per year) | Not applicable |
Hydrogen generation capacity (MW) | Not stated |
Investment size (m USD) | Not stated |
Partners | LKAB, Vattenfall |
Date of announcement | 2019-12-04 |
Plant Details
Table 2: General Plant Details
Start date | Workforce size |
---|---|
1964[11] | 2500[12] |
Table 3: Ownership and Parent Company Information
State-owned entity status | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Partial | SSAB AB | 4295889873 | E100000001651 | SSAB AB[11] | 4295889873 | E100000001651 |
Table 4: Process and Products
Steel product category | Steel products | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
---|---|---|---|---|---|
semi-finished, finished rolled[11] | billet, coil, hot rolled[11] | 2024-08-19[13] | no[13] | no | BF; DRI; BOF; EAF |
Table 5: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
announced | – | 2600[14] | 2600[14] |
operating pre-retirement | 2600[15] | – | 2600[15] |
Table 6: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
announced | – | 0 | 0 |
operating pre-retirement | 2600[16][17] | – | 2600[16][17] |
Table 7: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel | Sinter | Coke | Pellets |
---|---|---|---|
NF | 0[18] | >0[19] | NF |
Table 8: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF production | Other/unknown steel production | Total (all routes) |
---|---|---|---|
2019 | unknown | unknown | – |
2020 | unknown | unknown | – |
2021 | unknown | unknown | – |
2022 | 2155[20] | unknown[20] | 2155[20] |
2023 | 2298[20] | –[20] | 2298[20] |
Table 9: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | BF production | Other/unknown iron production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
Unit Details
Table 10: Blast Furnace Details
Unit name | Status | Start date | Retired date | Furnace manufacturer and model | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|
BF 1 | operating pre-retirement[12] | 1964[21] | 2030[22] | – | 1300[17][16] | unknown | 2023-01[23] |
BF 2 | operating pre-retirement[12] | 1976[21] | 2040[22] | Paul Wurth (parts)[24] | 1300[17][16] | unknown | 2019-03[25] |
Table 11: Direct Reduced Iron Furnace Details
Unit name | Status | Current capacity (ttpa) |
---|---|---|
unknown DRI (1) | announced[14] | 0 |
Table 12: Electric Arc Furnace Details
Unit name | Status | Current capacity (ttpa) |
---|---|---|
unknown EAF (1) | announced[14] | 2600[14] |
Table 13: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) |
---|---|---|---|---|---|
unknown EAF (1) | yes[26] | >0[26] | >0[26] | unknown | >0[26] |
Table 14: Basic Oxygen Furnace Details
Unit name | Status | Retired date | Current capacity (ttpa) | Current size |
---|---|---|---|---|
unknown BOF (1) | operating pre-retirement[14] | 2030[14] | 2600[15] | 125.0 tonnes[27] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "SSAB – vahvempi, kevyempi ja kestävämpi maailma". SSAB (in suomi). Retrieved 2023-10-10.
- ↑ 2.0 2.1 First in fossil-free steel. Using HYBRIT Technology, SSAB, Retrieved on: May 14, 2021
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 https://web.archive.org/web/20201204122521/https://www.ssab.fi/ssab-konserni/tietoja-ssabsta/tuotantopaikkakunnat-suomessa/raahe. Archived from the original on 2020-12-04.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220705145653/https://www.ssab.com/fi-fi/ssab-konserni/tietoja-ssabsta/tuotantopaikkakunnat-suomessa/raahe. Archived from the original on 2022-07-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220130111746/https://www.ssab.com/download-center. Archived from the original on 2022-01-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221107074552/http://www.ssab.com/en/news/2022/01/ssab-plans-a-new-nordic-production-system-and-to-bring-forward-the-green-transition. Archived from the original on 2022-11-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220117051005/https://www.ssab.fi/ssab-konserni/tietoja-ssabsta/tuotantopaikkakunnat-suomessa/raahe/kohti-fossiilivapaata-terastuotantoa. Archived from the original on 2022-01-17.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220720020702/https://www.ssab.com/Company/Investors/Reports-and-presentations. Archived from the original on 2022-07-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Estimated to be same as BOF capacity
- ↑ (PDF) http://www.diva-portal.org/smash/get/diva2:701138/FULLTEXT01.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 https://web.archive.org/web/20240125055328/https://www.ssab.com/fi-fi. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 https://web.archive.org/web/20220705145653/https://www.ssab.com/fi-fi/ssab-konserni/tietoja-ssabsta/tuotantopaikkakunnat-suomessa/raahe. Archived from the original on 2022-07-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 https://web.archive.org/web/20220130111746/https://www.ssab.com/download-center. Archived from the original on 2022-01-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 14.6 https://www.spglobal.com/commodityinsights/en/market-insights/latest-news/energy-transition/012822-ssab-to-spend-475-bil-to-transform-nordic-production-to-green-steel-by-2030.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 https://web.archive.org/web/20220720020702/https://www.ssab.com/Company/Investors/Reports-and-presentations. Archived from the original on 2022-07-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 https://www.ssab.com/en/company/about-ssab/the-earth-calls-for-action/transforming-from-a-position-of-strength.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 https://web.archive.org/web/20220526095440/https://www.spglobal.com/commodityinsights/en/market-insights/latest-news/metals/102319-ssab-europe-to-idle-another-blast-furnace-on-weak-eu-market. Archived from the original on 2022-05-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.mdpi.com/2075-4701/10/7/972.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://filtrabit.com/ssab-steelworks-raahe/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 20.3 20.4 20.5 (PDF) https://mb.cision.com/Public/980/3947345/8aab378c035efea5.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 https://web.archive.org/web/20221129202042/https://www.viktormacha.com/galerie/ssab-raahe-raahe-439/. Archived from the original on 2022-11-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 22.0 22.1 https://web.archive.org/web/20220629135353/https://afry.com/en/project/towards-fossil-free-steelmaking-ssab-finland. Archived from the original on 2022-06-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240322052414/https://gmk.center/en/news/ssab-to-shut-down-one-blast-furnace-at-finnish-raahe-plant-in-november/. Archived from the original on 2024-03-22.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220929093913/https://www.paulwurth.com/wp-content/uploads/2020/08/Brochure-Refractory-and-Engineering-Hot-Blast-Stoves-en.pdf. Archived from the original (PDF) on 2022-09-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.thefreelibrary.com/SSAB+Europe+to+carry+out+repair+and+maintenance+work+at+blast+furnace...-a0572553541 https://www.ssab.com/en/news/2022/02/unplanned-production-outage-in-raahe-affects-first-quarter-results, https://www.thefreelibrary.com/SSAB+Europe+to+carry+out+repair+and+maintenance+work+at+blast+furnace...-a0572553541.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 26.0 26.1 26.2 26.3 https://web.archive.org/web/20240111013633/https://www.ssab.com/en/company/sustainability/sustainability-documents. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://link.springer.com/article/10.1007/s11663-023-02859-5.
{{cite web}}
: Missing or empty|title=
(help)